Progress Report January 2016

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

Homes.
New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
Homeowners’ meeting JMB is seeking to make service charges clearer and more fair, not higher or lower overall No cross-subsidy between leaseholders and.
Historic Buildings Grant-Aid Scheme Details Built Heritage Directorate NIEA.
SHQS – is your landlord going to meet the target? Alan Russell Senior Manager (Housing Condition & Supply) Fife Council.
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
122, 124, 126 Palatine Road, Blackpool, Lancashire, FY1 4DS Of interest to investors Opportunity for a strong Return On Investment 13 flats spread over.
UPAVON PARISH COUNCIL PUBLIC MEETING WHISTLEDOWN FARM DEVELOPMENT 04 JUNE 2014.
2013 FINANCIAL REPORT. Balance Sheet Summary As of December 31, 2013.
Moray Street, Macduff: Insulation and Renovation Project SUMMARY The Moray Street Project involves local authority homes which have an extensive history.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Key Findings and Implications for the Future from the Stock Condition Survey undertaken by Savills Presented by Winston Williams January 2008.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Technical boclair academy Building Drawings.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
The West London Free School Palingswick House Update.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
How to build a two storey house
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Housing Associations A way to improve the inner city.
FOR SALE REAR 12/14 OLIVE GROVE BLACKPOOL LANCS FY3 9AS Extensive range of lock up garaging, storage and office accommodation Potential for residential.
Understanding Manufactured Home Inspections. Tips for a Professional Inspection  Ask for referrals  Call NACHI / InspectorSEEK.com  Hire a licensed.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
A WEALTH OF INFORMATION REHAB / REPAIR. CONTRACTORS ADVICE CALL HIM - DON’T YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
FOR SALE Flat F, Lincoln Court 143 Hornby Road Blackpool FY1 4JG Two bedrooms Garage to the rear PVCu double glazing Price: £69,950 Purpose built, self.
Albany Town Hall Restoration Project 2010 The Albany Improvement Association would like to show you what your generous donations have allowed them to accomplish.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Housing Tour 2012 Linda Nash. Project visited Tresham Site Bridle Road – Burton Latimer Naseby Road Margaret Road - Roofs and Doors Rosewood Place Sackville.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Progress Report September 2015 Prepared by Kim Randall Development Officer Hastoe House Association Morris Close Burwash.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
St Michael’s C of E Primary School Front of School Enhancements
Prepared by Kim Randall Development Officer Hastoe House Association
EDENSVILLE ESTATE SIMAWA.
Curriculum for Excellence
RIBA Plan of Work 2013.
Prepared by Frank Cooney B.Arch MRIA
COST PLANNING AND ESTIMATION
Progress Report November 2015

20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
The Hollies, Ravenshead
Building Drawings.
Important Things About Pre Purchase House Inspections
Location Plans & Site Plans
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
J bathroom/ hi bedroom/ I kitchen
Value of contract: Length of contract: Contract start date:
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Resource and Funding Workshop Funding for Heritage Projects
Venture Plan Sections All Venture Plans should include the following sections: Executive Summary Market Analysis Resource Analysis Operating Strategy.
Eaton MEDC, Sutton-In-Ashfield
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
RIBA Plan of Work 2013.
Presentation transcript:

Progress Report January 2016 Morris Close Burwash Progress Report January 2016 Prepared by Kim Randall Development Officer Hastoe House Association

Scheme Review RG Carters have been unable to secure air tightness due to failure in the membrane To achieve air tightness all units need to be stripped back to timber stud and new membrane installed All kitchens are in the process of being removed and stored in a secure unit until remedial works are completed Roof lights have been leaking, inspection highlighted they have not been fitted correctly Removal of roof tiles and exposure to gables and roof lights for repair has commenced Plots 1,2 & 3 plasterboard has been removed and the versaliner exposed ready for installation of new membrane Electrical first fix services have been removed New front doors have been installed to all units Scaffolding erected for external repairs to commence.

Remedial Works New doors installed, rear wall has been stripped back to timber battens Plasterboard has been removed to expose the versaliner New membrane to be installed over the versaliner and floor area

Key Project Dates Description Date Contract commencement date 29.06.14 Structural investigation & repair 30.11.15 – 18.12.15 Roofing light repairs 01.02.16 Remedial works finalised 15.02.16 Snagging & desnagging 28.05.16 – 17.06.16 Fit out of units 29.02.16 – 28.05.16 Estimated handover date 20.06.16

Scheme Details 8 x affordable units 2 x shared ownership 10 units in total 1 x 1 bedroom bungalow 2 x 1 bedroom flats 2 x 2 bedroom flats 4 x 2 bedroom houses 1 x 3 bedroom house Site possession 08.04.14

Hastoe Housing Team - Brede

Contact List Hastoe RG Carter Rother Council Kim Randall - Development Officer 020 8973 0427 krandall@hastoe.com Responsible for managing the development of the scheme RG Carter Nick Pitcher- Site Manager Contact details T.B.C Responsible for site management Rother Council Amy Fearn – Housing and Asset Development Officer – 01424 787514 Amy.Fearn@rother.gov.uk Responsible for allocation queries and Rother Council waiting lists for local residents

Summary Uncovering sections of previously completed work has revealed additional areas of concern therefore delaying site progress. Although this is a major disappointment we had anticipated additional problems and had added extra time within the program to action any unforeseen issues. We have commenced remedial works on these areas and finalised the detail to secure air tightness which is required to achieve Passivhaus standards. We are still looking to handover on 20.06.16, but this still remains a provisional date Hastoe would like to apologise for any inconvenience caused due to the delay for this scheme and we want to thank the Parish Council & Local Authority for their continued support.