Track Finder Crate, Backplane and Parts

Slides:



Advertisements
Similar presentations
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
ZTF Interconnecting Scheme Stephen Kaye
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
S A Griffiths CM42 June 2015 Electrical & Control.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Muon Track-Finder Trigger
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
WP02 PRR: Master Oscillator and RF Reference Distribution
DT Infrastructure: LV, HV, Gas
SCT/Pixel Draft Rack Layout rcj
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
ATLAS USA15 - Rack 52U with 9U crates, remote PS
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Fred’s Input to Rice Workshop
Sector Processor Status Report
SP Main FPGA & DT transition card design status
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Custom Mezzanine for the MTF7 Processor
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

Track Finder Crate, Backplane and Parts Alex Madorsky University of Florida Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Backplane Standard VME 64x J1/P1 backplane DDU MPC 1 MPC 2 MPC 3 SRSP 1 SRSP 2 SRSP 3 SRSP 4 SRSP 5 SRSP 6 SRSP 7 SRSP 8 SRSP 9 SRSP 10 SRSP 11 SRSP 12 Clock and control Muon sorter These SRSP feedthru connectors are for DT information exchange via transition board Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Backplane corrections 80 MHz clock lines to three MPC slots Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Power consumption Based on very conservative calculations Each Sector Processor: 21.5A @ 3.3V 3A @ 5V Crate (safety factor 1.5): 400A @ 3.3V 60A @ 5V Total maximum power: ~1620 W Power consumption will be thoroughly measured before crate is ordered Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts W-IE-NE-R 9U crate Standard VME-64X J1 section Custom J2 and J3 sections Power supply 6U box (10 modules max) 4 MEH modules (115A each) @ 3.3V 1 MEH module @ 5V ±12 and –5 V if necessary Input: 115 or 220V (selectable) Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Cooling: Most powerful fan tray 6020/4 type 1500 m^3/hr Temperature sensors on top of the crate Two threshold temperatures First switches fans to maximum RPM Second turns off power Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate spare parts 1 Power supply box, 6U (without power modules) 2 MEH power modules (2-7V, 115A) 1 J1 standard VME64X backplane 1 Fan tray, 6020/4, intelligent Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Track Finder Rack Rack requirements: Power outlets (220V, 50 Hz, 15A) Front and Back door with locks, to protect optical cables Cable strain relieves on front and back of TF crate. Probably need to be custom-designed by us. The rest is according to Rack Wizard Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Rack Wizard Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Rack Wizard Entry in Rack Wizard for TF crate was done a few months ago Currently, message from Rack Wizard is: This version of Rack Wizard is no longer supported. Please use the link below: https://oraweb.cern.ch/pls/cmsintegration/docs/EDMH.html …and this link does not work… Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Control computer and VME controller 1 computer + 1 spare 1 VME controller + 1 spare Computer and controller can be purchased later on. We have everything to run tests now. Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts

Track Finder Crate, Backplane and Parts Parts procurement All parts are available within 4-6 weeks delivery time, except optical links Optical links FTRJ-8519-1-2.5 are obsolete Need ~500 pcs (SP+MPC) Found and ordered 409 pcs Drop-in replacement part is FTRJ8519F1GNL If the rest of original part could not be found, replacement part has to be tested before ordering All other parts will be ordered soon. Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts