Cryoplant Installation Design Summary

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Installation Package - Electrical
Cryoplant Installation Organization
Director’s Progress Review Closeout Meeting
Generic GE TRS Compliance Summary
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
eSPL Innovative Management Technology
Installation Procurement Package
4.5 K Cold Box Schedule Recovery Directors’ Review
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Cryogenic Plant Electrical and Controls
2K Cold Box FDR Introduction
Advanced Post Graduate Program in Piping Design & Engineering with PDMS & CAESAR-II
Western Michigan University Central Power Plant
2K Cold Box PDR Introduction
Cryoplant Installation Overview
Cryoplant Installation Package - Mechanical
Technical Scope of Work
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Cryoplant Installation Scope
LCLS-II 2K Cold Box Controls Design Review
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Cryoplant Controls Readiness to Procure
2K CB FDR Overview:  Agenda, Charge, Review Process
The Life Cycle of a Project – START to FINISH
Leading Indicators and Dashboarding for Advanced Work Packaging
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
Welcome, Agenda, Review Charge
Technical Scope of Work
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Pressure Piping Analysis
2K Cold Box Cost, Schedule & Staffing
Meeting of the LCLS Facilities Advisory Committee
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
Undulator Vacuum System
Undulator Scope, Management, and Organization
Scope, Requirements Deliverables & Schedule
LINAC OPS Budget Review
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Far Experimental Hall Hutches Civil Construction
Operator Training Requirements
Control Hardware & Status
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
Piping and Instrumentation for Process Industries
Installation of Photon Beam Transport to FEH
CONVENTIONAL FACILITIES LCLS Office Space
CryoPlant Commissioning
Workshop commissioning Installation Coordination at ESS
Undulator Vacuum System
1. Process Hazards Checklists
LCLS-II Cryoplant Controls Workshop.
Extraction Michael Bevins May 17, 2007
Richard Hislop Construction Safety Coordinator
Onsite Training at JLab
Presentation transcript:

Cryoplant Installation Design Summary Dana Arenius LCLS-II Cryoplant General Contractor Installation Package Review 1 June, 2017

Design Status Summary Working closely with Smith Group to develop installation GC work documentation in CSI format Contribution to the deliverables include: Wiring schematics of point to point installation electrical and electrical wiring in one-line and control wiring schematics to SG Mechanical interconnecting piping design Equipment locations and termination point details JLab supplied and GC supplied equipment/material list Installation compliance test requirements Review of SG CSI format documentation Review of the SG generated platform structural design Design completion resource manpower and schedule is in place Supportive engineering calculations and vendor documentation to SLAC Building Inspection Office, Pressure Safety Systems, and Electrical Safety committee as design safety validation LCLS-II JLab Director's Cryoplant Installation Review, June 1, 2017

Design Work Status and Plan Forward Detailed status and remaining installation work with required resources have been presented in each of the electrical/controls, and mechanical status presentations. Can not provide remaining mechanical installation documentation by June 15th, forecast is by July 7th LCLS-II JLab Director's Cryoplant Installation Review, June 1, 2017