The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.

Slides:



Advertisements
Similar presentations
Drive-Up Appeal Shrubs & trees Landscaping Front door Outside paint.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
Beyond Luxuries….Theres Bliss. Tower of Faith, Luxury Apartments Situated near Suburban Club, Seaport Airport Road, Kakkanad is a collection of 171 Apartments.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
Planning the Service Area
Architecture CAD living sleeping service SPACE PLANNING
DECEMBER 7, 2011 HOUSING DECISIONS. AGENDA Review Decision Making Model Vocabulary Marketing strategies that affect our spending Housing alternatives.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
EUR 147,000 2 nd floor of 6 story building, 90 M2 3 room apartment on Mill Street 31, Riga, Center 3 bedroom apartment in the quiet Riga center. Autonomous.
©2015 Mark Hamberg. All rights reserved.. A Town House In The Country Located in the picturesque village of Phinikaria, only fifteen minute’s drive.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Site Plan Community Amenities Controlled access entry gates One-car detached garages with remote control door openers Individual storage rooms.
My house has two floors, I live on one floors, it’s has one garden and one garage, It’s has four windows.
Civil Engineering & Architecture 2.3 Residential Design.
Construction Project Michael J. Bruno Bruno Construction Management.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
BATHS. Function The bath must be planned to be functional, attractive, and easily maintained. May also contain dressing, laundering, exercising, and sunning.
ACT-ADDII-1: Students will prepare electrical plans a) Understand general codes related to electrical plans.
Lesson 21.1 Housing Decisions
Residential Architectural Plans
3.0.0 – Service Area. Service Area:  Kitchens – (Types and Layouts) Kitchens – (Types and Layouts)  Bathrooms / Powder Rooms Bathrooms / Powder Rooms.
Creating a New Housing Development Mr. Watkins 2011.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
Housing Value, Costs, and Measures of Physical Adequacy American Housing Survey User Conference March 8, 2011 Paul Emrath VP-Survey and Housing Policy.
ARCHITECTURAL DESIGN Residential Architectural Plans 1 Copyright © Texas Education Agency, All rights reserved.
20513 Lochmoor Southwest Corner of 8 mile and Harper, see map on last slide A beautiful 3 or 4 bedroom bungalow with dining room, living room, den/study,
Building Codes and Interior Design
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
46 West Trace Creek The Woodlands, Texas. Front view of home.
Smrha-Monroe Family Pictures of the House August 2005.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
By: Tiilene Barber & Carman Dorsey. $219,777 ( MORTAGE ) 5 BEDROOMS, 4 BATHS, 0.14 Acres $13, ( this times.06) $ 232,963.62( this is for when u.
If you having trouble getting approved. If you have to move a.s.a.p. If you have bad credit or no credit. If you have a large pet or an aggressive bread.
House Project.
Presents 33 C O L C H E S T E R RO A D W e s t o n, M a s s a c h u s e t t s 13 Room Colonial with 5 Bedrooms, 4 Baths, 2 ½ Baths,
White Pigeon Community Schools
24172 Vista D Oro, Dana Point CA 92629
Children’s Section of the Library Entrance lobby from Main Street looking east.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Introducing the Dakota 28483D
Capital Projects Requests
24 Yacht Harbor Court MLS# ~ $1,199,000
Features, Renovations and Improvements
Amazing Natural Light & Great Outdoor Living
Electrical Gas Plumbing Heating & Cooling
Laurel Canyon Apartments
Lake City Equestrian tp://.
ISA Prime Developments
Logans Bridge Cottage.
Designing the tiny house
Boulevard PROFESSIONAL CENTER
2018 Bond Review and Proposal
Building & Property Committee
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Floor Plans and Symbols
Stoughton Public Library
FARR’S BUILDING APARTMENTS
Presentation transcript:

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.

Front of existing buildings before redevelopment Condition: failing roofs, asbestos in glazing, broken windows, structural cracking. Porch overhangs are deteriorated. The property lacks landscaping.

Rear of existing buildings before redevelopment Condition: buildings in total disrepair. There is no central heat, air, minimal electric, major plumbing problems, broken windows, damaged doors, concrete patches on walls and no life safety equipment.

Existing Exterior Conditions Conditions: note overhead and exterior cabling and wires throughout. Unsightly clothes lines, poor landscaping, parking issues.

Existing typical bathroom Conditions: No showers, lead paint, dated fixtures, significant plumbing problems, asbestos floor tile. Poor layout of floor plan.

Typical kitchen before redevelopment Conditions: Cabinetry in disrepair, fixtures dated. No amenities. Stoves & refrigerators rented by the month. Asbestos in glue under sink, and flooring.

Typical living room before redevelopment Conditions: Lead paint, peeling paint, brittle electric wiring, minimal outlets, gas heat connection, but no heat unit, asbestos flooring. The walls are cracking showing structural settlement.

After redevelopment – Amenities: New management and leasing office, Make A Difference Center with computer lab, library, playground for childrens after school program& one of two new laundry facilities.

New front exterior elevation Includes lathe building system for new exterior skin of walls, replaced windows, doors, added columns, shutters, redesigned front entry and installed fire alarm system

1952 construction- after redevelopment Changed profile of buildings by adding pavilions wrapped in hardi-board with raised roofs. Adopted neighborhood Caribbean theme depicted in design and paint colors.

After redevelopment site work Installed parking lot lighting, removed overhead electrical lines, installed new irrigation system, grass, trees, mulch and shrubbery.

1952 construction – rear area of buildings A completely new look! Created open green space with oak trees and shrubbery. We installed barbecue areas with picnic tables and bike racks.

The New Greenwood Apartments Installed monument signage, decorative wrought iron fencing between all buildings. We created an identity for the property.

The new bathroom after redevelopment All new plumbing pipes, tile walls, showers! Redesigned floor plan. Installed cabinetry, flooring and all new fixtures.

A new bedroom N ewly sheet rocked walls, replaced all electrical wiring and installed central heat and air. We installed ceiling fans, TV and phone cabling, interior doors, closet shelving

New kitchen after construction We improved the floor plan. In the kitchen we installed Whirlpool garbage disposals, dishwashers, stoves w/self cleaning ovens and stove hoods for proper ventilation. The refrigerators have ice makers!

New kitchen after construction All kitchens now have phone cabling, all new electrical and plumbing, and new walls. We installed new window treatments, counters and cabinetry and flooring. We have encapsulated lead paint and removed asbestos.

The Greenwood Apartments Redevelopment A $14,277,000+ redevelopment 7 sources of funding including local bonds, tax credits, city and county loans, equity and grants A partnership involving for profit, nonprofit and governmental partnering A redevelopment of 25 buildings (200 units) that are more than 50 years old and in significant disrepair Included retention of 90 families on site during construction Construction achieved in four phases during a 14 month period