Types of Losses in Service industries

Slides:



Advertisements
Similar presentations
Process Excellence L6S The “8 Wastes” Discussion
Advertisements

Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
© 2005 Prentice Hall6-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Selection Sort
Controls and Control Systems
KPIs, Work flow & evaluating performances
Doculogix, LLC. PTS (Project Tracking System) Know your business …stay informed.
6S Simulation - K. Berry 1/29/ S Simulation.
Overview of the Mississippi Legislature’s Efforts to Revitalize Performance Budgeting June 11, 2015.
Overview of Module  Three Programs Waste Data Entry Recipe/Item Waste Report Location Cost Summary/Waste Tracking.
Exercise 1: Communication in RE. Seite 2/X Requirements Engineering Expressing what you mean... „I know you believe you understood what you think I said,
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
ICRI Environmental, Safety and Health Committee ICRI Technical Guideline No Guidelines and Recommendations for Safety in the Concrete Repair.
Revisiting VA in Service Industry
1 Web Commerce Definition Benefits Impacts Other Types of Electronic Commerce.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Lean Production (MUDA)
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Comp 20 - Training & Instructional Design Unit 6 - Assessment This material was developed by Columbia University, funded by the Department of Health and.
Lesson 8.   Part 1: Reading for Information (5 min)  Part 2: Applied Mathematics (10 min)  Part 3: Locating Information (15 min) Total Lesson: 30.
EasyChair Reviewer sign up and bidding Art Hsieh Jean Huang Norik Davtian Ryan Nissenbaum.
4.05 Implement Accounting Procedures To Track Money Flow And To Determine Financial Status. Describe the nature of income statements.
CGQC 8/23/2007 Time Management. CGQC 8/23/2007 Benefits of time management Efficient Successful Healthy.
Communication campaign Most common issues identified: analysis per cost category Antonio Requena Fernández FCH JU Financial Officer.
Accounting for Inventory Merchandise Inventory is typically the largest asset of a merchandising business. Available but no excess Cost of Merchandise.
1 1 Confidential and Proprietary © Copyright OSIsoft, Inc Sigmafine: Providing Reconciled Data to the Business Tom Hosea OSIsoft, Houston, TX.
Assembly Homework #1 Average: Standard deviation: Max: 100 Min: 20.
Selection Sort
 Handling ◦ documentation  Auditing ◦ Coding ◦ Scanning ◦ Final  Cleaning ◦ Excel ◦ Syntax.
Shelve more with less – with Lean Nancy Kress University of Nevada Las Vegas.
1. STARTING POINT Data is an important part of helping State and Local HDs achieve better health outcomes for their constituencies. Currently there appear.
Formal Organizations Unit 3: Socialization. Formal Organizations  We spend most of our lives interacting with secondary groups  Formal organization.
Fitness Testing. Last lesson (Previous Learning) Health Related Fitness Components The Five Components of Health Related Fitness and their definitions.
FY 2007 Street Management - AQIP Street Management Achieving Results by Performing More Effective Street Management Address Quality Improvement Process.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Introduction LEAN Office. Change for the better K A I Z E N = Continuous Improvement Z E N K A I KAIZEN Definition.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Chapter 6: INVENTORY COSTING
Performance Management Done Differently
$ $ $ $ Financial Information Chapter 19
Lecture 08.
The Engineering Design Process
Chapter 6: INVENTORY COSTING
Essentials of UrbanCode Deploy v6.1
Copyright John Wiley & Sons Canada, Ltd.
Services Transportation Construction Retail Finance Wholesale -5.2%
Issue Tracking Systems
Data Analysis Box Plots Industrial Engineering
BIM360 TRACKING General Information
Fishbone- 5 Whys Methods
Chapter 20 Why evaluate the usability of user interface designs?
Decision Making Process & Time Management
Implement expense-control strategies
Changes in Britain as a result of the Industrial Revolution.
PERFORMANCE AND TALENT MANAGEMENT
ZeraWare Safety Software is a sustainable safety management system for managing the core components of a sound safety program. Our user- friendly software.
Modern Technology Warm-Up Pg. 73
OUR MISSION: “To protect and serve the citizens of Conroe and exceed their expectations.”
DEVELOPMENT OF IMPUTATION MODEL FOR SMALL ENTERPRISES
Job Analysis (Pay System Technique for Internal Alignment)
Eight Wastes – DOWNTIME Acronym
Data Collection FREQUENCY DATA BEHAVIOR: BEHAVIOR:
TEST CORRECTION PROCEDURES
Planning and Conducting Data Collection – Structured Observations
Health and Food Technology Understanding Standards event
Search Items In Warehouse
Performance Monitoring and Feedback
Introduction to Lean and Lean Training
Low-fi Prototyping & Testing
Presentation transcript:

Types of Losses in Service industries There are 16 types of losses in service industries Work System Work Time Waiting Time (h/year) Environment (Euro) Search time (h/year) Clarity of Information (h/yr) Interruption (h/year) Unclear Targets (h/year) Information Over (h/year) Technology (h/year) Transportation (h/year) Employee Business Process Creativity ( number) Inventory (h/year) Know How (quality) Handover (h/year) Health (h/year) Work Procedure (h/year) Errors (h/year)

Study of time losses in the office Observed :weekly work time Gross Work Time 40.7 100% Time Losses due to Description H % Rank Min Max Searching For documentation,files,all types of information 1.5 3.7% 4 0.0 10.0 Waiting For IT programs,colleagues,signatures,etc. 5 12.0 Disruption Of the actual work thorugh interruptions 2.5 6.2% 1 11.0 Pursuit Of missing information,colleagues who cannot be reached 1.8 4.5% 3 15.0 Participation In efficient, overly long meeting without Results 2 5.0% 8.0 Sorting out Of excess information,advertising,email,spam,etc 1.2 2.9% 8 13.0 Clarification Of badly delegated,unclear or confusing tasks 1.4 3.5% 6 Correcting Of incorrect,incomplete entries/inputs 3.4% 7 Tracking Of complicated,redundant or bureaucratic process 2.8% 9 Transporting Of papers from and to the copier,post,etc 0.9 2.3% 10 5.0 Total Time Losses 15.4 38% For the actual productive work there is only Net Work Time 25.3 62%

Tractor Component RTU ENO. 9 XXXYYY RTU ENO. 9 AECO xyz 67gh Daressalaam

No Marking Marking

THANK YOU