HMA Follow On Activities

Slides:



Advertisements
Similar presentations
ISeries Skip Upgrade External Sales Presentation September,2005.
Advertisements

WRAP Technical Support System Project Update AoH Call October 19, 2005.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
ITU Liaison on T-MPLS Stewart Bryant
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Architecture DWG Closing Plenary Report
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
HMA Follow On Activities
HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Mid Term – AWG Summary
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA AWG Configuration Management Status 1 December 2008
Technical Meeting ESA/ESRIN,
HMA Follow On Activities
Heterogeneous Missions Accessibility HMA Architecture Working Group
HMA Follow On Activities
Software Configuration Management
Ordering Services for EO Products SWG ATS / ETS
HMA Identity Management Status
HMA-S Final Presentation OGC DSEO Protocol
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA SPS Mandatory I/F Development
HMA Follow On Task 4 - Order Preliminary Review 2-3 February 2010
Ordering Services for EO Products SWG ATS / ETS
GeoJSON(-LD) Encoding of Granule Metadata
HMA Follow On Activities
Standards Development: An Overview
Engineering Processes
HMA Follow On Activities
DocTeam SC Report to TC 94th OGC Technical Committee Barcelona Spain
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
EO Data Access Protocol
HMA Follow On Activities
Standardisation Status Update
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
WG Technical Editor’s Report
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
DSC Governance Sub Group Recommendations
Pier Giorgio Marchetti - European Space Agency
CEOS OpenSearch Project
SWE 2.0 – Current Status of Standards
WG Technical Editor’s Report
HMA for Science Task 1 – Project Management
DAIL RIDS are posted to SSE wiki
QoS Metadata Status 106th OGC Technical Committee Orléans, France
EO profile for WMS progress report
Presentation transcript:

HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting 2 March 2010 Reuben Wright, Deimos Space

Schedule Deliverables Actions Work in Progress SPS 2.0 SPS Extension for EO SFRE Requirements SFRE Development

Schedule 1/2

Schedule 2/2

Proposal Information: List of Documentation Deliverables

Proposal Information: List of Software Deliverables

New actions from PR 02/02/10 open The current deliverables URD and SRD do not match the structure of the SSS, SRS and SDD documents. To be aligned. Spotimage to propose an alignment with EO GML data model for pieces where there is overlap. A possibility would be URNs referring to the EO GML specification. [At AWG it was noted that these could be stored in a sub-space of the OGC registry. Note that this uses URLs (not URNs) and RDF descriptions.] EO specific use cases and scenarios (including notification) should be included in one of the Task 2 deliverables. Old use cases and interaction diagrams from HMA-I Scenario TN can be redrawn. Spotimage/Deimos should review the old HMA-I Scenario TN, extract the old scenarios and use cases, validate them with the new evolution (e.g. reserve, confirm) since and update these scenarios and use cases. Should be included in one of the Task 2 deliverables. DLR recommends to include also the scenario from GSCDA operational scenarios about tasking. SPS Tasking Parameters: ESA requests Spotimage to check this list of parameters and see if it maps on descending, ascending etc. There is not yet a consensus on the list of parameters. DLR expresses doubt that Stereoscopic radar would fit these programming parameters. Spot Image will check. If not applicable to radar, this should be explained in the specification. closed Spotimage to reply to the post on the Forum from MDA about SPS. Spotimage to list which are the possible bottlenecks for approval of the EO SPS specification, e.g. dependency on SPS 2.0 approval + SWECommon approval etc. Send email about this including date the specification was sent to OAB. Other HMA-FO tasks to register to the “Ordering SWG”. on www.opengeospatial.org/projects/groups/swg Action to organise a joint teleconf (programming/ordering) with MDA to better understand the tasking scenario where delivery options should be passed at tasking time without a separate ordering service. ESA requests the other tasks to use the Task 4 SRS and SDD deliverables as reference and also apply the ECSS-E-ST-40C in a similar way for their RB and TS deliverables. The currently existing deliverables are to be reorganized accordingly. [see also action 34]

Status: released as an RFC Work in Progress: SPS 2.0 Status: released as an RFC There were several caveats: The OAB will provide comments in parallel during public comment period. OAB members to use twiki to capture comments. As per the OGC Policies and Procedures, there must be a technical presentation to the OGC Membership. This can happen at the closing Plenary in Frascati. There is also OAB guidance as to how requirements might be better documented. This guidance will be provided during the public comment period. To better match the OGC Specification Model Requirements pulled out of text and labelled with URIs Specification organised by requirements classes (including ATS)

Work in Progress: SPS Extension for EO Status Drafted throughout To be done Requirements pulled out of text and made explicit ATS reorganised to match requirements classes

Work in Progress: SFRE Requirements Requirements Baseline Documents Version 1.0 documents asked to be reworked Most recent ECSS 40C used New documents are Software System Specification (SSS) and Software Requirements Specification (SRS) RIDs All minor (other than document reorganisation) and implemented Process Last review at Deimos and Astrium needed, then will be reissued

Work in Progress: SFRE Development Development meeting EADS Astrium, Toulouse 25/02/10 Decisions taken regarding process, scope, configuration Development process Multiple release strategy will be adopted. Allows for much more confidence in integration Release 0 of SF Server (previous SPS 0.9.5 software updated to SPS 2.0 schemas) is ready to test Software Design Document (SDD) Decision taken to produce an integrated document for both SF Client and SF Server ECSS 40C will be followed