AIXM 5 Development Status

Slides:



Advertisements
Similar presentations
ADQ Implementation Workshop Austro Control – Status and Issues
Advertisements

The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Introduction to Digital NOTAM
AIXM 5.1 implementation experience
V0.2 © 2013 Avitech GmbH Friedrichshafen ● Bratislava ● Frankfurt/Main ● Konstanz ● Madrid Avitech GmbH Exchange Formats and Products The Aeronautical.
EUROCONTROL’s Efforts with AIXM
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
Presented to: Federal Architects By: Kim W. Barnette, Ph.D. Aeronautical Information Management Federal Aviation Administration Date: April 11, 2007 Federal.
European AIS Database (EAD)
Digital AIM Training - Digital NOTAM
1 xNOTAM Trial Presentation xNOTAM Workshop #2 Brussels, November 2007 Item 6 European Organisation for the Safety of Air Navigation.
EUROCONTROL Digital NOTAM Project
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
European AIS Database SIGMA & SDO Data Completeness
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
The European Organisation for the Safety of Air Navigation ARINC 424A specification and SESAR WP9.31 AIXM Procedure Modelling/Encoding seminar Brussels.
The European Organisation for the Safety of Air Navigation EUROCONTROL’s Efforts with AIXM AIXM 5.1 XML Developers' Seminar #4 – Mar 2010.
By: Date: Federal Aviation Administration Review of 2007 South and Central America AIXM workshop Federal Aviation Administration May 2009 AIXM Seminar.
1 AIXM 5 Design Concepts. 2 AIXM 5 Design Methodology Build upon lessons learned from AIXM 4.x If possible incorporate industry and international standards.
1 Digital NOTAMs – A new paradigm. 2 Discussion Points NOTAMs – what are they? Recommendations from the AIM Global Congress Components of a digital NOTAM.
1 Digital NOTAM Towards a concept of operations xNOTAM Workshop #2 Brussels, November 2007 Item 2 European Organisation for the Safety of Air Navigation.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
The European Organisation for the Safety of Air Navigation Aeronautical Information Exchange Model (AIXM) – Business Rules.
UNCLASSIFIED 1 Digital Geospatial Information Working Group (DGIWG) Jeffrey Bell – NGA Aeronautical Harmonization Working Group Chair Briefing to AIXM.
Singapore Workshop – Technical Focus - 16 June 2008 Temporality and Encodings Concepts and Examples Presented by Brett Brunk Aeronautical Information Management.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
The European Organisation for the Safety of Air Navigation AIXM UML to XSD AIXM XML Developers' Seminar.
27-29 May 2003 Alexandre PETROVSKY Paul BOSMAN EUROCONTROL
AIXM XML Schema aspects. Copyright EUROCONTROL 2011 AIXM 5 – Design Objectives Capabilities Extensibility Flexible Exchange Flexible Messages Static and.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
FR-AIS Technical Architecture Speaker: Thomas LUTZ Author: Hannes BRUNNER Washington, March 2008.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
Introduction to Digital NOTAM
AIXM 5.1 XML Developers' Seminar #2 – Dec 2009
Introduction to AIXM The purpose of this briefing is to present the evolution of AIXM from a specification intended to support AIS automation and static.
What’s New with AIXM 5.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
Welcome and Introduction
Introduction and Welcome
Digital NOTAM Towards a concept of operations
4 - 8 November 2013 AIM relevant - Assembly conclusions
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM 5.2 – WIP AIXM CCB – Webex 09 MaY 2017.
Digital AIM Training - AIXM
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
Advancing Digital NOTAM implementation
AIXM CCB meeting EUROCONTROL HQ, Brussels
Aerodrome & Heliport The use case presentation has revealed just a few of the new applications and services that could be developed on the foundation offered.
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Digital AIM Training - AIXM
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
Introduction and Welcome
AIXM 5.1 – Interoperability issues
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
Digital AIM Training - AIXM
Eddy Porosnicu EUROCONTROL
Welcome and Introductions
Welcome and Introductions
Introduction to Digital NOTAM
Welcome and Introductions
Eddy Porosnicu EUROCONTROL
Aeronautical Information Exchange Model (AIXM) – Business Rules
Digital AIM Training - Introduction Introduction – day 2
Presentation transcript:

