CEOS OpenSearch Project II

Slides:



Advertisements
Similar presentations
Data Stewardship Interest Group WGISS-39 Meeting
Advertisements

WGISS Working Group for Information Systems & Services Richard Moreno CNES – WGISS chair WGISS-39 Tsukuba - JAPAN 11 th May – 15 th May 2015 Committee.
WGISS CNES SIT-30 Agenda Item 10 CEOS Action / Work Plan Reference 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015.
NASA/ESA Interoperability Efforts CEOS Subgroup - CINTEX Alexandria, Sept 12, 2002 Ananth Rao Yonsook Enloe SGT, Inc.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 31 Satoko Horiyama MIURA WGISS Report and Actions.
WGISS Richard MORENO CNES CEOS SIT-29 Meeting CNES, Toulouse, France 9 th -10 th April 2014.
WGISS Working Group on Information Systems and Services Richard MORENO CNES WGISS report, Agenda Item 14 Tromsø, Norway October 2014.
WGISS Richard Moreno CNES SIT Workshop Agenda Item #7 WGISS working group CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th -18 th September.
WGISS Richard MORENO CNES SIT Workshop Agenda Item #8 CEOS SIT Technical Workshop CNES, Montpellier, France 17 th -18 th September 2014.
Committee on Earth Observation Satellites CNES Plenary Agenda Item #21 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
Slide: 1 CWIC Status Report Yonsook Enloe WGISS-40, Harwell UK Oct 1, 2015.
Slide: 1 37 th WGISS meeting|Cocoa beach | 14 april 2014 Richard Moreno WGISS chair report.
Page 1 Federated Earth Observation (FedEO) Status CEOS WGISS Meeting #40 28 Sep – 02 Oct, 2015 Harwell, UK Hosted by UKSA M.Albani, P.Mougnaud, A.Della.
CEOS OpenSearch Project Yoshiyuki Kudo (JAXA) WGISS-37.
Page 1 OpenSearch Project CEOS WGISS Meeting #40 Interoperability Interest Group M.Albani, P.Mougnaud, A.Della Vecchia (ESA) Yves Coene (Spacebel) WGISS#40.
ESA UNCLASSIFIED – For Official Use INSPIRE Orthoimagery TWG Status Report Antonio Romeo ESRIN 15/02/2012.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
CEOS Working Group on Information System and Services (WGISS) Data Access Infrastructure and Interoperability Standards Andrew Mitchell - NASA Goddard.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Data Stewardship Interest Group WGISS-43 Meeting
European Monitoring Platform for Mapping of QoS and QoE
EO OpenSearch GeoJSON Encoding
HMA Follow On Activities
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
CEOS Work Plan Andrew Mitchell - NASA WGISS-43
CEOS OpenSearch Project II
CWIC Status Report Yonsook Enloe yonsook. k.
“OpenSearch for EO” Evolution
WGISS Connected Data Assets
High Level Architecture
WGISS Connected Data Assets Sept 26, 2017 Yonsook Enloe
UNR116 splitting Informal document GRSG
GeoJSON(-LD) Encoding of Granule Metadata
WGISS Infrastructure Project (WISP) Report
CEOS OpenSearch Project II
INPE, São José dos Campos (SP), Brazil
O. Barois, A. Della Vecchia, M. Albani (ESA)
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
Data Stewardship Interest Group WGISS-45 Meeting
A. Della Vecchia, D. Guerrucci, M. Albani (ESA)
WGISS Connected Data Assets April 5, 2017 Yonsook Enloe
CEOS and GEO Workplan Review
CEOS Information Systems Survey
WGISS Connected Data Assets April 9, 2018 Yonsook Enloe
HMA Follow On Activities
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
Review of Decision 2010/477/EU and MSFD Annex III
A. Della Vecchia, D. Guerrucci, M. Albani (ESA)
CEOS OpenSearch Conformance Test Document
WGISS Connected Data Assets Oct 24, 2018 Yonsook Enloe
HMA Follow-on Kickoff Meeting
WGISS Connected Data Assets Client Guide Oct 23, 2018 Archie Warnock
CEOS Virtual Constellations Process Paper
WGISS - 41 GA/CSIRO, Canberra, Australia 16th March 2016
CEOS OpenSearch Project
VC Title Goes Here Name (s), Organization, CEOS Affiliation
M. Albani, P. Mougnaud, A. Della Vecchia (ESA)
HMA for Science Task 1 – Project Management
Working Group on Information Systems and Services (WGISS)
A. Della Vecchia, D. Guerrucci, M. Albani (ESA)
A. Della Vecchia, D. Guerrucci (ESA)
OGC Happenings: OGC19-020: Testbed-15 Service Discovery
WGISS Connected Data Assets Session Today
Data Discovery and Access Session Summary of Actions
WGISS WGISS Connected Data Assets Status Report October, 2019 CWIC Team Eugene Yu (GMU), Archie Warnock (A/WWW), Li Lin (GMU)
ESA EO Thesauri Andrea Della Vecchia (Randstad), Yves Coene (Spacebel)
Federated Earth Observation (FedEO)
Presentation transcript:

