Grand Hyatt Manchester, San Diego, California, USA November 2001 doc.: IEEE 802.15-01/468r0 July 2012 79th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks July 15-21, 2012 Grand Hyatt Manchester, San Diego, California, USA Robert F. Heile, ZigBee Alliance Robert F. Heile
802.15 Organization Chart July 2012 To add your name 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Task Groups Secretary Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb New Projects (WNG), Interpretations, Rules TG4j MBAN 15.4 PHY Ray Krasinski, Philips Chair TG8 Peer Aware Communcations Miung Lee, CUNY TG4k Low Energy Critical Infrastructure TG9 Key Management Protocol Robert Moskowitz, Verizon Study Groups/Interest Groups TG4m 15.4 TV White Space PHY Sangsung Choi, ETRI TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio TG4p 15.4 Positive Train Control (PTC) Chair: Jon Adams, Lilee Systems Study Groups: 15.4 Ultra Low Power (ULP) Chair: Shahriar Emami, Samsung Interest Groups Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Visible Light Comm follow-on (LED) Chair: Yeong Min Jang Kookmin University Layer 2 Routing (L2R) Chair: Clint Powell To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 802.15 Organization Chart Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 15-21, 2012 TASK GROUP-4j MBAN PHY Amendment Comment Resolution Update Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring Final first draft for Letter Ballot TASK GROUP-4m : TVWS PHY for 15.4 (4TV) Review responses to CFP Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 15-21, 2012 November 2001 doc.: IEEE 802.15-01/468r0 July 2012 San Diego Session Objectives July 15-21, 2012 TASK GROUP4n –China MBAN Review response to the CFA Update Project Plan/Timeline TASK GROUP-4p Positive Train Control Review preliminary technical proposals TASK GROUP-8 Smart Utility Networks Work on Application Matrix and Technical Guidance Document Robert F. Heile, ZigBee Alliance Robert F. Heile
San Diego Session Objectives July 15-21, 2012 TASK GROUP 9 –Key Management Protocol: Work on draft Update Project Plan/Timeline Study Group: 15.4 Ultra Low Power Amendment Work draft PAR on 5C- target for Nov Spectrum Resource Use (SRU) Interest Group: Hear Contributions Discuss future of the Committee Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 15-21, 2012 THz Interest Group: Hear Contributions Discuss future of the Committee Visible Light Comm follow-on(LED) Interest Group: Layer 2 Routing (L2R) Interest Group: Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 15-21, 2012 NEW PROJECTS SUBCOMMITTEE Report on WNG progress Hear new presentations Robert F. Heile, ZigBee Alliance
July 2012 Robert F. Heile, ZigBee Alliance
Upcoming Sessions July 2012 September 16-21, 2012, Hyatt Grand Champion, Palm Springs, CA, USA, 802 Wireless Interim Session November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. January 13-18, 2013, Hyatt Regency Vancouver, BC, CA, 802 Wireless Interim Session* March 17-21, 2013, Caribe Royale, Orlando, FL, USA, 802 Plenary May 12-17, 2013, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session* July 14-19, 2013, Geneva, CHE, 802 Plenary Session. Robert F. Heile, ZigBee Alliance