SC6 Work Group on VR Plugs

Slides:



Advertisements
Similar presentations
SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Advertisements

SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
API 6A VR Plug Work February 2015 Report David Zollo on behalf of Tom Lambert.
New Item API Standard 6A718 Proposed New Macro Etchant Paul Maxwell 30 June 2011.
Progress Since January Meeting
Outlook Lesson 5 Managing Contacts Microsoft Office 2010 Advanced Cable / Morrison 1.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
Kent Grebing, API SC 16 Chair
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Use of API 6A vs ISO in marking 6A equipment
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
The X Dimension - Mandatory or Not? The back face ID (“X”) dimension on 6B flanges carries a note: Reference dimension. It does not meet the usual definition.
BALLOT STATION. DUTIES OF THE BALLOT STATION: Account for and Secure Ballots Issue the Correct Ballot to Eligible Voters.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
WG on Composite Cements: Composite cement Annex for API Spec 10A - Ballot Result and Analysis Washington DC, June 2016, Heiko Plack.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
IT workshop.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Calhoun County Chief Deputy Clerk of Elections
API SC 10, Work Group 3 Update:
Tim Haeberle API SC Winter Meeting
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
وكيفية عمل التقدير النجمي
Your Goals and Objectives
API 16C Choke and Kill Equipment
API S64 Summer Conference Update.
2016 Exploration & Production Standards Conference Subcommittee 10
API Standard 6X: API/ASME Design Calculations
February 2016 Report David Zollo / Tom Lambert
Specification on float equipment
Use of API 6A vs ISO in marking 6A equipment
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 59 June 2017 Recommended Practice for Well Control Operations
Motion – P Rev/D2 to Sponsor Ballot
Subtracting Real Numbers
API 16 AR Specification for Drill-through Equipment Remanufacturing
Closing IEEE 802 EC Friday 15th March 2019
2016 Exploration & Production Summer Standards Conference
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
Specification on float equipment
API 10 F.
API SC 10 WG15 Stage Cementing Collars
2nd Edition: 2019 Winter Standards Meeting
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Motion – P Rev/D2 to Sponsor Ballot
API Specification 6A Keel Block Requirements New Item
SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
IWG TYREGTR 17th Meeting* Brussels, ETRTO Office, 2-3 November 2017
API Specification 6A Keel Block Requirements
Presentation transcript:

SC6 Work Group on VR Plugs SC6 Summer Meeting June 14, 2012 Bob Barnett / Jean Brunjes

SC6 Work Group on VR Plugs Item 1: API 6A Annex L precludes the use of 15M-20M preps in 2M-10M outlets. Item 2: There is no 15M-20M prep for the 4-1/16” outlet. Item 3: Existing service tools may not be able to make up or break out the 4-1/16” 10M VR plug.

SC6 Work Group on VR Plugs Summary of WG Activities Allow the use of the HPVR preps in 2M-10M outlets. Develop a plug and prep for the 4-1/16” HPVR. Remove 4-1/16” VR preparation and plug dimensions from 2M-10M tables.

SC6 Work Group on VR Plugs Summary of WG Activities Refer to the preps and plugs as “VR” for 2M-10M. Refer to the preps and plugs as “HPVR” for 15M-20M. Add “ASME B1.8 Stub Acme Threads to Section 2 (Reference Standards). Remove 2nd sentence of 1st paragraph of 10.22.1 – ‘four sizes and 2 pressure ratings’.

SC6 Work Group on VR Plugs Summary of WG Activities Remove Section L.4 (duplicate of 10.22.4 - Materials). Remove Section L.5 ( duplicate of 10.22.6 – QC). Remove L.7 (duplicate of 10.22.7 – Marking). Remove L.8 (duplicate of 10.22.8 – Storing and Shipping).

SC6 Work Group on VR Plugs Plan Forward Confirm dimensions for 4-1/16” HPVR plug and prep. Complete the analysis of the 4-1/16” HPVR plug and prep. Prepare annex for ballot. Send annex and analysis (as supporting documentation) to API for ballot distribution.