European Regional Activities

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

WWRP THORPEX PDP WORKING GROUP MEETING 5.15 pm Tuesday 21 June (Buffet Supper) 6.00 pm Meeting Starts ECMWF Meeting Room 1 OFFICE BLOCK EXTENSION.
WWRP 1 THORPEX Summary Paper David Parsons U of Oklahoma School of Meteorology
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
WWRP 1 October 2010 THORPEX report to the WGNE David Burridge THORPEX IPO.
Introduction Slides for GIFS-TIGGE-11 meeting Richard Swinbank Masayuki Kyouda GIFS-TIGGE WG, Exeter, June 2013.
KADIR HAS UNIVERSITY SPORTS LAW RESEARCH AND IMPLEMENTATION CENTRE The first and only academic institute dealing with Sports Law in Turkey. Foundation:
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
David B. Parsons School of Meteorology University of Oklahoma 1.
Actions from DAOS-4 Action 2: WMO to set up the DAOS web pages and implement appropriate links to other projects and monitoring sites (T. Nakazawa) Action.
Proposal for a WWRP High Impact Weather Project Sarah Jones, Brian Golding Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat.
WEATHER RESEARCH AFTER THORPEX Acknowledgements: USTEC Members US THORPEX Planning Workshop, Silver Spring, MD, 5-6 June
THORPEX Activities 1 Sue Gray and John Methven University of Reading.
EEA draft annual work programmes 2016 and 2017 André Jol EEA Head of Group Climate change impacts, vulnerability and adaptation 9th EIONET workshop on.
Personal David Burridge Ex Director ECMWF Ex Director IPO (twice) Ex NED Met Office.
THORPEX European Plan D. Majewski, DWD, Germany THORPEX - Overview Aims and structure of THORPEX European Plan Some comments on each section Possible contributions.
EUROPE. September 08 to 11 September 12 to 14 September - 15.
11 4 th THORPEX –Asia Science Workshop and 9 th ARC meeting Recent Developments in the THORPEX Programme Jim Caughey, THORPEX IPO 31 October-3 November.
Continuation of FOT-Net's activities FOT-Net Data FIELD OPERATIONAL TEST NETWORKING AND DATA SHARING SUPPORT Amsterdam 19 March 2014 Sami Koskinen, VTT.
P redictability AN d D ynamics O f W eather Systems in the A tlantic- E uropean Sector Severe Convection European Windstorms Mediterranean Cyclones Tropical.
Meeting Interreg SYSIASS project 27 th January 2012 Part-financed by the European Regional Development Fund 1.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
CAS MG1/Doc. 2.1 (Valid September 27, 2010) REPORT OF THE PRESIDENT of the COMMISSION FOR ATMOSPHERIC SCIENCES Dr. Michel Béland.
9 December 2005 Toward Robust European Air Pollution Policies Workshop, Göteborg, October 5-7, 2005.
T-PARC Operations Plan Outline Chapter 1. T-PARC Overview Chapter 2 Scientific Mission Planning Organization and Intensive Observing Period Definition.
WWRP 1 THORPEX Accomplishes, Challenges and Lessons Learned David Parsons U of Oklahoma School of Meteorology
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
Authors George Craig, Evelyne Richard, David Richardson David Burridge, Sarah Jones Frederic Atger, Martin Ehrendorfer, Martti Heikinheimo, Brian Hoskins,
1 GIFS-TIGGE WG MEETING AUG. 31 – SEPT , GENEVA, SWITZERLAND Richard Swinbank & Zoltan Toth (UK Metoffice & NOAA/OAR/ESRL/GSD) Acknowledgements:
WWRP The THORPEX Mid-Term Review David Burridge Of no particular abode.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
WWRP THORPEX Alan Dickinson Chair THORPEX ICSC and David Burridge THORPEX IPO.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
TIGGE LAM Report WWRP JSC meeting-Geneva Febrary th WWRP JSC meeting Geneva April 2012 TIGGE LAM Report Tiziana Paccagnella with contributions.
WWRP Commission of Atmospheric Sciences - new projects Polar Prediction project – “The Commission concurred with the Executive Council Panel of Experts.
11 THORPEX Update Jim Caughey THORPEX IPO WMO Geneva Data Assimilation and Observing Systems Working Group 4 th Meeting Met Office, Exeter June.
Visegrad Regional Seminar on Global Development Education Prague, 24 th - 25th March Global Education in Poland Ministry of National Education.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
THORPEX Legacy Projects Progress Report (Agenda Item 5.1) T. Nakazawa C/WWRD.
Introduction slides for Joint GIFS-TIGGE/PDP Meeting Richard Swinbank, Masayuki Kyouda, Heini Wernli, Istvan Szunyogh Joint PDP & GIFS-TIGGE WG meeting.
Early Career Housing Research Funding John Flint (University of Sheffield) Housing Studies Association Annual Conference 2016 University of York 6-8 April.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Predictability and dynamical processes
بسم الله الرحمن الرحيم.
Introduction Slides for GIFS-TIGGE-12 meeting
THORPEX-Europe Meeting Summary Dale Barker
THORPEX Update Jim Caughey THORPEX IPO WMO Geneva GIFS-TIGGE
THORPEX report to the CAS Management Group Alan Dickinson ICSC Chair
Customization of TIGGE: Use of TIGGE data in West Africa
Links with GEO.
General Meeting 26 – 28 April 2018
T-NAWDEX THORPEX - North Atlantic Waveguide
Causes of improvements to NWP (1979 – 2009)
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Science Objectives contained in three categories
Thorpex North American Regional Committee (NARC)
Welcome! We are in the second phase of IFLA’s Global Vision discussion. We are here to contribute to the largest ideas store of actions based on the results.
Actions related to OSH Unit EMPL B3
GEOWOW update Richard Swinbank GIFS-TIGGE meeting March 2014
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
High Impact Weather Emerging challenge identified at CASXVI
The IPO to organise a review Encouraged review
THORPEX PDP Working Group Current and proposed membership
Presentation transcript:

European Regional Activities 2012-2013 September 2010

Selected THORPEX related activities in Europe PDP: Research Groups (Prevassemble, DIAMET, PANDOWAE) using data from TIGGE, YOTC and field campaigns (e.g. T-PARC, HYMEX) planning future field campaigns DAOS: strong contribution GIFS-TIGGE: GEOWOW and TIGGE-LAM HYMEX (Presentation ICSC/JSC) T-NAWDEX&DOWNSTREAM (Presentation ICSC/JSC) Planning and implementation of THORPEX Legacy Projects

Organisational Aspects in 2013 International workshops for HIW Project (18-19 March) and T-NAWDEX (20 March) Workshops Organisation: PANDOWAE, WWRP/THORPEX, DWD, DLR No ERC Meeting since ICSC-10 Issues for the future: European Regional Meeting? Contributions to Summary Paper Follow on activities – influencing and supporting research applications, maintaining academic / operational collaboration, ……