THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Grade Separation (GS-16) Project. Project Location - Bensenville N.
Measurement for Civil Engineering works
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
PCI Northeast Bridge Technical Committee Standards for Accelerated Bridge Construction Including the Northeast Extreme Tee (NEXT) Michael P. Culmo, P.E.,
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Chapter 34 Bridge Construction.
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
Totally Precast Concrete Bridges
Material Supply Capacity in the Road Sector Aggregate Producers Perspective May 2006 Alex Hall General Manager Holcim Aggregate and Readymix (KZN)
Innovating in a compact environment
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Other Construction Projects
Highways/BridgesHighways/Bridges American Bar Association Forum on the Construction Industry American Bar Association Forum on the Construction Industry.
Roads And Bridges Development Corporation of Kerala LTD
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Socio Economic Development.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
Partnership.tenacity.enjoyment.care New Zealand Airfield Pavement Surface Types – Evaluation, Design, Maintenance and Rehabilitation John Marsh General.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Research Institute for the Built and Human Environment Do ontological assumptions affect managerial and professional reasoning? Some.
ROB at Koratty in lieu of LC No.54 Progress as on
Milford Haven Bridge Disaster
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
by Daniel Govender (AMSAICE) Project Manager in Training (ARE)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Abigroup Contractors Stanley Street Plaza, Southbank Ph: Web: Simon Gibson – HR Officer Evan Maughan – L&D Officer.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
PROJECT PROFILE REPORTS FOR DOE & DOH PROJECTS UNDER AMAJUBA DISTRICT IN MIDLANDS REGION 01 February 2012.
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
NAME OF PROJECT: Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
NORTHERN URBAN HIGHWAY MEXICO CITY
Totally Precast Concrete Bridges
Bridge disasters.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Offsite manufactured Bridges
Town Road Improvement Project Communication Plan
The South African National Roads Agency SOC Ltd
Using project records to show delay and disruption
Construction Examples in Japan High Capacity Micropile
ROB at Pulianam Progress as on
A New Precast, Pre-stressed Bridge Deck System
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
COST PLANNING AND ESTIMATION
CONSTRUCTION METHODS & TECHNOLOGY
Course Contents Culverts Bridges Buildings 20 November 2018.
WE-WC Almaty – Khorgos Road Section Materials prepared in %
Western Europe – Western China motor road “Almaty-Khorgos”
Totally Precast Concrete Bridges
Construction Engineering and Management National Central University
DEPARTMENT OF POLICE, ROADS AND TRANSPORT TRANSPORT INFRASTRUCTURE
Surface Treatments #1.
BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
Presentation transcript:

THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT NUMBER: NRA N002-289-2012/1 CLIENT: SOUTH AFRICAN NATIONAL ROADS AGENCY SOC LIMITED CONSULTANT: UWP CONSULTING (PTY) LTD CONTRACTOR: CONCOR INFRASTRUCTURE PRESENTED BY: STEWART WILSON (RESIDENT ENGINEER)

OVERVIEW OF THE CONTRACT Went to tender: Design (2010) Construction (September 2015) Tender Awarded: December 2015 Handover of project to contractor: February 2016 Project completion date: March 2019 Contract Duration: 37 months Total CPG Target: 18% Estimated Contract Value: R900 million

PAVEMENT DESIGN FOR THE NEW CARRIAGEWAY Surfacing: 20mm UTFC 40mm Continuously graded asphalt wearing course Basecourse: 80mm Asphalt Basecourse (BC3) Upper Subbase: 150mm C3 Stabilised Crushed Gravel Lower Subbase: 150mm C3 Stabilised Crushed Gravel Upper Selected Layer: 150mm G7 Natural Gravel Lower Selected Layer: 150mm G9 Natural Gravel

CONTRACT PARTICIPATION GOALS Targets Achieved Target Area Labour 6% 6,36% 352/494 SCD 12% 7,9% 19/29 Total 18% 14,26%

TRAINING Students: 4 interns with contractor 4 interns with engineer 1 OHS intern 12 ‘go for gold ‘ students Programme Generic (R25 000) NQF 3(R250 000) NQF 4 (R235 000) SMME (R190 000) Progress 6 of 8 Modules – R336 625

RIVER BRIDGES Mlalazi River Bridge (B1085A) Four span structure with 29.5m long spans Simply supported precast, prestressed concrete beam deck and 3 internal wall type piers Using a combination of pad type footings and 32 x 900mm diameter bored piles, ranging in depths from 16m to 23m

RIVER BRIDGES Umhlathuze River Bridge (B484A) Eight span structure with 29m long spans Simply supported prestressed beam and slab deck construction with 7 internal wall type piers Piers founded on 70 x 900mm diameter bored piles to depths between 45m to 62m

OVERPASSES & UNDERPASSES Ridge Bridge (B1416) Windy Ridge Bridge (1086) Port Durnford Bridge 1 (B1087) Mzingwenya Agricultural Overpass (B1090) Underpasses Port Durnford Bridge 2 (B1088A) Sugar Mill Bridge (B485) CFA Piling at Mzingwenya Overpass Mzingwenya Overpass Removing Jackspan

MAJOR BOX CULVERTS 16 Major box culverts with numerous smaller box culverts that require lengthening

FACTS AND QUANTITIES Mass of reinforced concrete Major Structures: 11500 m3 (28 750 tons) Minor Structures: 5 000 m3 (12 500 tons) Total mass of reinforced concrete: 16 500 m3 Length of piles 600mm diameter CFA piles: 0.38 Km 900mm diameter bored piles: 4. 36 Km Total length of piles: 4.74 Km Mass earthworks: 900 000 m3 Asphalt to be paved: 90 000 tons