RF Power for C75 - Resources

Slides:



Advertisements
Similar presentations
Emergency Transfer Controls
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Selecting & Defining Command and Control Systems for Mine Ventilation Presented By: Sancar James Fredsti.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
LAFA Food Distribution July 26, Introduction:
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Electrical & Control Power Supplies Trevor Hartnett.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
HVPS Upgrade for ALS Storage Ring RF System -Disconnect Switch Status
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
The following pages contain a number of architectural designs that can be applied to a broadband network. The application of the SPSM in a network is limited.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
RF Power Klystrons & 20 Year Look R. Nelson 7/15/15.
S A Griffiths CM42 June 2015 Electrical & Control.
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Obsolescence and Anticipated Upgrades Curt Hovater.
Areal RF Station A. Vardanyan
RF Systems and Controls for the LERF CM Tests
S1G Experiment Schedule Plan
Auxiliary power supply (APS) Hossein Harimi 2014
CLAS12 Forward Tracking: Status and Challenges
CBETA Technical Review
MICE RF System Power Supplies, Control and Monitoring Status report
C75 Review 21Jan2016 Cost Estimate
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Redundancy Switching Components
LV Safe Powering from UPS to Clients
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
352MHz Klystron Control for the 3MeV Linac test stand
Electrical and electronic systems projects
BEPCII RF POWER SOURCE AND INPUT COUPLER
Jefferson Lab Low Level RF Controls
RF Power for C75 - Resources
C75 LLRF Cost and Schedule
ESS Bilbao RF Systems Overview Pedro J. González
LINAC PROTON SOURCE MODULATORS
RF introduction Anders Sunesson RF group leader
QCM and C50-12 Status Update
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

RF Power for C75 - Resources RF Power U[grade for C75 Richard Nelson Friday, November 30, 2018

Major Tasks Major tasks (nearly identical to 0L04 mods) Procurement of materials Remove old parts from cathode power supply Transformer, choke, capacitors, HV deck, contactors… Modify enclosure to accommodate new components Place & installation new parts Transformer, choke, capacitors, HV deck, contactor, SCR controller, crowbar Wiring, cabling, interlocks Change controls & interface from analog and CAMAC to HPA controller & digital FCC Waveguide replacement (HPA – tuners & circulators) C75 Review 15-Feb-2018

Tasks Bulk of the tasks accomplished by RF techs Testing Installation, wiring, etc. Transformer move and welding with assistance Some software support to adapt digital controls Testing DC, controls, interlocks RF (into shorts first) Final waveguide connect to C75 CM followed by full-up testing C75 Review 15-Feb-2018

Major Procurements Klystrons will be purchased regardless and as ongoing spares & replacements ~77k for CPS upgrade components HV step-up transformer, choke, capacitor, contactor, crowbar, SCR controller ~80k for circulators (5kW to 8 kW capability) May be able to reuse existing units with load rebuild ~19k for waveguide tuners & misc. waveguide Exact pricing depends on quantities Ideally multiple year contracts would be placed or larger buys up front Cost advantage for 1 time buys C75 Review 15-Feb-2018

Labor & Procurements Task/Milestone Note SE EE/CS ET ED Labor Total Materials HPA Controller   1 0.4 Network Modifications 0.2 Software Modifications 8 kW Klystrons/test/install proc separate 0.5 2 8 kW Circulators * 80,000 Waveguide (tuners) 17,500 CPS Upgrade (rebuild) 4 77,000 HPA Interlocks, CAMAC conversion 2,500 HPA/CM Waveguide Installation 3 2,000 Electrical Work (cable, conduit, breaker) 0.6 AC Distribution& A/C (facilities) separate Commissioning, HV, shorts RF Power Commissioning 1,000 Total (weeks) 7.2 18.4 5 33.6 182,000 * may be able to use existing circulators C75 Review 15-Feb-2018

Non-optimized Draft Schedule C75 Review 15-Feb-2018

Summary Labor requirements understood Quantities & mix Should be somewhat familiar as it’s close to 0L04 upgrade Some of the same people will do the work Dual work areas (HPA & CPS modifications) should allow parallel work with adequate staff to reduce completion time Could extend to working 2 zones in parallel Actual labor pool available will depend on current staffign, work load, work priorities C75 Review 15-Feb-2018