CEOS OpenSearch Project II CEOS WGISS Meeting #45 A. Della Vecchia, O. Barois, M. Albani (ESA) Yves Coene (Spacebel) 09/04/2018

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

Working Groups (WGs) CEOS WGISS OpenSearch II Project, started with WGISS#40, led by: ESA Andrea Della Vecchia ESA Olivier Barois, since Dec’17 Damiano Guerrucci Spacebel Yves Coene On the basis of the WGISS-40 meeting conclusions (WGISS-40 MoM), the following targets have been defined: Consolidation and finalization of CEOS OpenSearch Best Practice document Updating of the CEOS Developer Guide document in accordance with the BP finalisation Start discussion about CEOS OpenSearch Conformance Tests document CEOS WGISS Connected Data Assets System Level Team, led by Yonsook Enloe, was created after the WGISS#42 in September 2016 (Action WGISS-42-09). It aims to analyse the CEOS Data Assets, identify interoperability issues, propose solutions and feed CEOS standardisation initiatives in synergies with OGC activities. Monthly telco performed since 24 October 2016.

Objectives To set up and make available a fully standardised and interoperable CEOS (but not limited to) connected data assets, following items need to be addressed: Make available CEOS OpenSearch endpoints: IDN, CWIC and FedEO IDN https://cmr.earthdata.nasa.gov/opensearch/collections/descriptor_document_facets.xml?clientId=cswOpenSearchDoc CWIC http://cwic.wgiss.ceos.org/opensearch/datasets/osdd.xml?clientId=cwicClient FeDEO http://fedeo.esa.int/opensearch/description.xml Agree and define CEOS OpenSearch Guidelines, including: CEOS OpenSearch Best Practice, version 1.2, issued on 13/06/2017 CEOS OpenSearch Developer Guide, version 2.0D3, issued on 14/11/2016 CEOS OpenSearch Conformance Test Deliver CEOS conformance Test SW to quantify: CEOS OpenSearch endpoints compliancy with CEOS Guideline Interoperability among CEOS OpenSearch endpoints Points II and III could be reiterated considering new CEOS WGISS requirements and taking care of OGC standardization initiatives

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

CEOS OS / SLT Working Group Objectives To set up and make available a fully standardised and interoperable CEOS (but not limited to) connected data assets, following items need to be addressed: Make available CEOS OpenSearch endpoints: IDN, CWIC and FedEO IDN https://cmr.earthdata.nasa.gov/opensearch/collections/descriptor_document_facets.xml?clientId=cswOpenSearchDoc CWIC http://cwic.wgiss.ceos.org/opensearch/datasets/osdd.xml?clientId=cwicClient FeDEO http://fedeo.esa.int/opensearch/description.xml Agree and define CEOS OpenSearch Guidelines, including: CEOS OpenSearch Best Practice, version 1.2, issued on 13/06/2017 CEOS OpenSearch Developer Guide, version 2.0D3, issued on 14/11/2016 CEOS OpenSearch Conformance Test Plan, version 1.0D1, by April 2018 Deliver CEOS conformance Test SW to quantify: CEOS OpenSearch endpoints compliancy with CEOS Guideline Interoperability among CEOS OpenSearch endpoints Points II and III could be reiterated considering new CEOS WGISS requirements and taking care of OGC standardization initiatives

