Military Vehicle Parking Process

Slides:



Advertisements
Similar presentations
The company car that fits in your wallet a real alternative to pool and company cars, taxis or car hire Cars parked in bays across town or in a companys.
Advertisements

New Base Visitor Procedures & RAPID Gates Begins November 1, 2011 All visitors will be properly vetted or personally escorted by a DLA government employee.
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
A WHOLE NEW WAY OF GETTING AROUND car2go: your urban mobility solution.
Presentation Brought to you by: New Thinking. Are your Managers at Risk ? Are Fleet costs to high ?
Advertisement GFD Duties –Plan, coordinate, and direct all activities of the Department –Responsibility for the operation of all phases of the Department.
/8-May-151 Signalling - Safety Step Up System Safety in the delivery of Signalling Projects To be delivered as ‘safety conversational’ and discussed within.
Strabismus Checking System The Team: Lior Barak Omri Mosseri Application Requirements Document.
Benchmarking at Saudi Aramco
Introduction to Computer Technology
1. Outline 4 functions of a typical operating system of a PC(4) Resource management Operating systems organise how to: Load programs from backing storage.
INITIAL OSHA & DOT TRAINING MODULE 10 Security. INITIAL OSHA & DOT TRAINING Module 10 – Security Introduction The Transportation Security Administration.
WORK BASED PROJECT UNIVERSITI TEKNOLOGI MALAYSIA Executive Diploma Programmes.
Aims/Objectives Investigate the proposal for a new system.
Environmental Scrutiny Committee 16 th May 2005 Bill Taylor – Managing Director Urban Vision Partnership Ltd.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Vehicle enters through this gate Vehicle exits through this gate 1. Entering and Exiting the Hire Car Zone.
Matrix Diagram Process Management & Innovation P05.
SAFETY AUDIT AND IMPROVEMENT’S Breckenridge Public Schools.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
Introduction to Enterprise Resource Planning ERP.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Unit 3 Aims/Objectives Investigate the proposal for a new system.
SIGNZ V3.1 Overview Sales Information Systems (NZ) Limited
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Current Problems Manual System More man power involved Pilferage of materials Verification of tonnage & Trips Lack of visibility of vehicle movements.
Managing Motor Fleet Safety Programs: Training for the Safety Director Unit 4 – Employee Injury/Illness Management Programs 0.
Unit 1 Communication and Employability Skills for IT 1.
Lim Sei cK. Interpersonal Skills In this section, we will discuss the skills you need to relate with others. “No man is an island.” This is very.
2. Submit laboratory booking form Requestor (external/internal) Manager/ Lab Engineer/ Technical Assistant/ Technician 5. Requestor to Propose a new date.
Submitted by the expert from Japan the secretariat
New Employee Orientation
We always have time to work safely
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Essentials of UrbanCode Deploy v6.1 QQ147
Presented at the 46th Annual NRMCA Business Administration Conference
AIRCRAFT MAINTENANCE TOWING OF AIRCRAFT.
Regional Skills Forum 2016:
Laboratory development of an autonomic parking management system
Post Trip Inspection (Delivery)
Lean Six Sigma DMAIC Improvement Story
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
Lean Six Sigma DMAIC Improvement Story
Alignment of COBIT to Botswana IT Audit Methodology
Highlights for Readers.
ILM Assignment Criteria
Mealy Mountain Hawks SOAR
Student name Student ID Degree program
Occupational Road Safety
ECOMM 2014 Mobility management as a tool for facilitating cycling in the sector of home care (cleaning services and family care) TRAJECT Katrien Backx.
eVoting System Proposal
FACULTIES LAB BOOKING AND KEY MANAGEMENT
SUSPICIOUS ACTIVITY DETECTION
ETRTO proposal for UN R30 & 64 amendments Extended Mobility Tyres
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
HSE Tips for Site / Field Visit
Bruce Riordan Joint Policy Committee Bay Area Climate Adaptation Overview.
MOT Training for Incident Responders in Florida
Overview of Course Assessment National 3
Note on GNI reservations
Experience Gained in Road Safety in Implementing Safer Surfacings
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Enrollment Counts.
AIMS Equipment & Automation monitoring solution
Code of Practice for Access & Working Scaffolds
CMPE/SE 131 Software Engineering February 21 Class Meeting
Student Name (VU ID…) MS in ………..
WP3 - T3.3 presentation What the passenger really wants:
Ashley Baquero Consultant Office of Charter Schools
Enrollment Counts.
Presentation transcript:

