MAWG’s deliverables status and proposed milestone

Slides:



Advertisements
Similar presentations
UCD-WG Report Set up the Sci-Board and Tech-Board Done, Jun 2005 Reach the status of IVOA Rec for the UCD document Done, Sep 2005 List of UCD-words from.
Advertisements

XBRL Standards Update 16th Eurofiling Workshop Wednesday 12 December Herm Fischer Masatomo Goto.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All TIA Update – Reconfigurable Radio Systems T. Russell Shields Chair, Ygomi LLC Document No: GSC16-GRSC9-21.
Summary Report Project Name: Model-Driven Health Tools (MDHT) Brief Project Description: Support the complete lifecycle of designing CDA implementation.
Proposed TOSCA TC Timeline March 1, TC Deliverables Standards Track Work Products – “…is a Work Product produced and approved by a TC in accordance.
IETF Trade WG Adelaide, South Australia 29 March 2000 Donald E. Eastlake, 3rd
Summary Report Project Name: Model-Driven Health Tools (MDHT) Brief Project Description: Support the complete lifecycle of designing CDA implementation.
Presentation of the W3C Media Annotations Working Group Activities February 2009 Lausanne, Switzerland Víctor Rodríguez, Jaime Delgado, Rubén Tous Distributed.
Revised TOSCA TC Timeline Analysis and Candidate September 20, 2012.
AutoDESA Presentation Project Documentation October 2005.
Summary Report Project Name: Model-Driven Health Tools (MDHT) Brief Project Description: Support the complete lifecycle of designing CDA implementation.
SMIng 55th IETF Chair: David Durham. Agenda Agenda bashing; All; 5 mins. Status update; Chair; 15 mins. Charter & milestone revision discussion; Chair;
Draft for discussion1 OSLC PLM roadmap discussion Aug 30 th 2011 Rainer Ersch Gray Bachelor V0.4 updated at meeting Aug 30th.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
SIP & SIPPING Working Group Last Call Process & Status IETF 51 – London.
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Power of Choice (PoC) Program Overview
Recommendation of Texas Test Plan Team to RMS
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Task Group API 19SS Sand Screens
Implementation Review Team Meeting
Summary Report Project Name: Model-Driven Health Tools (MDHT)
HITSP Project 2007/2008 Work Plan and Schedule
Systems Architecture WG: Charter and Work Plan
IHTSDO SNOMED CT Tooling
Task Group API 19SS Sand Screens
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda June 20, :00 – 9:30 AM PDT.
Network Measurements Working Group
DCAT-AP OWL & SHACL expressions
API SC13TG 10 API 19C Meeting July 16, 2014
SPACE LINK AREA MID-TERM REPORT
The proposed charter is provided on slide 2
IEEE 802 status report for ISO/IEC JTC1/SC6 meeting on 30 Oct 2017
LB8 Summary Report LB8 opened 9Feb01 12am EST, closed11Mar01 12am EST.
13-block rotation schedule
Document CWG-SFP-3/8-E 5 December 2017 Original: English
Potential Milestones A timeline to finish in one year
Yearly Maintenance Process (for existing messages)
Submission Title: [WG-TG3 Closing Report Nov03]
Specification on float equipment
Project Status: [Project Name]
AIXM CCB meeting EUROCONTROL HQ, Brussels
<<Project Name>> – Engagement Status
TGn Editor Report Jan 2009 Date: Authors:
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
IEEE 802 IMT-Advanced Technology Proposal Process
Chair: Roger Marks, Huawei (since March 2018)
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
TGac Status and Timeline
Accredited Standards Committee C63® - EMC
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
Intercalibration Timetable
SWE 2.0 – Current Status of Standards
NDIA PMSC Guides Working Group
IEEE IMT-Advanced Review Process
*** Series PRS Version 1, ***
XRN Feb 19 Minor Release - Status Update
Timeline for the Light Communications TG
4340 – UK Link Future Release 1.1
Web-based Imaging Management System Including CIM Realignment
Issues for preparation and implementation of training sessions
UIG Task Force Progress Report
Document CWG-SFP-2/7-E 4 August 2017 Original: English
EACH HOME COUNTS IMPLEMENTATION MILESTONES
Web-based Imaging Management Service WIMS Working Group
XRN Nov 19 Release - Status Update
Jella Kandziora, JUELICH Oslo, January 29th, 2019
UIG Task Force Progress Report
KPI and KVI Review Approach & Plan
UIG Task Force Progress Report
Presentation transcript:

MAWG’s deliverables status and proposed milestone Chairs 2009. 11. 06.

Original Milestone in Charter Use Cases and Requirements for Ontology and API for Media Object 1.0 [Version 04 June 2009] Ontology for Media Resource 1.0 [Version 18 June 2009] API for Media Resource 1.0 [Version 20 October 2009]

Proposed Milestone Specification LC CR PR Rec Dec 2009 March 2010 May Use Cases and Requirements for Ontology and API for Media Object 1.0 Dec 2009 Ontology for Media Resource 1.0 March 2010 May Sep API for Media Resource 1.0 Call for Implementation (at least 2 organizations) Call for internal reviews Note: WG End Date 30 June 2010

Open Issues Milestone delayed Two test suites for two spec. ? [Resolution] no problem since CR starts before WG due Two test suites for two spec. ? [Resolution] yes two test suites for two spec (note: pre-preparation would be better) Primer needs to be published by MAWG ? [Resolution] no problem, we will How to validate the mapping table ? [Resolution] conformance referencing several docs within W3C