Don Wright Director of Standards Lexmark International

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PWG Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #2 and #3 of this presentation Advise the WG membership that:
802.1 Plenary - 11/2004 Agenda. Topics n Administrative stuff n IEEE Patent Policy n Exec stuff n Interim meetings n Task group stuff.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /0661r2 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
802.11k Orlando Agendas Richard Paine
IEEE 802 Handoff ECSG Chair’s Introduction
IEEE r: Fast BSS Transition TG
Submission Title: [WG-TG3b Meeting Report Sept04]
CBP SG Van Closing Report
Don Wright Director, Alliances & Standards Lexmark International
Instructions for the WG Chair
Don Wright Director of Standards Lexmark International
平成30年11月 doc.: IEEE /424r1 January 2006
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
APF Study Group Agenda September 13, 2004 September 2004
Don Wright Director of Standards Lexmark International
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
平成31年2月 doc.: IEEE /424r1 January 2007
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
平成31年2月 doc.: IEEE /424r1 July 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Opening.
Don Wright Director, Alliances & Standards Lexmark International
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
Siemens, Roke Manor (Recording Secretary )
ATML #17 IEEE SCC20 DMC & TII Jan 2006 Plenary
doc.: IEEE /479r0 Mika Kasslin TGh chair
TGu Ad Hoc Agenda Date: Authors: February 2007
Don Wright Director of Standards Lexmark International
Submission Title: [WG-TG3b Meeting Report Sept04]
Don Wright Director of Standards Lexmark International
IEEE r: Fast BSS Transition TG Agenda
Don Wright Director of Standards Lexmark International
TGu Agenda Date: Authors: March 2007 March 2007
802.11p WAVE Opening and Agenda November p
802.11k Orlando Agendas Richard Paine
Report of TGv – September 2006
Don Wright Director of Standards Lexmark International
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
Report of TGv – September 2006
TGi Preliminary Agenda
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
IEEE IPR Policy Date: Authors: March 2006 March 2006
平成31年7月 doc.: IEEE /424r1 May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Opening.
TGu Agenda Date: Authors: May 2006 May 2006
IEEE s: ESS Mesh Task Group
Presentation transcript:

Don Wright Director of Standards Lexmark International don@lexmark.com P2600 Hardcopy Device and System Security October 2005 Working Group Meeting Don Wright Director of Standards Lexmark International don@lexmark.com 11/30/2018

Agenda Items Monday/Tuesday, October 24/25 Welcome & Introductions Update and Approve Agenda Review and approve September Minutes IEEE Patent Policy Review 2005 Meeting Schedule 2006 Meeting Schedule Update on TCG Update on INCITS CS1 Working Group Review of Action Items from September Meeting Other Topics from e-mail, other 11/30/2018

Agenda Items Monday/Tuesday, October 24/25 Document Review: Clauses 1-8, High Security PP From Submitted Comments Others Document Review: Enterprise PP Document Review: SoHo PP Document Review: Public PP CC V3 changes from ICCC2005 Other items Next meeting details Summarize and record action items 11/30/2018

Minutes from September Meeting Minutes were published shortly after the meeting. They are available at: http://grouper.ieee.org/groups/2600/minutes/P2600-minutes-Sep2005.pdf Any corrections or changes? 11/30/2018

Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #1 and #2 of this presentation Advise the WG membership that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early disclosure of patents which may be essential for the use of standards under development is encouraged; Disclosures made of such patents may not be exhaustive of all patents that may be essential for the use of standards under development, and that neither the IEEE, the WG, nor the WG Chairman ensure the accuracy or completeness of any disclosure or whether any disclosure is of a patent that, in fact, may be essential for the use of standards under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing advice was provided and the two slides were shown; That an opportunity was provided for WG members to identify or disclose patents that the WG member believes may be essential for the use of that standard; Any responses that were given, specifically the patents and patent applications that were identified (if any) and by whom. 11/30/2018 (Not necessary to be shown) Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005)

IEEE-SA Standards Board Bylaws on Patents in Standards IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. 11/30/2018 Slide #1 Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005)

Inappropriate Topics for IEEE WG Meetings Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt 11/30/2018 Slide #2 Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005)

Officers Chair: Don Wright, Lexmark Vice Chair: Lee Farrell, Canon Secretary/Lead Editor: Brian Smithson, Ricoh 11/30/2018

