MANAGING HSE IN CONTRACTS 2017

Slides:



Advertisements
Similar presentations
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Other Measurement Validity Types. OverviewOverview l Face validity l Content validity l Criterion-related validity l Predictive validity l Concurrent.
Phase II Training Briefed By [CA insert name] For Quality Assurance Personnel.
Preparing the GSA Schedule Pricing Proposal
Procurement Presentation Alan Brett Contracts Officer HSE.
Best Procurement Practices and Helpful Information August 2011.
Proposal to Implement a HSE Letter of Assurance Process for Contractors from 1 January 2010 “Must Win” Project: Contractor HSE.
Ogden Air Logistics Center Design & Engineering Support Program II (DESP II) & Flexible Acquisition Sustainment Tool (FAST) Contracting Briefing 21 May.
Proposal to Implement a HSE Letter of Assurance Process
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Cut Scores and College Success: Data Matters A Presentation for the Higher Education Subcommittee of the Arkansas Legislative Council Judy Trice, Senior.
1 20/10/2004 Petroleum Development Oman Xxxxxxxxxxx (Audit Title) HSE MS Audit Xxxxxx (Period)
Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour.
Insert Contractor Name HSE Letter of Assurance and HSE Capability Questionnaire Verification Insert month, year Closing Meeting.
Insert Contractor Name HSE Letter of Assurance and HSE Capability Questionnaire Verification Insert month, year Opening Meeting.
LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.
Degree and Graduation Seminar Integration Management
Unit 11 “Resources”. NWPP Multiple-Award Technical Support Contract Training (eff. 02/2005) Unit 11 2 Unit 11 – “Resources” Overview This unit contains.
LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Al Turki ONDCompleted 2Dalma UWDCompleted 3Petrogas GDCompleted 4MHD UIDPlanned.
Enterprise & Employability. To know:  The definition for primary research  The definition for secondary research To understand:  How questionnaires.
IT-301 Project Management I: Unit 4: Cost Management.
MANAGING HSE IN CONTRACTS 2016
MSE4 Technical Safety Engineering Framework. Technical Safety Function – Core Activities CFDH Skill pool management Skill-pool health – Job Descriptions,
MANAGING HSE IN CONTRACTS 2016 GU140 (C9). 01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor.
North Carolina Council on Developmental Disabilities
WELCOME TO PARTNERSHIP IN HSE.
Compliance with Framework of Quality Control - General & Specific Controls CA Vimal Chopra, Ex Chairman of CIRC of ICAI.
Presented by: AfDB Team Facilitator: Sophie DIMBUNGU
Evaluation Grids Evaluation Grids.
Project Integration Management
Contractors HSE Incentive / Deduction Program Version # 1
Injury: Fall from height
PDO and Contractor Partnership
Competence Can Do or Have Done!. Competence Can Do or Have Done!
Contractor Control system
WELCOME TO PARTNERSHIP IN HSE.
Engineering Processes
Contractor Control system
لبی.
General Contract Management Structure
Project Management in Construction And Its challenges in Armenia
Review of Related Literature and Studies
(HSE Subcontractor) Improvement Plan Overview By Curtis Moore
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
بسم الله الرحمن الرحیم.
South East Data Edit Check Model
STFC Safety, Health and Environment (SHE) Codes
Procurement.
دستورالعمل های استاندارد آزمايشگاهی
Contractor Control system
الدروس المستفادة في مجال الصحة والسلامة والبيئة
Health, Safety & Environmental Management System 2018
North Carolina Council on Developmental Disabilities
General Contract Management Structure
LTI: Finger Crush Injury Hands off suspend loads “Use Tagline”
General Contract Management Structure
HSSE Bridging Overview
UWD Assurance Program Objective: Introduce CCC tool.
E&P HSE Audit Process (Simplified)
Интерпретация және зерттеу нәтижесін өңдеу
Health, Safety & Environmental Management System (HSE MS)
North Carolina Council on Developmental Disabilities
Work Breakdown Structure Tasks and Sub-Tasks
Algebra II Chapter 1 Review.
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
GSIP.
Assessor & Moderator Registration Updates
PRINCIPAL DESIGNER WORKING GROUP (PDWG)
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

MANAGING HSE IN CONTRACTS 2017

HSE IN CONTRACTS 01 PR1171 PART I & PR1171 PART II Critical requirements for CH reduced from 25 to 12 tasks Contractors simplified HSE requirements 06 LETTER OF ASSURANCE LoA Questionnaire and Validation Report - Gap Closure 02 T3 HSE Questionnaire simplified to accommodate all (including SME’s) 01- 25 steps reduced to 12 01- Contractors and Sub contractors 02- Already loaded in Rabitah 03 - Score sheet simplified PR1997 going through FPM Quarterly gate check 04 - C9 updated and tailored specifically to C4 (No more cut and paste – scope specific) 05 - Relevant and applicable HSE documentation controlled by MSE 12 (historically if 4 and 5 not followed this could lead to VTC) 06 – Deeper levels of assurance on Leadership sub contractor management and contract management and SP2000 03 PR1997 Contractor HSE Technical Evaluation - Banding - Score Sheet and Banding Report 05 REFERENCE DOCUMENTATION Applicable HSE Documents 04 C9 HSE Specification - Minimum Requirements

Quaesitum?