PORT OF GALVESTON PORT DIRECTOR’S REPORT

Slides:



Advertisements
Similar presentations
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Advertisements

Michael R. Christensen, P.E. Deputy Executive Director – Development Port of Los Angeles Port of Los Angeles Emergency Preparedness and Tsunami Readiness.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
Access to Intermodal Supply Chain Networks
Presentation to Maxwell Place Homeowners Association 1.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Restoring Our Heritage. Recognizing Our Future. Lockport’s Flight of Five: Erie Canal Locks #67-71.
Mesa & Cincinnati Presentation to City Council June 19, 2007.
Port of New Orleans Pat Gallwey Chief Operating Officer Port of New Orleans Counselors of Real Estate Oct. 13, 2009.
Workshop: Economics of Domestic Short Sea Shipping The Barge Feeder Service for the Port of Bridgeport Presented by Seaworthy Systems, Inc. Martin Toyen,
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Texas Tech University Bikeway Plan August 12, 2005.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
West Division Patrol Station Proposed Site Plan & Building Elevations September 4, 2008 Police Services Board.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
FY ‘11 Port Everglades Proposed Budget 1. Vision Statement Economic Opportunities are Endless Board of County Commission Goal Statement Number 3: Sustain.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
ALEXANDRIA PORT AUTHORITY. Location Of Alexandria Port Main International Trade Route Alexandria Port.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Community Development Department Construction Phase BULLDOG DRIVE.
2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
PRIIA 209 Equipment Capital Working Group Ron Pate, Director Cascades Rail Corridor and Washington State Department of Transportation Rail Division.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
PORT OF TACOMA Port of Tacoma Commission Meeting Eric Holdeman Director, Port Security.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
TXDOT PORT FAMILIARIZATION MAY 8, PORT FACILITIES PORT OF GALVESTON.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
1% Sales Tax Commission Board Meeting June 3, 2015.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
City of Toledo Bancroft Street, Secor to Parkside Project Public Meeting May 12, 2016.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Advertising Request for Proposals September 19, 2016 Recommendation to Award.
Port of Cape Town Development Plans
White Pigeon Community Schools
Stage 2 Light Rail Transit Program “In the ground ready”
City of Charlottesville
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Welcome to the Libertyville Stormwater Master Plan Open House
Finance Committee & City Council October 10, 2016
Public Works/Municipal Utilities Department
Sustainable Management
Dr. Christos Solomonidis Civil – Harbour Engineer Managing Director
Operations and Service Concept
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Bay Ridge & Gum Bayou P.E.R.
Maricopa County Transportation Improvement Program
Dana Heiberg, Senior Planner February 5, 2018
PORT OF GALVESTON PORT DIRECTOR’S REPORT
PORT OF GALVESTON PORT DIRECTOR’S REPORT
Aug. 14, 2018 The Large Projects are an investment into the future of your community. This investment will result in economic growth, improved quality.
Traffic Study Presented by Keith Wenners, pe, ptoe
2014 Annual Program Evaluation (APE) Status Update
Port of Cape Town Development Plans
FY Budget Workshop Meeting
Pre-Submittal Meeting As Needed Environmental Services RFQ
Presentation transcript:

PORT OF GALVESTON PORT DIRECTOR’S REPORT September 25, 2018

AT A GLANCE for AUGUST 2018 vs. 2017 Year to date Cargo The Port was up 44.8% in total cargo tonnage The Port was up 64.9% in lay vessel port calls The Port was up 26.2% in total vessel calls The Port was up 115.3% in grain tonnage The Port was up 38.0% in liquid bulk tonnage The Port was up 15.7% in containerized cargo The Port was up 37.0% in total RORO cargo

AT A GLANCE Lay dockage

Cargo statistics Total Tonnage Up – 44.8%

SHIP CALLS TOTAL SHIP CALLS UP – 27.8%

CRUISE STATISTICS passenger Movements Total cruise passengers up 12.6% Parking revenues up 13.4%

CRUISE STATISTICS passenger Movements Total cruise passengers up 11.89% Parking revenues up 12.59%

Financial Summary

Financial- Revenues

YTD Revenues

Year to Date Expenses

Year To Date Expenses

Financial – A/R Aging

Current CASH Position

Current Status - RFPs RFP/RFQ Status ERP Selection made – Today’s Agenda Security Service Evaluation Committee reviewing proposals (5) Financial Advisor Continuing evaluation process Parking Deck 11 proposals in – Evaluation Committee Reviewing West End Priority FEMA Projects Advertise 9/30

Rolling Grants for Year-end Grant status Rolling Grants for Year-end Texas Emissions Reduction Plan No. Agency Project Scope Project Cost - Submitted Status 1. TxDot Pier 37 Repairs $9.2M Phase II Submitted 2. Refurbish Old Port Industrial Road $2.7M 3. Fill Slip 38/39 $24.9M 4. U.S. DoT (ATCMTD) Harborside Drive & 25th Street Intersection and Elevated Pedestrian Walkway Pending 5. (CRISI) Intermodal & Railway Corridor Improvement Study $305,540 6. (BUILD) On-Dock Rail $25M 7. FEMA (PSGP) Maritime Domaine Awareness $697,125 Awarded 8. West End Intermodal $12M

Dredged material placement area A new inner levee was built at the Dredged Material Placement Area in Pelican Island This levee replaces part of the original East wall levee which was in advanced deteriorated conditions and was prone to failure. This repair allows the placement of 200,000 CY of dredged material in one cycle eliminating the risk of a slope failure and its consequences.

Dredging Project UPDATE Dredging started on August 08th at turning circle No. 1 Turning Circle No. 1 was completed on September 13th CT1 was completed on September 18th

Cruise terminal 3 parking and utilities RCCL will develop the terminal building project over 10 AC on the North side of Pier 10 POG will develop the parking and utilities over 15 AC on the South side Prequalification of POG’s Consultant is near completion POG has discussed with the City of Galveston their recent approach to resolve flooding issues along Harborside Drive. This approach is based on pumping stations estimated at $40 million each and a completion schedule of 4 years if funding is secured. The Port is consider other approaches with a shorter schedule.

Pelican island development The Pelican Island Development includes two berths and upland site development over an estimated area of 86 AC. This development will support vehicle and refrigerated cargo import operations. A proposal has been received from a Port’s Consultant for permitting this project. POG is developing a Conceptual design for the permitting process.

Old port industrial east The initial phase involving gathering and transfer of relevant information and agreeing in fundamental design parameters has been completed. The topographic survey and the geotechnical field work has been impaired by the rain during the first half of September. Interaction with Galveston Rail and BNSF has taken place to clarify interfaces. Work on the 30% design deliverables already started.

Walkway to ct1 improvements Current work is a conceptual analysis of options to improve circulation. Two options were developed for a ramp at the SMPG and five for the CT1 building. The ramp options at the CT1 building include one inside and four outside of it.

Walkway to ct1 improvements Two options were considered for circulation inside CT1 to segregate passengers from the public and prevent the latter from entering into the passengers only areas. A column at the SMPG end of the walkway will be replaced by a new one due to advanced corrosion.

SECURITY UPDATES The Port Police Department celebrated 106 years of service to the Port of Galveston September 12th. Port Police are planning to go to twelve-hour shifts for all patrol personnel. This will be implemented very soon. Police and Operations staff are evaluating Security Guard companies who may be utilized to take over the security at the gates and traffic details at the cruise terminals. Police staff are working with the Port’s Construction and Maintenance personnel to add additional directional signs at and around the cruise terminals. This is an on-going project with more changes to come. Police staff will be working with the Port’s Operations Division to implement a program for registering TNC’s (ride-share) drivers and vehicles.

EVENTS Aug. 31 Employee Lunch and Learn Sept. 17 TAMUG Sea Aggies Tour