homework assignment due Feb 23

Slides:



Advertisements
Similar presentations
Roles and Monitoring Best Buddies Canada 2005 National Leadership Conference Be the change you want to see in the world. Gandhi.
Advertisements

Teaming Up. Teams A group of people working together to accomplish a task.
HCI SEMESTER PROJECT PROJECTS  Project #2 (due 2/20)  Find an interface that can be improved  Interview potential clients  Identify an HCI concept.
Learning and Teaching Conference 2012 Skill integration for students through in-class feedback and continuous assessment. Konstantinos Dimopoulos City.
Test Long and Prosper presented by Janet Gray July 26, 2005.
6.1 Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Building Information Systems Chapter 13 VIDEO CASES Video Case 1: IBM: Business.
CS 316: Introduction to Computer Organization and Systems Programming.
Quality Assurance CS 615. Mission Statement The Quality Assurance team will provide assurance to stakeholders in CS-615/616 projects that their projects.
1 Software Engineering--Introduction. 2 1.Syllabus, grading, schedule--class + lab--will all be on 2.Contact.
CS 235: User Interface Design January 22 Class Meeting
Software Engineering Tutorial. Tutorial objectives  Direct application for the SW engineering activities.  Discuss real software development case studies.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
 Read MTT Test Prep Manual pages  Have them available as you go through this presentation.  Have some paper and pen or a mind mapping tool available.
Tablet PC Capstone CSE 481b Richard Anderson Craig Prince.
CS 235: User Interface Design August 25 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Course Introduction Software Engineering
System Development Life Cycle. The Cycle When creating software, hardware, or any kind of product you will go through several stages, we define these.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Documentation and Comments. What’s a comment? A comment is a simple form of documentation. Documentation is text that you the programmer write to explain.
Chapter 19 The Basics of Computers. Today’s Schedule Assignment of Homework Assignment of Homework Chapter 19 (Continued) Chapter 19 (Continued) Quiz.
TEAMWORK & BACKLOGS GAME CAPSTONE – WINTER 2014 BRIAN SCHRANK – DEPAUL UNIVERSITY.
Introduction to CS Senior Design Project I / II Prof. Dr. H. Altay Güvenir.
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
COMP3615,5615 Capstone Projects Week Overview of the semester Website tour – XP and roles – Assessment – note especially the individual mark operating.
Latifa AlAbdlkarim King Saud University October,2009.
User Management. Basics SDMS shall maintain a database of all users. SDMS shall maintain a database of all users. SDMS shall not limit the number of registered.
SE-280 Dr. Mark L. Hornick 1 SE-280 Software Engineering Process Dr. Mark L. Hornick web: myweb.msoe.edu/hornick SE280 info syllabus,
1 CS 501 Spring 2002 CS 501: Software Engineering Lecture 24 Delivering the System.
1 Who are the potential viewers? Our principal source of documentation this semester will be the project Web sites, so we must ensure that they adequately.
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
Project – A Quick Tutorial Krishna Sainath Meda. PROJECT  A task assigned to a set of people or teams to be completed within a time frame  Any project.
(SRS) SOFTWARE REQUIREMENT SPECIFICATION(SRS) 1. Topics to be discussed.. What is an SRS? Purpose of an SRS Who reads the SRS? Who writes the SRS? Characteristics.
Software Development A Proposed Process and Methodology.
Class Scheduler Team Members Bernard Battle Jerad Blake James Knoch Chris Louallen Lenora Pride.
April 11, 2001 The Red Frogs The Online Grade Book Project 1 Online Grade Book Project The Red Frogs Online Grade Book Project Team Members: –Gita Tripathi.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
TEAMING UP. TEAM A group of people working together to accomplish a task.
Class summary and homework for February 2 since we missed 2 consecutive classes, this class consisted of a review and going over the 2 pending homework.
第 11 組 MIS 報告. Phases of any information system ~ recognition of a business problem or opportunity ~ recognition of a business problem or opportunity.
Verlyn Mol Baldwin-Wallace College August, 2009.
MGS 351 Introduction to Management Information Systems
The Registration Alert System LCA Overview. Overview The Registration Alert System (RAS) is web-based software package that allows University of Washington.
IT 21103/ System Analysis & Design. Chapter 14 Testing, Documentation, Training Chapter 15 Conversion, Maintenance, Review.
Software Maintenance1 Software Maintenance.
Informed Traveler Program and Applications Agile / Scrum Overview Jerry Inberg.
CS 575 Spring 2012 Lecture Bapa Rao.
Eugene Marathon 5 Guys. What was planned to this point Main milestones ◦ Write first pass of documentation ◦ Create WebPages ◦ Get server running and.
UTeach STEP 1- Class #7  Welcome!  Please sign in  Pick up your name card and get a computer  If you have a BIN with stuff please empty, return stuff.
DEVRY CIS 321 Week 7 Milestone 5 and Milestone 6 Check this A+ tutorial guideline at
WEB 434 Week 3 Individual Web-Based Supply Chain Paper Individual Web-Based Supply Chain Paper Write a 2-3 page paper, explaining web-based supply chains.
BSA 385 Week 4 Individual Assignment Frequent Shopper Program Part 3 For the items specified in the technical architecture document developed for the Frequent.
Supporting quality devices
System Design, Implementation and Review
Introduction to CS Senior Design Project I / II
AIT Design Project- App Creation
Overview of System Engineering
MTE 520 Enthusiastic Studysnaptutorial.com
Introduction to CS Senior Design Project I / II
Introduction to CS Senior Design Project I / II
Cpt S 471/571: Computational Genomics
CS 8532: Advanced Software Engineering
Introduction to Comparative Effectiveness Course (HAP 823)
Your agenda should answer WHEN, WHO, WHY, WHAT, PREPARE, HOW.
Introduction to CS Senior Design Project I / II
Software Testing Lifecycle Practice
CS177 homework Feb. 23/24 Reading NCBI site tutorial on SNPs
Lesson Warm Up Team Sort:
Homework Check Everyone should have their homework out. Resource Managers grab answer keys for each member of your team. Team members should share and.
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
Presentation transcript:

homework assignment due Feb 23 this will be graded this is required to be done by each project team working together as a team this will be continued and enhanced each week for the rest of the semester only one task - documentation to help organize and focus on your team project list all team members and their emails list at least three potential projects biological question addressed computational approach

homework page 2 continued be prepared to discuss your proposals in class make sure the computational part includes at least two (preferably all three) of the components I discussed automated batch processing accessing molecular biology databases parsing info retrieved from databases

homework page 3 continued proposed roles for each team member must specify role and specific team member name everyone should be involved to some extent on all parts, but one person has main responsibility must include one or more software developers user manual design biological question to address set up milestones and check if they are met team manager to oversee whole thing test correctness of code, usability of interface, readibility of user manual