Downtown Valdosta Truck Traffic Mitigation Study

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
US 52 Corridor Study Public Meeting November 15, 2010.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Southern Bridge Project Brown County Executive
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Minnesota State Planning Conference September 28, 2011.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
City of Charlottesville
ROUNDABOUTING WHAT YOU NEED TO KNOW
Secor Road Reconstruction Project Public Meeting #2
32 Transportation Midway City 2016 General Plan
The Central Avenue Connector Trail
Downtown Valdosta Truck Traffic Mitigation Study
Central Polk Parkway PD&E Study
June 5, 2017.
Project Management Team Meeting #3
Interstate 15 North Phase 4 8/19/2015 Update
Center City Connector 101.
Downtown Truck Traffic Study
NGTA Halton Planning and Public Works Committee
Gateway Specific Plan Concepts
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
D Line Station Plan Overview
Status Report on Rochester’s DMC Transportation Plan
Southern Bridge Project Brown County Executive
North-South Corridor Bus Rapid Transit Project
M14A/D Select Bus Service
Minnesota State Planning Conference September 28, 2011
Parks Highway Reconstruction: Lucas Road to Big Lake Road
MPO Board Meeting Briefing
Chicago to Council Bluffs-Omaha
I Street Bridge Replacement Project
Presentation transcript:

Downtown Valdosta Truck Traffic Mitigation Study Southern Georgia Regional Commission Dike Ahanotu and Christopher Lindsey May 10, 2016

Overview and Approach Primary Project Goal – Develop traffic improvements for local and through truck traffic along U.S. 84 Task Structure Task 1 - Assemble existing data on truck movements in downtown Valdosta Task 2 - Collect new data on truck movements, primarily through using truck-following techniques Task 3 – Stakeholder outreach Task 4 – Alternatives evaluation

New Data – Truck Travel Patterns

Truck Following Data Collection – Phase 1 Trucks were followed from two locations: U.S. 84 and I-75 U.S. 84 and Inner Perimeter Road Goals were to: Estimate percent of through trucks Identify local destinations for U.S. 84 trucks

Data Collection Results - Phase 1 Only 2% of trucks followed stopped in downtown Destinations to the south were much more common than destinations to the north I-75 Starting Point Inner Perimeter Road Starting Point Destination Region No. of Trucks Percent of Total Through Downtown Core and Entire Valdosta Region 15 42% 18 62% Through Downtown Core – stopping south of downtown 7 19% 8 28% Through Downtown Core – stopping north of downtown 3 8% 0% Through Downtown Core – stopping east of downtown* 9 25% Through Downtown Core – stopping west of downtown* 1 3% 10% Destination Within Downtown Core Total 36 100% 29 *A small portion of trucks did not go through downtown at all

Truck Following Data Collection – Phase 2 Trucks were followed from just west and east of downtown core Goal was to collect similar information as Phase 1 on a larger sample of trucks

Data Collection Results – Phase 2 2% of trucks followed stopped in downtown Destinations to the south were common for trucks followed from the east of downtown West Downtown Starting Point East Downtown Starting Point Destination Region No. of Trucks Percent of Total Through Downtown Core – exiting to the east 105 91% 0% Through Downtown Core – exiting to the west 82 74% Through Downtown Core – exiting to the south 4 3% 24 22% Through Downtown Core – exiting to the north 2 2% 3 Destination Within Downtown Core Total 115 100% 111 The vast majority of trucks are making through trips – nearly 96% in both directions. Intuitively, Log trucks and Hoppers never stop downtown. Other truck types rarely stop downtown, though Vans and Straight/ Single Unit trucks may be delivering to downtown businesses. Besides US 84, Lee Street and Oak Street are most often used by trucks with local deliveries

Truck Travel Paths

Truck Travel Paths

Truck Travel Paths

Truck Travel Paths

Stakeholder Outreach

Stakeholder Interviews Public Sector - City of Valdosta, Lowndes County, Valdosta Main Street, Valdosta Development Authority, GDOT Private Sector - IDP Housing, Southeastern Freight Lines, Archer Daniels Midland (ADM), ASA Engineering, Prime Properties, Outsource Logistics, Valdosta- Lowndes Chamber of Commerce Quality of Life Issues Confirmed Truck volumes and speeds through downtown create negative impacts related to noise, vibrations, and ability to hold events downtown Pedestrian mobility negatively impacted and sidewalks are often damaged Mixed opinions on importance of passenger vehicle traffic for downtown businesses Freight operations Motor carriers prefer to avoid downtown, but there are no better alternatives Bypass alternatives should limit turns, avoid rail crossings and have simple, straightforward routing and signage

Evaluating Alternatives

Description of Alternatives There are 5 primary alternatives for alleviating downtown truck traffic Do Nothing Western Perimeter Bypass South Bypass Savannah Avenue Parkway Bypass South of Savannah Avenue Bypass

Description of Alternatives Near Downtown

Description of Modeled Alternatives Do-Nothing – No significant change in downtown roadway Savannah Ave. Pkwy (All Vehicles) - connect to Wells and Forrest Streets, make 2-way for entire stretch. Increase design speed from 25 mph to 35 mph Savannah Ave. Pkwy (Trucks-Only) – same as above, but for trucks only Savannah Ave. Pkwy (4-lanes, all vehicles) – Upgrade to a four- lane state route (new U.S. 84) South of Savannah Ave. – Build new 4-lane roadway south of Savannah Avenue Parkway with design speed on 45 mph (new U.S. 84). South Bypass – 4-lane roadway. Mix of existing and new lanes. Restricts truck traffic from Central Ave. and Hill Ave. (new U.S. 84)

Modeling the Diversion of Truck Traffic Travel demand model used to measure the change in traffic volumes at 8 downtown locations. Alternatives evaluated based on: Truck traffic diverted away from downtown Impacts on downtown passenger vehicle traffic Impacts of the alternatives on downtown businesses, residents, and visitors Consistency with current long-range plans High-level cost considerations Safety implications

Truck Volume Model Results Location Daily Truck Volumes (2010) 2040 Do- Nothing 2040 Savannah Ave. Pkwy. (All Vehicles) 2040 Savannah Ave. Pkwy. (Trucks Only) 2040 Savannah Avenue Parkway (4 Lanes) 2040 South of Savannah Ave. 2040 South Bypass West Central Ave. 1,200 27% -11% -68% -15% -33% -100% East Central Ave. 790 57% 11% -54% -22% -20% West Hill Ave. 1,270 14% -29% -85% -62% -56% East Hill Ave. 600 50% 2% -93% -66% -65% South Patterson St. 1,170 -7% -45% -40% -21% -16% South Ashley St. 940 3% -24% -26% -14% 67% West Savannah Ave. 200 55% 850% 2,670% 1,310% -80% 220% East Savannah Ave. 32% 282% 823% 450% -18% 228% To some degree, all of the alternatives decrease truck traffic in downtown. The Savannah Avenue and South Bypass alternatives, however, are projected to remove the most trucks from downtown.

Passenger Volume Model Results Location 2010 Daily Pax Vehicle Volumes 2040 Do- Nothing 2040 Savannah Ave. Pkwy (All Vehicles) 2040 Savannah Ave. Pkwy (Trucks Only) 2040 Savannah Ave. Pkwy (4 Lanes) 2040 South of Savannah Avenue 2040 South Bypass West Central Ave. 5,610 31% -2% 49% 3% -13% 42% East Central Ave. 3,560 33% -1% 50% -41% -32% 41% West Hill Ave. 5,830 23% -17% 39% -34% -33% 34% East Hill Ave. 3,030 52% 79% -50% 64% South Patterson St. 6,780 15% -7% 4% 7% 17% South Ashley St. 24% 8% 22% 2% 6% 9% West Savannah Ave. 1,350 18% 537% -100% 801% -91% -19% East Savannah Ave. 2,890 286% 429% -6% 0% Many alternatives likewise decrease passenger vehicle traffic in downtown. However, the South Bypass and the trucks-only Savannah Avenue alternative would increase passenger traffic.

Evaluation of Other Impacts Potential Impacts Do Nothing Savannah Ave. Parkway (All Vehicles) Savannah Ave. Parkway (Trucks Only) Savannah Ave. Parkway (4 Lanes) South of Savannah Avenue South Bypass Impact to Downtown Businesses ○  Vehicle Safety Pedestrian Safety Federal & State Approval  Impact to EJ Areas Right-of-Way Needs Consistent with Previous Plans Time/Impact of Construction Wetlands  Likely positive impact  Likely negative impact ○ Likely minimal impact

Next Steps Refine evaluation of alternatives based on feedback Develop set of recommendations in consultation with the MPO Develop final report Project end date – June 30th