Tuesday Fill 1494 dumped by operations at 09.00 (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of Week 16 G. Arduini, J. Wenninger
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Sunday morning Recovering from 400 kV disturbance.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Tuesday 22 November 2011.
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Tuesday Access…. QPS intervention at 09:00 in point 8 (quench heater exchange) QPS installation oscillo for the ISRM measurement EPC intervention in point.
Thursday Morning/Afternoon
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
Monday 152 bunch operation summary
Presentation transcript:

Tuesday Fill 1494 dumped by operations at 09.00 (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30 Access for flooding alarm in point 4. In parallel: BI Vacuum to replace controller for 2 vacuum gauges for injection kicker 18:30 Power converter problem during pre-cycle (RQT13.L2B2), already occurred several times  Access 20:00 Pre-cycling 21:30 injection 00:30 STABLE BEAMS #1496 06:00 Beam dump and Start preparation proton MD

Fill 1494 End of physics 1494: 0.25 mb-1 in 6.5 hours

Fill #1495 Injection starting at 10:00 Large emittance in the V-plane B2 particularly  correlated with V- injection oscillations B2  Corrected  B1-H: 2.4 mm B1-V: 2.9 mm B2-H: 3.0 mm B2-V: 4.0 mm B1H: 3.2 mm B2H: 3.7 mm B1V: 3.2 mm B2V: 7.0 (!) mm

Fill #1495 13:00 RF beam dump due: ACSModuleM1B2 :: He tank Pressure interlock Level 2 exceeded (Quench) Decided to give access for flooding alarm at the bottom of PZ45 appeared at ~12:30 and after verification by TI and CV  Problem was real (water level in the sump reached high level because the water pump did not start - float was stuck) but no flooding.

Fill #1496 00:30 Stable Beams #1496 Intensities on Fast BCT displayed in Page 1 underestimated after installation of the attenuators and expert intervention  to be followed up today 06:15 Beams dumped to start switch-over to protons: ~0.3 mb-1 delivered in ~6 h. In total ~2 mb-1

Proton MD program Start time Duration [h] Wed 17 06:00 Dump and precycle – Switch to protons 08:00 4 Interlock checks 12:00 7 Injection and damper checks for 75ns 19:00 22 Injection of trains of 24/48 bunches and e-cloud measurements Thu 18 17:00 Switch to 50ns, injection and damper checks 21:00 6 Test ramp with pilots Fri 19 03:00 10 Ramp 9x12 50ns bunches 13:00 5 Stability measurements, 50ns and 75ns beams 18:00 22:00 Back to ion physics Total MD time 64 8:30 meeting