Approach CEOS Conformance Test Plan Document Organised as European Cooperation for Space Standardization (ECSS) Software Validation Specification (SVS) Test Designs Test Cases

Proposed ToC

Test Design

Test Cases

Traceability

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

CEOS OS / SLT Working Group Objectives To set up and make available a fully standardised and interoperable CEOS (but not limited to) connected data assets, following items need to be addressed: Make available CEOS OpenSearch endpoints: IDN, CWIC and FedEO IDN https://cmr.earthdata.nasa.gov/opensearch/collections/descriptor_document_facets.xml?clientId=cswOpenSearchDoc CWIC http://cwic.wgiss.ceos.org/opensearch/datasets/osdd.xml?clientId=cwicClient FeDEO http://fedeo.esa.int/opensearch/description.xml Agree and define CEOS OpenSearch Guidelines, including: CEOS OpenSearch Best Practice, version 1.2, issued on 13/06/2017 CEOS OpenSearch Developer Guide, version 2.0D3, issued on 14/11/2016 CEOS OpenSearch Conformance Test – SLT review and consolidation Deliver CEOS conformance Test SW to quantify: CEOS OpenSearch endpoints compliancy with CEOS Guideline Interoperability among CEOS OpenSearch endpoints Points II and III could be reiterated considering new CEOS WGISS requirements and taking care of OGC standardization initiatives

Conformance Procedures - Open Issues CEOS OpenSearch Conformance Test Document Complete first draft – by April 2018 WGISS SLT Working Group review – by May 2018 Consolidation – by Mid June 2018 Deliver CEOS Conformance Test SW – (TBD) CEOS Conformance Test Software will permit to validate and score external OpenSearch endpoints vs CEOS guideline. This CEOS tool will be completely based on CEOS OpenSearch Conformance Test guidelines. Within WGISS SLT working group the following as been discussed and preliminary agreed: NASA to keep the CWIC-Smart Validation/Test page updated with future CEOS OS BP changes (SLT MoM 01/03/2017) NASA does have plans to make all their software, including CWIC-Smart client, open source. Until that happens, the CWIC-Smart client is a publically accessible service (SLT MoM 01/03/2017) ESA available to support NASA to enhance and test CWIC-Smart Validation software, to produce a CEOS tool usable by all agencies (SLT MoM 01/03/2017). This also implies the application of an open source license for this Conformance Test Software (Sec. 4.2 WGISS#42 MoM)

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

Synergy with OGC initiatives At last OGC Technical and Planning Committee Meeting in Orleans, France, 19-23 March ‘18, the EO Product Metadata and OpenSearch Standardization Working Group (SWG) achieved the following major milestone: Introduced the “final" version of the new EO OpenSearch standard evolution document package, including: OGC 13-026r9 – OGC OpenSearch Extension for Earth Observation, this is a major consolidation of the spec (from OGC-13-026r8 to OGC-13-026r9) that addresses many issues (CEOS OpenSearch Best Practice is applicable) OGC 17-047 - OGC OpenSearch-EO GeoJSON(-LD) Response Encoding Standard, this defines how an opensearch response should be encoded in geoJson, as a OWS Context. It describes the “envelope” of a search response. The result items can be either EO products or EO Collections. These are described in separate specs which are reference documents to OGC-17-047 OGC 17-003 - OGC EO Dataset Metadata GeoJSON(-LD) Encoding Standard, this is the spec for the EO product metadata in geoJson. It is based on a simplified metadata model and attribute vocabulary which was discussed/reviewed at CEOS/WGISS level (in particular with NASA). Requested to OGC to approve that the related document package enters the so-called “public review” phase (3 weeks). After this phase, final steps will be to address eventual comments and to obtain the adoption as a standard.

Agenda CEOS WGISS Working Groups (WGs) & Objectives Achievements Pending Activities Synergy with OGC initiatives Conclusions & next steps

Conclusion & Next Steps … NEXT STEPS to be Discussed… Short terms CEOS Open Search Conformance Test document consolidation CEOS Conformance Test SW Longer Terms A further review cycle of CEOS Best Practice, considering OGC 13-026r9 and OGC 17-047, would significantly simplify the document