Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
EU Developments Transmission Workgroup 3rd November 2011.
Completing the EU internal energy market IFIEC, 22 November 2011
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
European Developments Transmission Workgroup 1 March 2012.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Completing the EU internal energy market
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
South Region Second Edition
10 year investment plan ERGEG approach and contribution
21st IG Meeting South Gas Regional Initiative
Transparency Project GRI NW Region
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
Ben Voorhorst, President, ENTSO-E
43th IG Meeting South Gas Regional Initiative
2009 TSO Transparency Gas Regional Initiative North-West
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
Ashgabat International Energy Charter Forum
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
Meeting of NSOG Electricity Regional Groups Preparation of the 3rd PCI list - Identification of Infrastructure Needs Brussels, 27 October 2016.
26th February 2015 Teleconference
Gas Regional Investment Plan North West
Transparency Project GRI NW Region.
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
26th February 2015 Teleconference
European Winter Outlooks 2008/2009 and 2009/2010
LNG Workshop Bilbao, March 13th 2009 GLE.
Work plan of GRI NW for 2011 Three out of four projects are started
The establishment of the 2nd list of Projects of common interest
Projects of Common Interest
Presentation transcript:

Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),

NW GRIP 2013 Timeline - past 23 Nov 2012 Early 2013 4th April Early July Early Sept. 5th Nov 2013 26th Nov 2013 28th Nov 2013 GRI NW consultation on concept Start drafting the document Broad Stakeholder Consultation Draft version to GRI NW Deadline for GRI NW response Publication, start consultation phase Presentation for ENTSOG GRIP workshop Presentation for GRI NW SG meeting

NW GRIP 2013 Timeline - future 5th Nov 2013 26th Nov 2013 28th Nov 2013 1st Jan 2014 2014 2015 Publication, start consultation phase Presentation for ENTSOG GRIP workshop Presentation for GRI NW SG meeting End consultation phase Review of feedback ENTSOG discussions future GRIPs New NW GRIP 2015

GRIP Süd-Nord-Korridor GRIP North South CEE NW GRIP BEMIP GRIP Süd-Nord-Korridor GRIP North South CEE GRIP South Corridor GRIP South GRIP North South Corridor

Introduction Obligation from Regulation (EC) 715/2009 Article 12 Supported by 24 TSOs in 9 countries 1st GRIP of all regions 2nd NW GRIP (1st NW GRIP published November 2011) Feedback considered: Stakeholders (January 2012) GRI NW (May 2012) ACER opinion (March 2013) Stakeholders and GRI NW (May 2013) Stakeholders (May 2013) GRI NW (September 2013) 5

Contents of the report North West Specifics Supply & Demand (update July 2013) TYNDP identified issues for NW region Background to North West European Infrastructures Projects Project Matrix (providing easy access to project list in appendix) Appendix Extensive project list (update September 2013)

North West Specifics History of cooperation Case studies Role of gas in supply mix L-gas EU energy policy objectives Competition SoS Sustainability

Cross Border Interconnection Capacity Gas higher than Electricity

NW European Hubs close price correlations

Supply & Demand (update July 2013) Annual and peak demand Comparison with TYNDP figures Supply Diversification and dependency Unconventionals

Growing Import Dependency xxxxxx Annual and peak demand Comparison with TYNDP figures Supply Diversification and dependency Unconventionals

Increased Need for Flexibility xxxxxx Annual and peak demand Comparison with TYNDP figures Supply Diversification and dependency Unconventionals