EB Reporting PT David Gerbec EBSG 5th of March 2018.

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
The Regulation on wholesale Energy Market Integrity and Transparency (REMIT)
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
An introduction to the EU and its legislation. Member States currently 15 –Austria- Ireland –Belgium- Luxembourg –Denmark- Netherlands –Finland- Portugal.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Preparation of future ENI CBC programmes - State of Play Vanessa De Bruyn (DG DEVCO) 3 December 2012.
Eurostat ESTP course on International Trade in Goods Statistics April 2013 Point 2 of the agenda Legal framework for EU trade statistics.
1 FIRST STAGE OF THE HIGHER EDUCATION REFORM IN CROATIA – TASKS OF AUTHORISED BODIES.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
European Developments Transmission Workgroup 1 st December 2011.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial Control Bilateral screening:
1 LAW On Public Finance and Budget and Tax Responsibility; Competences and Roles of Participants of the Budget Process # 181, of July 25, Plenary.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Gas Regional Initiative South South-East
process and procedures for assessments
10 year investment plan ERGEG approach and contribution
PRESENTATION OF MONTENEGRO
GRI-S : Infrastructures The Union list of projects of common interest
20th April 2016 Teleconference
Third package December,
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
KORRR INFORMAL STAKEHOLDER WORKSHOP
Roadmap to Enhanced Technical Regulations of WMO
Guideline prepared by the Veterinary Harmonisation Group
20th April 2016 Teleconference
Survey Imbalance and balance responsibility
Update on European Network Codes
EB Reporting PT David Gerbec EBSG 5th of March 2018.
Update from Balancing Stakeholder Group
37th IG Meeting South Gas Regional Initiative
ENTSO-E Transparency Platform Vision Project
5.c List of priority spatial data sets
20th April 2016 Teleconference
MIG-T meeting, 19th April 2016, Ispra List of priority data sets
Gas balancing – where next
Eurostat – Unit E2 Arturo de la Fuente
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Member States information meeting
William J Wright ,co-chair TT-IP
Legal basis classification
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Commission implementing regulation adopting the specifications of the 2016 AHM on young people on the labour market Agenda point 3 DSS Meeting 29.
MIWP MIWP actions status reports MIG Technical subgroup meeting
Gas Regional Initiative South South-East
INSPIRE Development of Implementing Rules
General update on the status of the NEMOs’ proposals
The Treaty of Lisbon and Administrative Cooperation
Aims to identify a core set of procedures needed to correctly implement the EU Ecolabel Regulation, to build upon the experience and expertise of a selected.
Promoting European works - Challenges and Experiences
ESTP course on International Trade in Goods Statistics
Update developments in Core CCR
Update developments in Core CCR
Item 6 of the Agenda Balance of Payments Working Group 2-3 April 2012
Gas Regional Initiative South South-East
eContentplus 2007 Work Programme
WISE and INSPIRE By Albrecht Wirthmann, GISCO, Eurostat
Presentation transcript:

EB Reporting PT David Gerbec EBSG 5th of March 2018

Legal requirements: GLEB

Legal requirements: GLEB GLEB Art. 63. Monitoring Focus: Monitoring of the implementation and effects of the GLEB. Content of report (at least): Preparation of the European report (Art. 59). Preparation of a report on monitoring of the implementation of GLEB and effect on the harmonisation of applicable rules aimed at facilitating market integration N.B.: same scope than ENTSO-E general monitoring obligations under Art. 8(8) Reg. 714/2009 Preparation monitoring: ENTSO-E to prepare a monitoring plan, for ACER opinion EiF + 6m; 18 June 2018 Data provision for monitoring: ACER (in cooperation with ENTSO-E) will make a list of relevant information to be communicated by ENTSO-E, EiF +12m. (18 December 2018) TSOs and market participants to make data available to ENTSO-E.

Deliverables Which are the deliverables that the GLEB says that PT EB Monitoring needs to prepare? When? European report: Detailed + short Art. 59. 18 June 2020 Draft European report to ACER Art. 59. Not indicated, before submission of European report (at least 2 months for amendments). Manual of procedures Art. 12. EiF + 4 M; 18 April 2018 Monitoring plan Art. 63. EiF + 6 M; 18 June 2018 Report on monitoring of implementation of GLEB (Proposal: to be combined with the European report) Art. 63(1.b). To be defined in the Monitoring plan. Proposal: 18 June 2020 List of information (ACER lead, in cooperation with ENTSO-E) Art. 63.3. EiF + 12 M; 18 December 2018

Draft timeline