Military Vehicle Parking Process Process Management & Innovation P05 Process Improvement Project

Introduction Military Vehicle Parking Process Stakeholders: How do we know about it? Stakeholders: Driver Detail clerk Officer Process Improvement Project

- Reduce the Cycle Time - Objectives Efficiency in the work of the detail clerk. Allow the driver to have more resting time. - Reduce the Cycle Time - Process Improvement Project

Military Vehicle Parking Process 2. Proceed to multi-storey parking area 3. Find parking lot 1. Security check at gate 4. Park vehicle 1540s 300s 180s 6. Walking back to company line 5. Last parade task 7. Register in logbook Total cycle time = 2980s Process Improvement Project

Military Vehicle Parking Process 1. Receive logbook 10s RVA = 600s 2. Ensuring information clearly written in logbook BVA = 340s 20s NVA = 600s Register in logbook Total cycle time = 1540s 3. Go to parking area 300s 4. Checking the vehicle 600s Cycle time efficiency = 600 / 1540 = 0.340 5. Walk back to company line 300s 6. Pass logbook to Officer for verification 300s Real value-added Business value-added 7. Book in key and logbook 10s Non-value-added Process Improvement Project

Pareto Chart on Registering Activities Checking the vehicle Time (s) Go to parking area Walk back to company line Pass logbook to Officer for verification Activity Process Improvement Project

Main Causes for Long Cycle Time Man Difficulty in finding Officer Long time taken in Military Vehicle Parking Process “Heck care” attitude of Officer Many meetings Long walking time Finding parking lot Stringent vehicle check Long distance between company line and parking area No numbering For maintenance & damages For safety purposes Environment Methods Process Improvement Project

Efficiency Worksheet (Cycle time in seconds) NO. ACTIVITY PERFORMANCE EXPECT GAP TARGET 3) Find parking lot 180 60 120 90 6) Walking to company line 300 7.3) Go to parking area 7.5) 7.7) Pass logbook to Officer for verification 240 (Cycle time in seconds) Process Improvement Project

Target Setting Time (s) Target reduction of 29.19% Reduction of 6.64% 2980 2260 2110 Process Improvement Project

Recommendations Changing of checking area on vehicle Checking area: Loading/ Unloading bay Reduce the walking time to and fro the parking area Assign duty officer for verification To be stationed at the company line Reduce the time taken to locate the officer Process Improvement Project

Recommendations (cont.) Assign numbers to the parking lots & Assign the vehicle to a fixed parking lot Easy & direct access for the driver Reduce the finding time on parking lot 01 02 Process Improvement Project

Proposed System 180s 150s 120s 1. Security check at gate 2. Proceed to company line loading (Unloading bay) 3. Pass and return of logbook 90s 150s 600s 5. Proceed to parking area 4. Checking of vehicle 6. Finding parking lot 10s 300s 300s 9. Submit key and logbook to detail clerk RVA = 1380s, BVA = 260s, NVA = 390s 8. Walk back to company line 7. Park vehicle 10s 120s Total cycle time = 2030s 11. Book in key and logbook 10. Pass logbook to officer to sign Process Improvement Project

Before and After Implementation Time (s) Process Improvement Project

Conclusion Overview of our approach Main causes of long cycle time: Difficulty in finding Officer Long walking time Finding parking lot Stringent vehicle check Process Improvement Project

Conclusion (cont.) Proposed system Reduction of time by 31.88% (from 2980 to 2030s) Cycle time efficiency = 0.680 (Previous: 0.523) 19.21% 12.81% Real value-added 67.98% Business value-added Non-value-added Process Improvement Project

Members Involved: Sau Wen, Nick, Kelvin, Yong Shu Diploma in BZE Thank You End of Presentation Members Involved: Sau Wen, Nick, Kelvin, Yong Shu Diploma in BZE Process Improvement Project