System Integration Plan

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Transportation Strategy Board July 28, 2010 Responsible Growth.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
COLORADO PERSPECTIVE Cathy Shull Board of Directors Ports-to-Plains Alliance.
International Partnership Meeting Thursday, January 17, 2013 Washington D.C. 1.
Patriot’s Crossing July 21, Bottom Line Up Front The Hampton Roads Chamber of Commerce is taking the lead on advancing and advocating for the Patriot’s.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
Trains are better for our environment than other modes of travel.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
Manatee County Utilities Department Manatee County Administrator’s Office Board of County Commission Worksession Expanded Alternative to Meet BCC Directives.
Border Trade Advisory Committee Report Cary Karnstadt, TxDOT 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
1 Patriot’s Crossing  PROVIDES MOST REGIONAL CONGESTION RELIEF  UNIQUELY POSITIONED TO SUPPORT REGIONAL ECONOMIC GROWTH  IMPROVING TOTAL REGIONAL CONNECTIVITY.
Sang Yoo Rahall Transportation Institute. Appalachian Regional Commission (ARC)  A Regional economic development agency that represents a partnership.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Local Partnerships for Transportation October 14, 2013 Jennifer B. DeBruhl Director, Local Assistance Division.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Supporting a Regional Approach Optimizing the Durham-Chapel Hill high-capacity light rail transit corridor Joe Milazzo II, PE Executive Director, RTA September.
Transportation Investment Act: HENRY COUNTY PROJECTS Atlanta Regional Commission Board Meeting March 28, 2012 Chairman Elizabeth “B.J.” Mathis Henry County.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Coalfield Route - Double Stack Initiative I. Introduction Concept The Coalfield Route Double Stack initiative is designed to facilitate the transfer of.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Integrating Corridor Management Through the Gary-Chicago-Milwaukee Corridor Action Teams.
2014 Mobility Fee Update Study Stakeholder Kick-off Meeting March 20, 2014.
Tips for identifying the Main Idea & Supporting Details in a passage Main Idea Main idea is a general statement about the passage. When identifying the.
John W. Lawson Chief Financial Officer
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Welcome to RCTC February 3, 2017
Integrating Transit and Highway Solutions In High Volume Corridors
Workshop for Interpretive Centers Mississippi River Parkway Commission
Four Winds Condominium Association August 2, 2017
Regional Roads Committee
DATA Transportation 101 Project Status March 20, 2002
21st Century Transportation Committee Finance Subcommittee
Major Projects in Development
Progress Report Implementing the Interregional Transportation Strategic Plan May 22, 2003 in Sacramento Brian Smith, Deputy Director, Planning and.
SHRP 2 Organizing for Reliability: Regional Perspective
Complete Streets: Making Connections
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
North & South Take Different Paths
Responsibilities and FUNDING
Victor Valley Subarea Expenditure Plan
Chapter 5. The Transportation-Planning Process
Transportation Task Force Mission and Vision
LRTP Modeling Status Update
(State) Mississippi River Parkway Commission
Martin Tugwell Programme Director 11 September 2018
(State) Mississippi River Parkway Commission
Southern Bridge Project Brown County Executive
LRTP Modeling Status Update
I-81 Corridor Improvement Plan
Identification of Access Management Problem Corridors With
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
(State) Mississippi River Parkway Commission
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Major Initiatives in Hampton Roads
Lourens de Beer; Supervisor: Prof. C Venter
Presentation transcript:

System Integration Plan Route 58 Corridor Concept Need The Virginia General Assembly established the Route 58 Corridor Development Program in 1989 to enhance economic development potential across this largely rural portion of the state. Travel is being improved on the mostly two-lane, winding and hilly road, and most work is now completed through Henry County.  The I58 will be improved and widened along the whole southern boarder of Virginia. from the Atlanctic Ocean to Tennessee . System Integration Plan Alternatives Analysis In the mid 1990s the Governor appointed a special commission to identify exactly what the Rt 58 Corridor should encompass.  A team of transportation officials identified the Rt 58 corridor to include portions of Rt 58, Rt 16, I-81, Rt 58A, Rt 23 and a few other projects.  Additionally, in 1999 there was another Rt 58 Bond sale and the General Assembly specified the Rt 58 projects that would be funded with these proceeds. A general east-to-west construction strategy was adopted.  However, this was not strictly followed and thus over time a general priority for projects was a "first in first out" so that as the PE was completed on a project it would go to construction utilizing the available corridor funds.