Learning bulletin KCD Thames Valley

Slides:



Advertisements
Similar presentations
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Advertisements

Working At Height. Avoid Avoid working at height if possible. Consider whether the work can be done: At ground level Elsewhere, e.g. at the manufacturers.
Artemis Lite Fault Finding FAQ’s
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Supervisor Briefing. There was a LV Cable Strike o/s of 5 Eastcote Rd, Pinner on Friday 10/10/14 at approx. 14:56. The original Excavation was excavated.
Health, Safety and Environmental Update November 2015 Purpose: The intention of this briefing is to pull together and share both Optimise and other contractor.
NMR loading procedure. load button needs to be held to continually supply air to the sample chamber If the air is not on the sample will drop.
July 2008 Construction is underway on TDS’ fiber-optic network in Monticello, Minn.
 cRIO with all modules & connectors and cables for each module.  Digital sidecar with all connectors and cables.  Panel signal light indicator & connector.
The reading is 7.38 mm. The reading is 7.72 mm.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
Electricity.  Aims – To understand the process of providing Electricity to buildings.  Objectives  To understand how Electricity is Generated.  To.
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
Chapter 2 Safety. Chapter 2 Safety Objectives Understand the effects of electrical shock. Describe conditions likely to affect the severity of an electrical.
Check your ladder before you use it
Cameras and Eyes Lv4: Recap what happens to light when it hits an object. Lv5: Explain how a pin hole camera works Lv6: Analyse how a camera works. Entrance.
HPS Motherboard Electronic Design
SERVICES, LLC 1 1.
P2 REVISION – CHAPTER 7– Electricity
Leica Detection UK Detecting and Avoiding Buring Services for
Interface Connections
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Essential Tools Required for Any Car Emergency.
Copyright 2008 Kenneth M. Chipps Ph.D.
What are Some Characteristic of Fluid Pressure ? Day 1
Team Debrief Guide Team Timeline Discussion Team Feedback
Safety.
INVESTIGATIONS AND COMPLIANCE
14-3 Mechanical Advantage and Efficiency Answer on a separate sheet of paper Objectives: 1. How does the actual mechanical advantage of a machine compare.
PDO Incident First Alert – Schlumberger
ACPA – Safety Chairman’s Award
Contact Erica Estrada-Liou (Academy of Innovation and Entrepreneurship) at Team Debrief Photo credit: Flickr user Zanthia.
Team Debrief Guide Team Timeline Discussion
PDO Incident First Alert - Cactus Premier Drilling services
Ensure to use the right tools and equipment for the activity
When climbing mountains
A Famous Football Player
Electricity 1/14/2019.
PDO Incident First Alert - Galfar
PDO Incident First Alert – Truck Oman
PDO Incident First Alert – NDSC
PDO Incident First Alert - PDO Insourcing
The Starting & Charging System
Archaeological Dig An Archaeological dig is something where a group of people do research to find out things about the people or creatures who lived before.
PDO Second Alert What happened? Your learning from this incident..
Learning bulletin Thames Water Thames Valley
PDO Incident First Alert - Carillion Alawi LLC
PDO Incident First Alert - PDO Insourcing
Learning bulletin KCD Thames Valley
PDO Incident First Alert - Medco
Archaeology trip This is the archaeological people having a break while we were looking in the trenches they had dug up.
PDO Incident First Alert - STST
2 PLUG INTO SAFETY APRIL REVIEW TOP ISSUES
PDO Incident First Alert - Abraj Energy Services
PDO Second Alert Date: Incident title: HiPo What happened?
PDO Incident First Alert - Shaleem Petroleum
Learning bulletin Developer Services Thames Valley
Length Units of Measure
How to conduct an effective student – led discussion in class
Appalachian Underground Corrosion Short Course
Scientific Notation.
Multiplying binomials
PDO Incident First Alert - Al Sahari Oil Services SAOC
support a power pole that is 15 meters
PDO Incident First Alert - MEDCO
PDO Incident First Alert - Apergy
Multiplying binomials
Presentation transcript:

Learning bulletin KCD Thames Valley What Happened On the 10th October, a dig team traced and marked up their area of work. After the team traced and marked up the service, they proceeded with the initial dig around the meter box The team then struck and damaged a street light cable with a jack hammer at a depth of 100mm. Why did it really happen? Team dug on top of their mark-up and stated they thought the jack hammer wouldn’t hit the service. Safe digging practices were not adhered to. Team used mechanical tool within 500mm of the service to break ground. What can I do differently? Always ensure that you do not dig directly on top of your mark up and follow safe digging practices. Do not use mechanical tools within 500mm of marked up services. Always ensure you check your surrounding work environment to identify any unknown services such as previous scarring, street lights or any other power supplies. LV damaged service