Cartoon of the optical layout around IMC, IFI and IMM

Slides:



Advertisements
Similar presentations
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
Advertisements

HAM6: Summary of Beam Parameters L. Barsotti Jun 12, 2013.
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Ando Group Department of Physics, University of Tokyo August 10, 2015.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
Cabling Policy for KAGRA ISC Yuta Michimura Ando Group Department of Physics, University of Tokyo March 14, 2016.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
40m Optical Systems & Sensing DRD, G R 1 40m Optical Systems and Sensing Design Requirements Document & Conceptual Design Michael Smith 10/18/01.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
Main Interferometer Subsystem
bKAGRA PSL Design Study
Main Interferometer Subsystem
Daniel Sigg, Commissioning Meeting, 11/11/16
Main Interferometer Subsystem
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Yuta Michimura Department of Physics, University of Tokyo
Electronics and Cables around IMC Common Mode Servo Board
KAGRA Control Room Appearance (tentative)
Vibration Isolation Systems
The Advanced LIGO Angular Control System (ASC) (Hanford edition)
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
bKAGRA PSL EOM Layout ~180W ? to IMC Laser EOM (fPMC, PM) PMC EOM
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
40m TAC Update October 2006 The 40m Team 11 April 2019 G I.
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Intensity Stabilization Servo Plan
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1
Intensity Stabilization Servo Plan
Arm Length Stabilization Conceptual Configuration
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
KAGRA ISC Electrical Components Layout
Presentation transcript:

Cartoon of the optical layout around IMC, IFI and IMM bKAGRA Early Phase JGW-T1706953 Yuta Michimura Not to scale at all. Pick-off mirror layout not real. ― main beam ― REFL beam (reflected beam from the main interferometer) IMMT1T beam is IMMT1 transmitted beam from IFI to IMMT1 IMMT2T beam is IMMT2 transmitted beam from IMMT1 to IMMT2 MCE MCe TRANS MCE thick On 1mx1m table IMMT2T for RFAM monitor (1 RF PD) and beam jitter monitoring (2 DC QPDs) IMMT2T IMMT2T MCF IFI IMM thick IMMT2 to PRM POM STM2 thick IFI IMMT1 STM1 from PSL thick IMMT1T thick IMC REFL REFL IMC REFL REFL On oplev pylon IMMT1T for ISS (2 DC PDs) and beam jitter monitoring (1 DC QPD)

Cartoon of the optical layout around IMC, IFI and IMM bKAGRA Final Phase ? JGW-T1706953 Yuta Michimura Not to scale at all. Pick-off mirror layout not real. ― main beam ― REFL beam (reflected beam from the main interferometer) IMMT1T beam is IMMT1 transmitted beam from IFI to IMMT1 IMMT2T beam is IMMT2 transmitted beam from IMMT1 to IMMT2 MCE MCe TRANS MCE in-vac 2 DC QPDs thick IMMT2T IMMT2T in-vac 2 DC QPDs (& 1 RF PD) MCF IFI IMM thick IMMT2 to PRM in-vac ISS DC PDs POM STM2 thick IFI IMMT1 STM1 from PSL thick IMMT1T thick IMC REFL REFL IMC REFL REFL