Environmentally Sustainable Design, Construction, Maintenance, and Operation. Oakland Yacht Club Harbor Reconfiguration.

Slides:



Advertisements
Similar presentations
Interlocal Agreements Private Participation in Federal Programs.
Advertisements

Transportation Conformity Basics Eddie Dancausse FHWA NC Division x112
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Checking & Corrective Action
SCOH Technical Meeting October 18,  Why the new approach?  Risk-based Project Involvement  Required Project Actions  Compliance Assessment Program.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Alternative Project Delivery
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Federal Transit Administration New Starts Project Development Process
WESTCAS 2011 Winter Conference Fort Worth, Texas February 24, 2011.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Overview of Environmental Permitting for Transportation Projects Preliminary Report Steve Lerch, JLARC Analyst Gary Walvatne, TechLaw Inc. December 17,
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
Statewide Operational Needs and Technical Resources Assessment Presented to the Public Safety and Education Communications Governance Council by the Idaho.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Best Value for Clients Presented to the Canadian Public Procurement Forum by Glenn Martin, Executive Director Consulting Engineers of BC November 4, 2009.
City of Riverbank Planning Commission Meeting March 17, :00 p.m.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
THE WAY TO YOUR OWN INDEPENDENT OPEN-FIBRE NETWORK.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Status Report on the AMPO Pooled Research Initiative on Travel Modeling Presentation to AMPO Travel Modeling Work Group November 4, 2010 MWCOG / NCRTPB.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
Project Charters Module 3
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Aims To give an overview of the challenges facing LCC To outline the proposal to raise eligibility threshold To introduce the public consultation exercise.
Agenda CB&I – sustainability solutions
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Transportation Conformity Overview H-GAC Conformity Workshop May 30, 2007.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Defining Your Fenceline: How Big is My EMS? EPA Regions 9 & 10 and The Federal Network for Sustainability.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
Study Advisory Meeting June 11, Study Advisory Meeting June 11, 2008 Project Development Process Planning Study (Recommendations) Environmental.
QBS Colorado FALL FORUM 2011 Daniel W. Akin, P.E. – P.L.S. Chairman QBS Colorado October 4, 2011.
TimeLine Phase 1: Planning Time: 1 year Phase 2: Construction Time: 6 months Phase 3: Installation Time: 1 month Phase 4: Student Involvement.
Writing Executive Summary Sandra Sembel and Itje Chodidjah.
Conception Scoping the project Investigating the work Determining the product Defining requirements How do we know when to move from one stage to the.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Highlights of the “Procedural Guidance” Results of transportation planning process “inform” the NEPA process. Format of planning products for inclusion.
Design-Build in Minnesota Minnesota Department of Transportation.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Managing Technical & Project Risks on Small Renewable Energy Projects (>$20 million) Uwe Roeper, M.Sc. P.Eng. President, ORTECH Consulting Green Energy.
REPC Draft Consultant Contract September 25, 2009.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
Structure and Responsibility
WORK BREAKDOWN STRUCTURE
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Make sure your Airport Master Plan and
WRRDA Section 2102, HMT Target Budget Resources, FY15: $1.2 B (est)
2040 Long Range Transportation Plan Update
PROJECT DELIVERY METHODS
Automated Materials Joining Technologies
Relationship between World Bank and Romanian EA requirements
2007 Lessons Learned & Solutions

Make sure your Airport Master Plan and
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Presentation transcript:

Environmentally Sustainable Design, Construction, Maintenance, and Operation. Oakland Yacht Club Harbor Reconfiguration

Oakland Yacht Club Harbor Reconfiguration Outline Purpose Planning Permitting Design Build Construction Operations / Maintenance Environmentally Sustainable Design, Construction, Maintenance, and Operation Oakland Yacht Club Harbor Reconfiguration

Purpose:: Convert a large number of smaller, empty berths… to a fewer number of larger (and full) berths

Planning: Budget Schedule Scope of Work

Permitting: Federal; State; Regional; and Local Lead Times Environmental Consultations

Design Build: Defined Scope of Work Control Schedule

Construction

Dismantle; Offsite Construction; Transportation ; and Assembly

Construction Management

Operations & Maintenance

Lessons Learned: Specific Project Purpose Alternatives Analysis during Planning Specific Scope of Work Detailed Design Criteria Long Lead Time for Regulatory Permits and Natural Resource Consultations

Lessons Learned (cont’d): Sustainable Design/Build Resulted in: -Lower Construction Costs; -Lower Operation / Maintenance Costs -Timely Permitting Allow Sufficient Lead Time for Permitting AGC Document #415, Standard Form of Design –Build Agreement

Questions?