Dave Bailey University of Manchester

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Beam Background and Detector Layout 4th Concept Collaboration Meeting FNAL October 2006.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
> >
Selection Sort
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
(a) (b) (c) (d). What is (1,2,3)  (3,4,2)? (a) (1, 2, 3, 4) (b) (1,2)  (3,4) (c) (1,3,4,2) (d) (3,1)  (4,2)
31 October 01Plans for ECAL Involvement Plans for UK involvement in ECAL (CALICE) Paul Dauncey Imperial College z Status of (non-UK) ECAL work z What is.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
Estimation of Radiation Effects in the Front-End Electronics of an ILC Electromagnetic Calorimeter V. Bartsch, M. Postranecky, M. Warren, M. Wing University.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Changes to assessment:
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
Uniformity in ATLAS EM Calo measured in test beams  Constraints on the EM calorimeter constant term  Energy reconstruction  Uniformity results with.
Selection Sort
PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   Elizabeth Locci SPP/DAPNIA, Saclay, France Prague.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Discussion: CLIC Detector HCal Design and Parameter Optimization K. Elsener, W. Klempt, L. Linssen, N. Nikiforou CLIC Detector Optimization Meeting CERN,
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Dead zone analysis of ECAL barrel modules under static and dynamic loads Marc Anduze, Thomas Pierre Emile – LLR CALICE Collaboration Meeting.
Hcal Geometry and Assembly
Felix Sefkow DESY LDC at Vienna November 17, 2005
Layout of Detectors for CLIC
Overview Detector details Crystals Photo-detectors
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
SDHCAL Integration Moi j’aime bien SAFARI
Status of Ecal(s) for ILD
Calorimeter Occupancies University of Cambridge
ECAL project in the future 2-3 years
IFR detector mechanics
Towards a realistic Scintillator HCAL with SiPM read-out
New Design for Beam Test Structure
- chambers & absorbers -
HCAL Modules -First Ideas
ILD Optimisation: towards 2012 University of Cambridge
prototype PCB for on detector chip integration
Scintillator HCAL: LOI issues
ECAL electronics schedule
ECAL Electronics Status
UK CMS Oversight Committee Mtg
Beam RF Effects Update Mike Woods, SLAC
Assembling/Dismanteling Method of the Socket
Hit Density Geant 3 scoring planes
WP4 Dave Bailey 5th May 2006.
Test Beam models in Mokka
CMS-Bijing weekly meeting
Presentation transcript:

Dave Bailey University of Manchester Endcap Design Dave Bailey University of Manchester

TESLA TDR Layout ECAL endcap 4 quadrants 2 quadrants bolted together to make one structural unit Bolted to the HCAL front face “Embedded” in the HCAL endcap Each quadrant is about 5 tonnes

Monolithic Endcap Single quadrants Could use the same ideas as the barrel to hold the slabs Long slabs close to the beampipe Does this impact on the DAQ due to more beam-related backgrounds?

Modular Endcap Should the endcap be made up from smaller units? Keeps the slab size small Fewer problems with signals routed over long PCBs? Mechanically more robust? But Some “odd shapes” More cracks Physics Impact?

So what should we do? Look at both types of structure What sort of modules to use Start with current barrel ideas Think about assembly of individual quadrants Need to assess impact on physics Get any new designs into simulation Set up local replica of Mokka database in Manchester to use with Tier 2 centre