AIXM 5 Development Status

AIXM – the first versions Sources AIP AIXM is a standard for aeronautical information dissemination that has been based on: ICAO Annex 15 “data to support international air navigation” Industry standards like ARINC 424 (for encoding terminal procedures) Other standards and best practices Real world aeronautical information publications It also took into consideration aspects that are not subject to formal requirements. Examples: route usage restrictions, declared distances from runway/taxiway intersections, airspace aggregations, fuel types, etc. AICM (the conceptual part of AIXM) - Started by Eurocontrol in 1996 AIXM – started in 1997 First attempt “SQL based” Move to XML in 1999 EAD operational since 2003 – All European States are expected to have joined the EAD by end 2008

AIXM - Internationalization Complete Data Model (Military/Civilian) Global Requirements Standards (ISO) The internationalization of AIXM really began in 2003 after the release of version 3.3. Set-up of the AIXM Change Control Board (ACCB) with international participation (States and industry) The United States Federal Aviation Administration, United States National Geospatial Intelligence Agency and EUROCONTROL began to collaborate on expanding AIXM to cover global civilian and military aviation needs. Major early activities included assessing AIXM model coverage and updating lists of values. In SEP 2005 AIXM 4.5 was released. This was the first release that incorporated suggestions from the international community and was a good test of consensus based configuration management.

AIXM 5 - Global Standard AIXM We think the future of AIXM as the global standard for aeronautical data is very promising. States outside Europe, such as Japan, Canada, United States have decided to base their new AIM systems on AIXM. The Global AIS Congress, which took place in June 2007 and gathered representatives from more than 90 States world-wide, has adopted a number of recommendations. The first one asks: “ICAO adopt the AICM/AIXM as the standard aeronautical information conceptual model and the standard aeronautical information exchange model, and develop appropriate means of compliance, and global mechanisms to manage and develop the AICM/AIXM” In order to match the expectations of the global AIS community, an AIXM Design Team, organised in cooperation between EUROCONTROL and FAA, with the support of the international community, is developing the next AIXM version 5. This shall fully satisfy the global AIM needs.

Mission Based on global aeronautical data requirements ICAO standards and practices Industry requirements Modular and extensible Support current and future AIM information system requirements Digital AIPs Automated charting and publications Integrated digital NOTAMs Aerodrome Mapping Databases and applications Situational displays Etc. The goal for AIXM 5 is to provide an extensible, modular aeronautical information exchange standard that can be used to satisfy information exchange requirements for current and future aeronautical information applications. These applications include: Automated production of Aeronautical Information Publications (AIPs) Automated aeronautical chart creation and publication systems Integrated NOTAMs (e.g., xNOTAM) Aerodrome Mapping Databases (AMDBs) and related applications Electronic Flight Bag data requirements Cockpit situational displays and Flight Management System (FMS) data requirement

AIXM components Conceptual (content) Model Exchange format specification AIXM support AIM in two ways: The AIXM conceptual model describes the features in the aeronautical domain and can be used as the logical basis for AIM databases. Does this mean that your AIS database must copy the AIXM UML model? No, but the class definitions are derived from ICAO and industry requirements so your system should have similar aeronautical features and properties. By ensuring that your systems can map to the conceptual model, you are making it easier for your system to communicate using AIXM. The AIXM XML Schema is an exchange format specification for aeronautical data, which can be used to electronically transmit aeronautical data to others. It is positioned as an international standard for aeronautical data exchange between systems. In version 3 and 4, the conceptual model was using entity-relationship methodology. This has now been replaced by UML in version 5. The encoding was always based on XML, but in version 5 it also becomes compliant with the Geography Markup Language (GML).

Timeline AIXM 3.3

AIXM 5 RC 1 First draft UML model and XML schema Starting from AIXM 4.5 Still missing many features and attributes that are necessary in order to support digital NOTAMs

Timeline AIXM 3.3

AIXM 5 RC 2 Support for Airport Mapping Database (AMDB) Obstacle model -> Vertical Structures model Full compliance with the Geography Markup Language (ISO 19136) XML Schema Refinement of the Temporality model Punctual corrections and extensions following feedback from the stakeholder community

Timeline AIXM 3.3

AIXM 5 RC 3 Objectives model for Aerial Refuelling Routes model for Military Training Routes “Digital NOTAM” message format revision of the Service model ? rules for AIXM application schemas

Validation and implementation AIXM 3.3

AIXM 5 trials EUROCONTROL FAA (TU Darmstadt, 2006) AMDB-xNOTAM (TU Darmstadt, 2007) Procedures-xNOTAM xNOTAM Trial (JAN-JUN 2008) FAA Digital NOTAM submission project …more details after the lunch break!