Quality Assurance Work Load.

Slides:



Advertisements
Similar presentations
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Advertisements

1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Management: Analysis and Decision Making
Organization & Supervision. Daily Work Schedules General Consideration: A work schedule must make the maximum use of the human recourses available and.
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
Calculating & Reporting Healthcare Statistics
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Principles of Budgeting. Learning Objectives Discuss concepts of budgeting. Identify examples of budget-planning steps. Identify examples of stages of.
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Microbiology and Serology
Overview of Cambodia Laboratory System & Organizational work flow Structure Dr. Lek Dysoley CNM 8-12 April, 2013.
Module 10: Understanding Laboratory Data *Image courtesy of: World Lung Foundation.
Call Center Terminologies
Personnel. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety The.
Indirect Cost Rate Tool District/Charter School Application submitted through 2014 Audsum By Patricia Lagarenne
Component 2: The Culture of Health Care Unit 3: Health Care Settings— The Places Where Care Is Delivered Lecture 3 This material was developed by Oregon.
POD PLANNING GUIDE. INTRODUCTION This guide is intended to be a simplified step-by- step guide through the process of planning a Point of Dispensing (POD)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
QUALITY ASSURANCE Reference Intervals Lecture 4. Normal range or Reference interval The term ‘normal range’ is commonly used when referring to the range.
Module 5: Assuring the Quality of HIV Rapid Testing
Part III: Tools to Analyze Financial Operations
1. Infection Control Risk Assessment Terrie B. Lee, RN, MS, MPH, CIC Director, Infection Prevention & Employee Health Charleston Area Medical Center Charleston,
1 Module OVERVIEW OF EXTERNAL QUALITY ASSESSMENT.
Manpower Planning.
Medical Laboratory Diagnostic Services Careers. Medical Lab Careers Medical Lab careers include: Phlebotomy technician Phlebotomy technician Medical laboratory.
By Vickie Kirkley, RN. Director of Materials Management/ Central Supply/ Central Sterile Job Requirements Career / Job Requirements Bachelor of Science.
Fifth Annual President’s Emergency Plan for AIDS Relief Track 1.0 ART Program Meeting September , 2007 Thomas J. Spira, M.D. International Laboratory.
BMW Thailand V5-JT-1/ Ingo Reitz Seminar Service Manager Feb Page 1 BMW Group Thailand Management and Service Report Seminar for Service Manager.
1 ON-SITE SUPERVISION – CHECKLISTS. 2 Checklists Serve as documentation of the visit and record of current conditions and actions needed Help carrying.
Fiscal Planning (Budgeting). Fiscal Planning Fiscal planning is not intuitive; it is a learned skill that improves with practice. Fiscal planning requires.
Tracking Productivity at Kodak’s Technical Support Center Heidi Huber John Rosenbaum Amy Stokes.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
TUBERCULOSIS LABORATORY NETWORK - UGANDA Dr. Achilles Katamba Zone TB/Leprosy Supervisor, Kampala City.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Regulatory Issues in Laboratory Management
HELWAN UNIVERSITY Faculty of engineering Biomedical department Hospitals Organization and administrative structure :Presented by : Sara Mousa Ismail Dr\Mohammed.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Staff data Classification Qualifications Space Utilisation
Quality Assurance.
OH&S Management System
Personnel.
Quality Assurance Procedure Manuals.
laboratory management
Roles and responsibilities PM
Monitoring and Evaluation: A Review of Terms
Are you Ready for a Survey? Volunteer Managers
ISO/IEC
The Office Today.
Quality Assurance in the clinical laboratory
Shopper Traffic Case Study:
Instrument Maintenance
Clinical Engineering Lecture (3).
OH&S Management System
Auditing & Investigations I
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
Complying With CLIA Competency Requirements
Career, Technical and Adult Education Finances
Labour accounts THE CONTRACTOR IS ACTING UNDER A FRAMEWORK CONTRACT CONCLUDED WITH THE COMMISSION.
Systems Analysis and Design
Quality Assurance Reference Intervals.
Quality Assurance Documentation
Planning, Organizing, Staffing
Time Studies Involves timing a sample of a worker’s performance and using it to set a standard Requires trained and experienced observers Cannot be set.
FISCAL PLANNING BUDGETS.
Introduction To Medical Technology
CITY OF WINDOM POSITION DESCRIPTION Position Title:
FISCAL PLANNING " BUDGETS "
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Monitoring and Evaluation: A Review of Terms
Presentation transcript:

Quality Assurance Work Load

Introduction Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure by its unit value expressed in units (minutes) Individual workloads for procedures are accumulated to obtain the total workload for laboratories, laboratory sections, shifts, etc. When discussing workload one has to consider a number of points, for example: how much work the laboratory does, whether the staffing level is adequate, whether the laboratory needs expensive equipment, whether the laboratory is working efficiently

Using the Number of Tests is not Accurate Traditionally, the activity of the laboratory has been expressed by total number of tests achieved for a given period of time (raw count). This method does not take into account complexity which varies greatly from test to test and subsequently the specific time required to perform any test.

Using the Number of Tests is not Accurate Type of Test No. of Tests Stool parasites 100 Gram Stain 30 Hemoglobin 50 Differential Count 70 Blood grouping 40 Blood glucose 210 Total Tests 500 Cost per test = Total operational cost/ Total Tests = 4070 US$ / 500 = 8.14 US$ per test

one minute of productive technical, clerical and assistant time Workload Unit Method This is a standardized counting method for measuring technical workload in a consistent manner 1 work unit = one minute of productive technical, clerical and assistant time

Unit Value Per Procedure Unit value per procedure, more often referred to as unit value (UV) It is the mean number of units involved in performing all activities required to complete the defined procedure once It includes the time required for: Initial handling of the specimen includes all activities related to the specimen once it reaches the laboratory All steps involved in specimen testing Does not include incubation or centrifugation time Recording and reporting Includes calculating, entering results in the computer, checking and filing the final report, telephone calls for reporting results are also included

Unit Value Per Procedure Daily and routine preparation of reagents, preparing standards, diluting quality control vials, instrument cleaning, warm-up and calibration Maintenance and repair Includes regular weekly or monthly preventive maintenance, emergency repairs, time spent in identifying defective reagents Does not include major breakdowns Solution preparation Glassware wash up Includes washing, drying and sterilization Technical supervision Standards, quality control, and repeats are counted as tests and are included in the raw count Unit value per procedure does not include specimen collection

Unit Value Per Procedure Workload value (WLV) = (Minutes) (or Work load Unit “WLU”) Raw count for each procedure X its unit value (UV)

How is UV determined? Time Study A surveyor actually uses a stopwatch and times the procedure being done in the laboratory The watch is started at the beginning of the first step of the procedure and continues throughout its entire cycle Step endings and delays are noted as they occur The procedure is broken down into steps Each step must be outlined in detail, and must have identifiable beginning and ending points The sum of the steps must be equal to the total cycle of the process

How is UV determined? Time Study The procedure is performed in the same way as it is dealt with under routine conditions For example, individually or in batches, with different technologists These surveys are sent to coordinators by whom surveys are evaluated, using 10 different laboratories, before a permanent unit is acquired The following Table represent UV for different tests These units have proved to be applicable in some countries of the Eastern Mediterranean Region

Unit Values for different Tests Type of Test No. of Tests Unit Value Total Unit value (Total WLU) Stool parasites 100 10 1000 Gram Stain 30 3 90 Hemoglobin 50 5 250 Differential Count 70 11 770 Blood grouping 40 7 280 Blood glucose 210 8 1680 Total tests 500 4070 Cost per WLU = Total operational cost/ Total WLUs = 4070 US$ / 4070 = 1 US$ per WLU Cost per Differential count = 1 X 11 = 11 US$ per test

Productivity Productivity measures how efficient the laboratory does the work It is expressed in terms of output per man-hour One man-hour is the expenditure of one hour of time on the job by one person regardless of the output Productivity = Output / man-hour = total WLUs / total available man-hours When considering man-hours, all personnel in the laboratory must be included. Man-hours are of three types: paid man-hour, worked paid hour and actual worked hour