2005 Meeting Schedule Dec 13-14 -- San Diego Hewlett-Packard Rancho Bernardo, CA (north of San Diego) 11/30/2018

2006 Meeting Schedule Proposal January 16-17 (Las Vegas – tentative) March 2-3 (Ricoh checking on Lanier ATL facility) April 3-4, Mount Laurel, NJ (near Philly) @ Okidata May 23-24 (Océ checking on Paris) June 19-20, Boulder CO @ IBM July 26-27 (Rochester, NY – tentative) September 6-7 (Portland/Vancouver – Sharp – tentative) October 23-24, Lexington KY @ Lexmark December 11-12 (Canon, Orange County – tentative) 11/30/2018

Trusted Computing Group Update 11/30/2018

INCITS CS1 : Cyber-Security Update 11/30/2018

Group General Action Items Update web site with September meetings results/contents - done Slides, Minutes, Action Items, Comment Resolution Update web site with October meeting details - done Update web site with preliminary December meeting details – done Tell Carmen we’re moving to CC V3. – done Edits to Clauses 1-8 before October Meeting – partial Conversion of E & HS PP by October meeting – partial Results from initial discussions with Labs (Cybuck/Sukert/Wright) – partial 11/30/2018

Project Schedule from Sept Meeting The PAR included estimates of the end-points of the schedule: Initial ballot through IEEE (Lab get this as well) Do needed recircs to get close Run through the lab Recirc the lab’s final changes if any Turn around the clause 1-8 changes beforeh Oct Meeting HS & E PP by October meeting Two full days in Chicago to get docs in shape. Get SOHO and Public caught up by December meeting. Form IEEE Ballot Body in 1Q06 11/30/2018

Action Items from Previous Meetings Review entries in P2600-action-items excel spreadsheet Any immediately obvious additions? 11/30/2018

Validation of PPs – from September Do we need a lab? -- Yes, based on Peter’s NIAP discussion. Quoting process…. Which labs? CSC (resources to do both cleanup and validation) (Alan) SAIC (both) (Peter) COACT (maybe) (Don  Thrasher) Maybe others All PPs through one lab – package deal. Who will manage the interaction with the lab? Peter can help get it started Don & Brian S. will be contacts for the lab. How will it be funded? Pass the hat? Any possibility of gov’t funding? -- probably not 11/30/2018

Document Section Status Other Editors Needed/Assigned: Clause 1 & 4 – Don W. Clause 2 & Bibliography & Informative References – Don W. Clause 3 (definitions) -- Alan Sukert, Xerox Clause 5 (environments) – Peter C. Clause 6 (assets) – Brian V. Clause 7 (threats) – Jerry T. Clause 8 (mitigation) – Tom H. Enterprise PP -- Ron Nevo HS PP – Brian Smithson SoHo PP - Carmen Aubry Public PP - Nancy Chen Other Annexes - Smithson 11/30/2018

Issues raised on e-mail 11/30/2018

Document Review Review Comments on Draft per Comments Database Clauses 1 - 8 High Security PP (version 13a) Other Annexes 11/30/2018

Document Review: Enterprise PP Review Draft number 13a Any comments submitted? Meeting comments CCv3 document at December Meeting 11/30/2018

Document Review: SoHo PP Review Draft number 12a No new draft Any comments submitted? Meeting comments CCv3 document at December Meeting 11/30/2018

Public PP What is schedule? CCv3 document at December Meeting Public PP: Nancy Chen We decided at the September meeting to wait until we have CC V3 version of HS/E/SOHO PP before doing this one. CCv3 document at December Meeting 11/30/2018

Reminder: Managing the Process Going Forward Going forward we must manage the discussion and changes to the document. For the following components of the standard, we will have no “random” discussions. All proposed changes MUST be on the e-mail reflector at least one week before the meeting including specific changes requested. Clauses 1 through 8 High Security PP The SoHo and Public PPs will be added to the controlled list as they mature. 11/30/2018

Next Meeting Details December 13-14 Where: San Diego/Rancho Bernardo, CA HP San Diego 16399 West Bernardo Drive San Diego, CA 92027-1899 Nearby Hotels Marriott Residence Inn Rancho Bernardo/Carmel Mountain Ranch Radisson Suite Hotel Rancho Bernardo Rancho Bernardo Inn Hilton Garden Inn San Diego/Rancho Bernardo Doubletree Golf Resort San Diego 11/30/2018

Next Meeting Details 11/30/2018

Next Meeting Details 11/30/2018

Action Items for December Shooting for a merged document at December meeting 11/30/2018

Mailing List and Web Site Listserv run by the IEEE An archive is available on the web site Subscribe via a note to: listserv@listserv.ieee.org containing the line: subscribe stds-2600 Only subscribers may send e-mail to the mailing list. No Change 11/30/2018