MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
LHC progress Report LHCC Wednesday 23 rd March 2011.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Floating MD week 28 summary
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann Machine Coordinators: Gianluigi Arduini, Eva Barbara Holzer 28 November 2012

MD#4 News & Plan Mon – Tue (26. – 27.11.) Day Time v MP class MP Comments Mon 06:00 Ramp down if needed 08:00 450 GeV: IR8 aperture A 450 GeV Pilote bunches(1e10p/bunch) to measure aperture. 10:00 450 GeV: Beam instrumentation B BSRT vs WS, Schottky, WS PM saturation (partially done in MD3): B1: Pilot + 12b >=1.1e11p/bunch B2: Pilot + 50ns trains from 6 to 72 bunches Bumps at 450GeV and 4TeV Blow up with ADT 2) BGI, Gates BBQ, BSRT temperatures: 450GeV 50ns trains with minimum 600 bunches Bumps in B2 +- 3mm Gating with ADT off on some bunches 3) BPMs: Done in MD3 4) Matching: Probe from 1 to 5e10p Inj, circulate (~100 turns) and dump (More details see slides ) 16:00 450 GeV 4 TeV: p-Pb test C From MD2 preparation: 450GeV and 4TeV Bunches of ~1.5e10p/bunch and >5e7Pb/bunch B2: few proton bunches and few Pb bunches B1: > 300 bunches with 10% ~1.5e10p/bunch, later with higher intensities. Test RF re-phasing procedure. Squeeze sequence and collisions. (More details see slides) cancelled (QPS access S6-7 RQF/RQD, MKI2 fault in softstart, dump line vacuum); to be rescheduled as Operational Dev. BPM studies and beam excitation, … 24 p batches from the SPS posed problems

MD#4 New & Plan Mon – Tue (26. – 27.11.) Day Time v MP class MP Comments Tue 00:00 Ramp down 02:00 450 GeV 4 TeV: MQY transfer function A 4 TeV. Pilote bunches (1-3e10p/bunch). Standard optics measurements with different MQY transfer funtions. 06:00 08:00 450 GeV: RF study (longit. stability for batch or RF voltage modulation) B 450GeV A few nominal batches of 144b. RF Voltage modulation: fill half of the ring, to test the corrected algorithm of voltage set point adjustment Longitudinal stability: Full ring with max. bunch intensity. Excite a single mode in the beam with decreasing gain in the feedback loop. (More details see slides) 16:00 450 GeV: beam-beam (noise or impedance) C 450 GeV In total 9 bunches per beam with different intensities (from 1e11 to 2e11), zero crossing angle in IP1, IP2 and IP5. Nominal crossing angle in IP8. Collision tune, Damper (ADT) off Introduce increasing noise with ADT Increase ADT gain in steps Scan separation in IP1 and 5 with 4 bunches (from 1e11 to 2e11) with damper of. 22:00 450 GeV 4 TeV: Collimation impedance & follow up from last MD 4 TeV ~3b (1.3e11p/bunch) below SBF Alignment of collimators Impedance studies with tight collimator settings and moving IR7 collimators back and forth. successful! successful successful successful

MD#4 Plan Wed – Thu (28.-29.11.) in progress Wed 04:00 Ramp down 06:00 Day Time MD MP class MP Comments Wed 04:00 Ramp down 06:00 450 GeV 4 TeV: two –beam impedance C 4TeV, squeeze to beta*=1.5m 150 bunches per beam (nominal filling scheme) Move beam 2 clockwise Reduce octupole currents in 5 different configurations (0 turn, ¼ turn, ½ turn, ¾ turn and 1 turn cogging) (More details see slides) 14:00 16:00 450 GeV: transverse impedance localization at injection 450GeV 8bunches with different intensities, equally spaced (5e9 … 1e10 … 5e10 … 1e11 … 1.5e11 … 2.2e11) Create kick with AC dipole or kicker Tune shift 2.1e-3 Move TDI Parallel measurement with ADT? (More detials see slides) 18:00 450 GeV: TCDI automatic setup A 450 GeV Pilot bunches (1e10p/bunch) 22:00 450 GeV 4 TeV: bunch flattening with RF phase modulation B 450 GeV and 4TeV Nominal LHC beam, i.e. 1374b per beam Add flattening signal (sine-wave close to the synchrotron frequ.) The MD will have ramp and all steps before physics. Measure effects of heating and transv. Instabilities. Thu 02:00 End of MD#4 in progress

RF Study MD - voltage modulation (T. Mastoridis, J. Molendijk, P. Baudrenghien et al) With machine half-full adjusted the phase of the RF voltage set-point to minimize klystron power. With 1-T feedback ON the algorithm was not converging for 2 out of 16 cavities, and the converged set-point was not following the beam loading exactly. Working with 1-T feedback OFF resulted in excellent performance. (Preliminary) conclusion: The "smoothing" algorithm works fine with 1-T feedback OFF. The interplay with the 1-T feedback is to be understood. phase modulation of set point Cav5B2 klystron average power: drop at 11:58 (B1) & 12:02 (B2), when adaptation was switched on 28-11-2012 MD block 4