Paid man-hours leading to Paid Productivity This is represented by the ratio of workload units to total technical, clerical and assistant time in hours, for which laboratory employees are being paid, whether or not the employees are on site It determines cost-effective use of personnel It identifies the overall productivity of all employee resources dealing with the laboratory workload

Paid man-hours leading to Paid Productivity Paid productivity (units/hour) = Total WLUs / year Total Paid hours / year If one health center laboratory employs one laboratory assistant or full time equivalent and produces a total of 37319 WLUs annually, what is the paid productivity? Total paid time = (7 hours/day) X (5.5 days/week) X (52 weeks/year) = 2002 hours Paid Productivity = (WLUs per year) / (Total paid hours per year) = 37319 / 2002 = 18.6 ~ 19 WLUs / hour

total paid man-hours not worked Worked Productivity Worked productivity (units/hour) = Total WLUs / year Worked man hours/ year Worked man hours = total paid man-hours – total paid man-hours not worked Paid man-hours not worked are: Vacation Official holidays Sick leave

Worked Productivity

Total actual worked hours = paid hours devoted to untimed activities Actual Productivity Actual productivity is based on actual worked hours It is useful to assess the impact of non-workload activity on the laboratory’s productivity Total actual worked hours = total worked hours – paid hours devoted to untimed activities Untimed activities include: Breaks (coffee breaks, prayers, etc.), laboratory administrative duties, prayers (Islamic countries), training others, ordering and inventory of supply, preparing monthly activity reports, staff meetings

Actual Productivity

Efficiency of productivity expressed as a percentage The median productivity will vary according to the local working facilities of the environment of the laboratory Some believe that the actual average of normal productivity ranges between 35 and 45 minutes of every paid hour

Personnel forecasting via workload recording Following a visit to the health center laboratory, the director of local health laboratory services informed the chief medical officer of the health center that the efficiency of the laboratory rated at 45% i.e. only 27 minutes out of 60 were occupied (or worked) It was thus decided to improve productivity through decentralization and integration of Ziehl Nielsen (ZN) stain and microscopic examinations of malaria smears (actually done at the regional laboratory) in the health center laboratory It was also decided to establish a local standard of productivity for this laboratory, based on experience and knowledge of local conditions

Number of specimens/year = Work-out estimation Tuberculosis case finding: It is estimated that there are an average of 15 outpatients per month requiring sputum examination by Ziehl Nielsen (ZN) smear microscopic examinations, to enable a decision as to whether the patient must be referred to a tuberculosis center for further investigation Follow up of patients under treatment: requiring an average of 25 smears per month and 300 total WLUs / year 1 ZN smear examination = 12 WLUs Total WLU = 540 + 300 = 840 smears X 12 = 10018 WLUs/y Number of specimens/year = 15x3 specimen/patient X 12 months = 540

Work-out estimation Malaria case finding It has been estimated that, of the total population of the subdistrict, 15 000 will be screened as part of the malaria control program 1 malaria smear thick and thin microscopic examination = 12 WLUs Total WLUs/year = 15000 x 12 WLUs = 180000 Existing current WL 37500 Tuberculosis case finding & follow up 10018 Malaria active screening 180000 Total (WLUs/ year 227518 Manpower required Actual man-hours available/year = 1389 hours Convert to minutes = 1389 X 60 = 83340 minutes Number of full time Lab. Personnel = 227518 / 83340 2.73 ~ 3

Work-out estimation If two additional laboratory technicians are recruited to deal with the new workload the efficiency will be: Actual productivity = 227518 = 54 1389 X 3 Efficiency = 54 X 100 60 = 90%

Laboratory Work Based on observations made in other laboratories the director of local laboratory services considered that reasonable productivity target for the health center laboratory might be an actual man-hour productivity of 50 units/ hour How much malaria laboratory work could be undertaken by the health center laboratory with one laboratory technician

Laboratory Work Productivity = Total WLUs FTE X hours per FTE Productivity X FTE X hours per FTE = 50 X 1 X 1389 69450 WLUs available for malaria = 69450 - 47518 = 21932 Full time laboratory technician or any full time equivalent (FTE) No. of malaria smears = 21932 = 1827 smear 12