ICAO WGN New Orleans Nov 2004

Slides:



Advertisements
Similar presentations
An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
Advertisements

LINK2000+ Status Søren Dissing
LINK update Datalink Implementation EC Regulation 29/2009
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Economic issues Formulation of Business cases H. Sudarshan
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Flight Operations.
RVSM Implementation in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
VDL 2 capacity simulations
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Technology Roadmaps H. Sudarshan
An Airline Perspective
ATN London - 23 September 2003 Alex Wandels
WORLD-WIDE CNS/ATM SYSTEMS IMPLEMENTATION CONFERENCE
Rome November 2008 Johan Martensson, CASCADE
SIP/2012/ASBU/Nairobi-WP/7
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
FANS (Future Air Navigation System) Flight Crew Procedures
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
World-Wide CNS/ATM Systems Implementation Conference
Aeronautical Communications Global Needs Global Solutions
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
IBAC – CNS/ATM Datalink Briefing
Technology Roadmaps H. Sudarshan
PROGRESS & CHALLENGES ATCOS’ VIEWS
The Single European Sky Implementation Programme: SESAME
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
VDL 2 capacity simulations
Balanced Approach to Noise Mitigation
Workshop on preparations for ANConf/12 − ASBU methodology
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Balanced Approach to Noise Mitigation
Presentation transcript:

ICAO WGN New Orleans 10-19 Nov 2004

Contents Programme Overview Incentives and a Mandate Issues Conclusion

data link to supplement voice The LINK 2000+ Programme Co-ordinating the implementation of en-route CPDLC (ACM, ACL, AMC, DLIC) over ATN/VDL2 . Providing a migration path for legacy data link services from ACARS to ATN/VDL2. Programme Objectives data link to supplement voice

Do we need CPDLC? YES 2015: +50% 2010: +24% LINK: +11% CASCADE: +?% RNP RNAV: +?% LINK: +11% Mode S: +5% 2015: +50% 2010: +24% The pioneer support scheme for airlines consists of a grant to cover the upgrade from VDL2 to ATN/CPDLC and the use of our test facility in Bretigny. This Test Facility can emulate an aircraft or an area control centre and can as such prepare aircraft and centres for operations without interfering with operations or requiring specific test flights The scheme is a reality. 45 aircraft are contractually committed and the money is flowing and the tests have started. We have been criticised for what we are doing here, but lets face it Airlines receiving money from EUROCONTROL, that must be a good thing. For centres other than Maastricht, we are still in the approval phase. We hope to be able to give a grant to 4 or 5 centres that will go pre-operational or operational in 2006. They will also have access to the LINK Test Facility. A decision is expected in November. What is important here also is to note that we have created a LINK Integration Team where all the implementers and their suppliers sit around the table to tackle the practical implementation problems in an expeditious manner.

Do We Have a Business Case? YES LINK CBA - Recently Updated confirming previous conclusions Sensitivity Analysis: key uncertainties are clear. Risk Analysis: does not show any risk of loosing money for both ANSP and Airline All CBAs conducted for CPDLC implementation show a compelling case for both airlines and ANSPs All CBAs have been based on conservative assumptions, steadily refined with the use of more accurate input data CPDLC is a very cost effective capacity enabler http://www.eurocontrol.int/link2000/files/LINK%202000+%20CBA_Review_2_0.pdf

Ground implementation proceeds ACC Implementations Maastricht UAC: since June 2003 Karlsruhe UAC (DFS) 2007 Canarias ACC (Aena) 2006/2007 Reims ACC (DNA) Roma ACC (ENAV) Lisboa ACC (Nav Portugal) Switzerland UAC (skyguide) Shannon UAC (IAA) NEWLY JOINED Ground implementation proceeds ENAV LINK area upper airspace: 2008

Aircraft Equipage Discussions with others ongoing Lufthansa 20 B737 NG now 13 B767 now 5 A300-600ST 3rd Q 04 20 A320 1st Q 05 19 B737 NG Certified 15+ A310 1st Q 05 20 B737 1st Q 05 2 B737 1st Q 05 20 A320 end 06 Airborne implementation has started Lufthansa Generating more than 170,000 CPDLC flights/year Discussions with others ongoing

A Three-step Approach 1 2 3 Pioneers Incentives Mandate Objective: 100+ aircraft equipped. Incentives Objective: more than 25% of flights equipped by 2007 through route charge modulation in LINK airspace. Mandate Objective: more than 75% of flights equipped at the end of the decade. 2 3

The Mandate Mandatory Carriage Exemptions ENPRM in 2004 SES Process (via ICB) Upper Airspace of the “LINK area” Mandate for ACCs and new aircraft: 2009 Mandate for old aircraft: 2014 ENPRM Approved IATA/AEA Exemptions State Aircraft FANS 1/A long haul Usual exemptions

2 Incentives Mandate Pioneers Reduced ANSP cost Equipage=Benefits 75% Equipage=Benefits Reduced ANSP cost Better flight profiles Less misunderstandings Higher Productivity Less delay Pioneers 25% 2006/7 2009 2014

Incentives 2 The principles Options equipped aircraft → less workload → lower costs cost savings returned to equipped aircraft full cost recovery maintained Options Route charge Reduction (e.g. 2%) for equipped compensated increase for non-equipped Investment grant innovation fund contributes to equipage costs ultimately funded by route charges cost may be deferred by borrowing Differential route charges equipped aircraft pay a lower unit rate funded by ANSP cost savings no reduction for non-equipped aircraft innovation Rejected IATA/AEA

LINK Will Deliver Current plans Benefits 2006: ~7% CPDLC equipped flights 2009: 25% CPDLC equipped flights 2014: 75% CPDLC equipped flights Benefits 2006: awareness, experience, inventive use 2009: capacity benefits are evident 2014: full capacity benefits > Lower unit rates In a Nutshell