AIDC safety benefits & limitations

Slides:



Advertisements
Similar presentations
Primary Radar in ATC ITU Radar Seminar Poul Erik Jørgensen DAS ATS HMI Manager 24. September 2005.
Advertisements

INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
SOCM-2 Seminar Data Link Benefits Presented By: Dennis Addison, FAA
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Workshop on preparations for ANConf/12 − ASBU methodology
Pan regional ICD for AIDC structure and status (SP/09)
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 ATM DATA LINK APPLICATIONS M J A Asbury ATSDL_001_4 01 Presentation ATN 2.3.
Development of AIDC ICD in APAC Region
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
Traffic Processing Sequence — Tactical and Strategic Investigation of all the facts pertaining to the Air Traffic Services tactical and strategic traffic.
Applications from packages I to III
(Global) PAN AIDC ICD AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
2 July 2015 © Thales Australia Limited. This document and the information it contains is commercial-in-confidence and shall remain the property of Thales.
APAC SIP on ASBU B0-FICE AIDC Implementation Seminar Basic SYSCO Principles and Standard OLDI Communication EUR Environment ICAO EUR/NAT Office Celso Figueiredo.
DARP.
AIDC safety benefits & limitations AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
LOA template AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
Flight State Transition diagram
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
Chapter 3 Automating Business Processes with Workflow.
Incident Review Meeting Example  The next slides are an example of how to complete the template and identify latent conditions, threats, errors, UAS and.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Interest NACK Junxiao Shi, Introduction Interest NACK, aka "negative acknowledgement", is sent from upstream to downstream to inform that.
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
STORE AND FORWARD & CUT THROUGH FORWARD Switches can use different forwarding techniques— two of these are store-and-forward switching and cut-through.
Switching Topic 6 Rapid spanning tree protocol. Agenda RSTP features – Port states – Port roles – BPDU format – Edge ports and link types – Proposals.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
City College of New York 1 John (Jizhong) Xiao Department of Electrical Engineering City College of New York Mobile Robot Control G3300:
Lecture 11: Flight Management System (FMS)
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
Improving our Safety Culture
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
AIDC Implementation Seminar 28th – 31st October 2014
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
AIDC Implementation Seminar 28th – 31st October 2014
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
FILING OF VFR FLIGHT PLANS
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
AIDC status October 2014 © Thales Australia Limited. This document and the information it contains is commercial-in-confidence and shall remain the.
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
New Automation System Delivers FANS-1/A Benefits
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
FANS (Future Air Navigation System) Flight Crew Procedures
AEROTHAI AIDC Implementation Status
Flight State Transition diagram
FPAW 2016 Summer Meeting 3 August 2016 Louis Bailey.
Data Link Advanced Operations
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2.
ICAO Air Navigation Bureau
Oceanic and International Operations
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1.
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Objectives of the meeting
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

AIDC safety benefits & limitations AIDC Implementation Seminar 28th – 31st October 2014 Adam Watkin Airservices Australia

Introduction Implementation of AIDC Safety benefits Presentation title Introduction Implementation of AIDC Safety benefits Data adaptation issues to consider Limitations

Safety benefits Coordination errors - reduced Coordinated data should be extracted automatically from flight data processing system Coordination should occur automatically Controller workload - reduced Less reliance on intercom/phone lines More time available to complete other tasks Efficiency - increased Controller can manage increased traffic levels Support DARPs etc

Considerations – Adaptation data What AIDC messages to send? ABI, EST/ACP; or ABI, CPL/ACP What about ICD V3 messages such as TRU, FAN, FCN etc Coordinating changes CDN; or Voice Will AIDC hand offs be used?

Considerations – Adaptation data When are AIDC messages sent? Timing parameters When does automation send AIDC messages?

Considerations – Adaptation data Format of Field 14 (Estimate data) supported by neighbouring ATS Units Block levels Weather deviations and offsets Mach Number Technique Needs to be configurable per FIR

Considerations – Adaptation data Content of Field 15 (Route) required by neighbouring ATS Units full flight planned route; or route information to commence at the waypoint preceding the coordination point Should be configurable per FIR

Limitations A benefit of AIDC is it’s automation. However, this can also be a disadvantage! Controller is “out of the loop” What information was coordinated? Unintentional changes to profile (e.g. level) after coordination has occurred Automatic updates to profile (e.g. estimates) without controller awareness (e.g. ADS-C estimate updates)

Limitations Processing AIDC messaging for short term FIR transits Problems occur when ATSU2 attempts to send AIDC messages to ATSU1 for the entry to ATSU1’s FIR at DONLD, while aircraft is still under the control of ATSU 1 ATSU 2 ATSU 1 MINNY DONLD

Limitations Duplicate & unknown waypoints, duplicate ATS routes Cause problems for flight data processing systems All waypoints and routes within the area of responsibility should be known and unambiguous Truncation A means to truncate (delete) unknown route information and allow downstream units to still accurately process AIDC messaging Must be completed correctly Don’t just delete unknown/duplicate waypoints or routes!

More information Adam Watkin Air Traffic Controller Brisbane Centre adam.watkin@airservicesaustralia.com