RF Study MD - longitudinal stability in batch mode (T. Mastoridis, J. Molendijk, P. Baudrenghien et al) Excited longitudinal coupled-bunch dipole modes of order 1, 3, 4 and 13, while reducing gain of RF feedback around cavity by 3, 9, 15 and 18 dB and while rotating the RF feedback phase by 5 and 10 degrees. The 1-T feedback was off. The beam remained stable in all settings. Conclusion: impedance of RF cavities at the fundamental frequency is reduced to a level compatible with at least 10 times the present beam current at 400 MHz. Detailed analysis of the response to the excitation will yield damping rates and cross-check 28-11-2012 MD block 4

Beam-Beam & Noise MD collision tunes, Q’~2 units (X. Buffat, W. Hofle, T. Pieloni, ++) collision tunes, Q’~2 units external ADT noise amplitude calibrated w 1 bunch in B1 (V) 1 pilot & 3 bunches of different intensity (1E11, 1.5E11, 2E11) lack of good lumi signal from ATLAS → collided only in IP5 with ADT off, white noise was introduced in steps on B1V; WS measurement indicates different behavior for the different bunches, t.b.c. offline in particular, significant losses and emittance growth on the bunch with highest beam-beam tune shift at the end, recovering lumi signal from ATLAS & being unable to refill, collided in IP1 as well, and repeated the noise level scan eventually, turning on the ADT seemed to lower the emittance growth 28-11-2012 MD block 4

Beam-Beam & Noise MD cont’d 20:35 luminosity signals from CMS and ATLAS

Beam-Beam & Noise MD cont’d 21:34 ATLAS published luminosity signals recovered (thanks Thilo Pauly!)

Collimator MD – loss maps on the ramp Beam 1 2 TeV Beam 1 4 TeV

Collimator MD – loss maps on the ramp Beam 2 2 TeV Beam 2 4 TeV 14-09-2012 Outline of MD block 3

Collimator MD - impedance (S. Redaelli ++) - collimators initially to nominal settings. - tried measuring Q’ with ADT off → instability (B1 H). - first tune shift measurement keeping the ADT on and leaving Q’ at physics settings → moved TCSG in IR7 back and forth (5.1 to 9 s). Tune shift to be analyzed offline (no clear signal online). - measured Q’ with ADT off → got again several instabilities. Trimmed Q’ closer to zero, and kept ADT off. - second tune shift measurement: same TCSG IR7 back-and- forth movement, with ADT off. Again tune shift to be analyzed offline (no clear signal online). - finally, moved back-and-forth TCP from 4.2 to 6.2 s, with ADT off → again no clear signal online

Collimator MD – impedance cont’d Q’ measurement: Q’=6, 0 B1 , then trimmed by -10, +2 Q’=0, 13 B2 , then trimmed by -10, +2 B1 instability with ADT off seen on BBQ Second tune shift measurement: TCSG IR7 in / out , ADT off Third tune shift measurement, moving TCP IR7 in /out with ADT off.

Collimator MD – impedance cont’d B2V loss map with nominal settings 14-09-2012 Outline of MD block 3

Collimator MD – impedance cont’d Alignment completed for 10 collimators, however have to stop half-way through for next MD

Two-beam impedance MD 78 bunches per beam squeezed to 0.6 m nominal Q’, no tune split, ADT off octupole scan for nominal position; poor lifetime B1 & reproducible onset of instability for B2 at 370 A (P. Baudrenghien, S. Fartoukh, E. Metral, et al) B1 emittance before B2 instability prepared settings for rotation B2: -12 Hz offset (+0.11 mm, +1E-4 dp/p) -1 Hz/s max acceleration it will take 13 minutes to rotate B2 by 1/4 turn B1 emittance after B2 instability lowered tunes on the more stable B1 by -0.005 trim → lifetime increased & B2 more stable …

MD#4 Plan Wed – Thu (28.-29.11.) shift this MD by 2 h? Day Time MD MP class MP Comments Wed 04:00 Ramp down 06:00 450 GeV 4 TeV: two –beam impedance C 4TeV, squeeze to beta*=1.5m 150 bunches per beam (nominal filling scheme) Move beam 2 clockwise Reduce octupole currents in 5 different configurations (0 turn, ¼ turn, ½ turn, ¾ turn and 1 turn cogging) (More details see slides) 14:00 16:00 450 GeV: transverse impedance localization at injection 450GeV 8bunches with different intensities, equally spaced (5e9 … 1e10 … 5e10 … 1e11 … 1.5e11 … 2.2e11) Create kick with AC dipole or kicker Tune shift 2.1e-3 Move TDI Parallel measurement with ADT? (More detials see slides) 18:00 450 GeV: TCDI automatic setup A 450 GeV Pilot bunches (1e10p/bunch) 22:00 450 GeV 4 TeV: bunch flattening with RF phase modulation B 450 GeV and 4TeV Nominal LHC beam, i.e. 1374b per beam Add flattening signal (sine-wave close to the synchrotron frequ.) The MD will have ramp and all steps before physics. Measure effects of heating and transv. Instabilities. Thu 02:00 End of MD#4 shift this MD by 2 h? time of last MD - pending proposal by Gianluigi Arduini