BSOE SPACE/FACILITIES COMMITTEE Agenda – July 23, 2009

Slides:



Advertisements
Similar presentations
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
Advertisements

Section 106 Consultation Meeting Veterans Integrated Service Network 10 (VISN 10) Louis Stokes Cleveland VA Medical Center Jack Hetrick, FACHE Network.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Summary of $475 million Bond Issue and Capital Financing Options Practiced By the State System of Higher Education in Oklahoma Practiced By the State System.
1 Overview of Session Why conduct a Space Inventory and Functional Usage Study? –F & A Cost Reimbursement –Federal Compliance.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
November 5, 2012 Academic Senate Focus Group Bruce Wintroub and Lori Yamauchi UCSF Space Committee and CSB/UCH Seismic Space Planning.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholde r to insert your own image. Farmington.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Non-Class Events in Classroom Project 1 Classroom Scheduling & Utilization Project: Capturing Non-Class Events in Held in Classrooms March 25, 2009.
Phase 1 Existing SCIE I Existing SCIE II Upton Hall.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
FY 08 Superintendent’sBudgetProposal January 25, 2007.
Biotechnology Center Amendments Prepared For: City Council Approval Date: December 12, 2006 Prepared By: Myron Borys Vice President, Economic Development.
Building for Their Future Dublin Unified School District.
WCA Facilities Planning February WCA Request 2 Educational Program: The Charter School’s educational program has unique facilities needs. Key.
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
1 FY County Manager’s Recommended Capital Budget July 18, 2006.
ACPS & City of Alexandria 1.  Long Range Educational Facilities Plan to improve facilities planning, accommodate the growing student population, and.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
NORTH CAROLINA STATE UNIVERSITY Budget and Budget Process.
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
DEPARTMENT OF CULTURE, SPORT AND RECREATION MPUMALANGA PROVINCE COMMUNITY LIBRARY CONDITIONAL GRANT 2011/12 FINANCIAL YEAR 1.
Science Complex Renovation Science, SR I, and Fleming Board of Regents Administration & Strategic Planning Committee April 28, 2008.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
University Capital Budgeting Business Practices Seminar Planning, Requesting, Funding January 10, 2007.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
AUBURN UNIVERSITY Capital Projects Program Facilities Management
Space Use Overview November 2010 Council for the Built Environment Facilities Utilization Review Sub Council.
A Blue Print for Collecting School Facilities Data.
New Market Skills Center Draft 10 Year Major Projects Capital Plan Administrative Council December 2, /02/20111.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
A Great Place to Study, Live, Teach, Work. Current UAA Churn Schedule –2007/08 GOAL 1: Provide Space in 3 rd Floor SSB for Joint PhD program—Capital Funded.
Budget & Legislative Update Staff Senate August 5, 2015 Charles D. Leffler Vice Chancellor for Finance and Administration.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
West Cambridge Data Centre Ian Tasker Information Services.
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
Cambrian School District March 19, 2015
Occupational Therapy Classroom Proposal
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Cornwall Central School District
Forsyth County 2016 Bond Referendum
Chabot College Facilities Priorities
University Capital Budgeting Business Practices Seminar Planning, Requesting, Funding January 10, 2007.
October 21, 2016 Bruce Locke, AVP Academic Affairs
ESPLOST I REVIEW.
Campus Construction Projects
Facilities Update November 17, 2017
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Healthwatch Portsmouth Board meeting 17 October 2018
Kincaid Hall Renovation
CORE PROJECTs July 27, 2018.
Applied technology and business
Facilities Modernization Program
Updates COM Faculty Council
Campus Capital Needs Assessment
Transportation Services
Ten year Capital Improvement Program and Preliminary Bond Information
Strategic Budget & Planning Council Capital Improvements Plan
CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE
Continuing challenges regarding previous “findings” :
New Market Skills Center Draft 10 Year Major Projects Capital Plan
Conventional Facilities
FY19-28 Capital Improvement Program Request
Presentation transcript:

BSOE SPACE/FACILITIES COMMITTEE Agenda – July 23, 2009 Purpose of Space/Facilities Committee Overview of Buildings Used by BSOE Overview of Space Issues Facing BSOE Process & Timeline for Space Committee

Purpose of Space/Facilities Committee Holistic Assessment of Space & Facilities Blend School-wide, Program, & Services Needs BSOE Philosophy & Policies Governing Space Oversight & Monitoring Standards Integration with Budget Planning Priorities That Reflect Resource Availability Link to Academic & Budget Planning

Buildings Utilized by BSOE Currently Occupied Baskin Engineering (BE) Mathematics Relocation (Summer 2010) Basement Relocation of Printing Services & Mail Room (TBD) Security Separation of 2nd & 3rd Floors (TBD) Engineering 2 (E2) Economics Relocation (2015 or later?) Physical Sciences Building (PSB) Sinsheimer Laboratory Building (SH) Silicon Valley Center (SVC) Buildings 19 & 239 NASA Research Park (NRP)

Buildings Utilized by BSOE Planned for Occupation Delaware Building C (DEL) ADA Modifications Complete (2010) Engineering Research Labs – Phase 1 (2010) Engineering Research Labs – Future Phases (TBD) Bio-Medical Sciences & Engineering Building (BMSEB) Release of Funding for Construction Uncertain Beneficial Occupancy (TBD)

Campus Space Planning Expectations Reduced Rate of State Capital Funding & Approvals Immediate Impact = Delay of BMSEB Slow Progress on Campus Infrastructure Upgrades Ten-Year Capital Plan (thru 2020) BSOE Growth From Math Relocation, BMSEB, Math Relocation BSOE Must Self-Fund Improvements & Renovations Potential Growth at Delaware & SVC (NRP Development)

Issues for Consideration School-wide Issues 1. Contiguous Space for Departments & Services 2. Create/Expand Instructional Laboratories Bioengin, Biotech, Game Design, Robotics, Sr. Projects 3. Create/Expand Research Laboratories & Support Space Institutes/Centers, Individual Labs, Non-Senate Academic Offices 3. Guidelines for Space Allocation & Utilization Philosophy, Standards, Costs 4. Safety & Security Chemicals, Seismic Access, Theft, Vandalism, Terrorism 5. Storage Facilities & Capacity 6. Utility Infrastructure Continuity Electrical Power, Cooling, Back-Up Network Capacity & Redundancy

Issues for Consideration Baskin Engineering 1. Utilization of Mathematics Release Space Negotiations with PBSci BME Relocation from PSB 2. Redistribution of Departments & Services AMS Relocation from BE 1st Floor TIM Relocation from E2 5th Floor (CITRIS) UGA Relocation from BE 2nd Floor ITS Relocation from BE 3rd Floor & E2 5th Floor (CITRIS) BSOE Student Organizations Relocation from BE 2nd & 3rd Floors 3. Basement Expansion Machine & Electronics Shop Operations Facilities & Receiving Operations

Issues for Consideration Engineering 2 1. Use of CITRIS & QB3 Space by Departments 2. Data Center Expansion 3. Graduate Student Clusters 4. No Wet/Chemical Lab Capacity 5. Eventual Relocation of Economics (2015 or later?)

Issues for Consideration Silicon Valley Center 1. NASA Dependent Impacts Access & Security Lease Arrangements Office Size & Sharing 2. Sub-Committee to Assess Allocations/Standards 3. Building 19—Offices and Classrooms 4. Building 239—Research Labs 5. Long-term use of NRP Facilities

Issues for Consideration Other Issues 1. Delaware Occupation Planning Potential E-3 for Next 10 Years Identifying Potential Occupants Securing Resources for Renovations 2. Bio-Medical Sciences & Engineering Building Occupation Planning PBSci Exchange of Sinsheimer Space Allocation of Open Labs Equipping Shared Use Facilities