MCC@CAT: An in-depth analysis of applying engineering education to a professional environment. Reagan Hughes, Courtney McCreary, Aldo Perez, Christopher.

Slides:



Advertisements
Similar presentations
Project quality management Cody Ronning 3/23/2015.
Advertisements

INDUSTRIAL & SYSTEMS ENGINEERING
Engineering and Technology Management A program in technical decision making and leadership for engineering and business professionals.
What’s behind the amazing light show and the booming wall of sound? Energy. Energy is all around us but have you ever considered a career in energy?
Operations and Supply Chain Strategies
Providing Safe, Secure Cargo Protection and Transportation Standards American Energy Cargo Container Association
Industrial Engineering Roles IIE-IAB, November 2006.
Industrial Engineering Roles In Industry
Decision Making Matrix
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Founder: Benjamin Holt Daniel Best Date: April 15, 1925 Where: California History: 90 years.
Unit 3 Aims/Objectives Investigate the proposal for a new system.
Facility Consolidation Proposal IEM 5121 July 21, 2003 Robert Volk.
Overview ENGINUITY Copyright Virtual Management Simulations.
B U I L D I N G C O N S T R U C T I O N P R O D U C T S 1 Caterpillar Clayton Assembly Pre-Apprentice Program.
Industrial and Manufacturing Engineering JACLYN VANGILDER LAURA PAZ VINCENT ISOPI.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
This quick guide is designed to provide a suggestive, real-world structure on how to coordinate and conquer any marketing, sales, or service related project.
Future City Orientation Laura Lorenzo, PMP President ; PMI-SVC.
Operations and Supply Chain Strategies
Introduction to Motion and Time Study
Design and modeling 10 step design process
Ten-Stage Design Process
Introduction to Methods Engineering
GTS Global Training Services Michigan Ave. Suite 220 B
UNIT – V BUSINESS ANALYTICS
Ten-Stage Design Process
MSCI Professional Development for the Metals Industry
Systems Design: Activity Based Costing
2 Selecting a Healthcare Information System.
Operations Management Dr. Aravind Banakar –
OPS 571 Competitive Success/snaptutorial.com
OPS 571 Education for Service-- snaptutorial.com.
OPS 571 Enthusiastic Studysnaptutorial.com
OPS 571 GENIUS Lessons in Excellence-- ops571genius.com.
UOPOPS571 Lessons in Excellence--uopops571.com
OPS 571 Education for Service/snaptutorial.com
OPS 571 Teaching Effectively-- snaptutorial.com
OPS 571 GENIUS Education for Service-- ops571genius.com.
OPS 571 HELP Education for Service-- ops571help.com.
UOPOPS 571 Education for Service-- uopops571.com.
Evaluating Digital Learning Implementation with the CWiC Framework
Sam Houston Electric Cooperative – Prophix story
Decision Making Matrix
Development of an Emergency Medical Service Rover (EMSR): Phases 1 and 2 Victoria LaBarre, Elijah Espinoza, Dr. April Andreas, Paulina Sidwell, Larry.
Fig. 2: Internal Components
COVER.
Overview Food & Drink Manufacturing Qualification
Evaluating Wind Turbine Placement using Geographic Information Systems (GIS) Tools Manuel Silva Jr, Graduate Mentor: Francisco Haces, Faculty Advisor:
An Energy Distribution Model Analysis Using Smart Grid Solution Md Amanullah Kabir, Jiang Zhou   Department of Mechanical Engineering, Lamar University.
Conference Calls & Presentations Peer-to-peer collaboration
Human Resources Management: Module 2
CASCADE Peer Mentoring to Improve Engineering Retention and Graduation Rates of Undergraduate Students in a Minority Serving Institution Swapnil Thaker.
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
Adaptive Control Method for Seismic Response Attenuation Omar A. S
Global and Chinese Electric Hoist Industry, 2018 Market Research Report View Complete
Improvement of Senior Design Capstones by Extending their Lengths and Scopes Ramez Hajj  The University of Texas- Austin 301 E Dean Keeton St, Austin,
Feasibility of Using Simple Adaptive Control Strategy for Dynamic Bridge Response Under Stiffness Variation. Rachel W. Soares, Luciana R. Barroso, Omar.
Global and Chinese Telephoto Zoom Lens Industry, 2018 Market Research Report View Complete
BUILDING WHAT MATTERS BUILDING WHAT MATTERS. SNC-Lavalin is a company built on delivering innovative engineering solutions for complex projects around.
Measuring the Impact of Utilizing Undergraduate Teaching Assistants in the Classroom on Student Success in a First-Year Engineering Course Poria Dorali1.
Introduction to Mechanical Engineering
COVER.
Class Project Guidelines
Systems Design: Activity Based Costing
IED Product Management Day #2
Chapter 6 The Master Budget and Responsibility accounting
INDUSTRIAL ENGINEERING
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

MCC@CAT: An in-depth analysis of applying engineering education to a professional environment. Reagan Hughes, Courtney McCreary, Aldo Perez, Christopher Sorensen, Brandon Trout, Bradley Ward   McLennan Community College, Students 1400 College Drive Waco, Texas 76708 E-mail: bw0132652@students.mclennan.edu Abstract As an academic co-operative, McLennan Community College and Caterpillar Operations Waco have allowed 6 engineering students of mechanical and electrical disciplines to analyze and determine a solution for increasing the safety, quality, and efficiency of excavator bucket production. This academic cooperative is a strong opportunity for college students to take skills learned via academia and mix them with work experience that can only be learned in a professional environment, providing students with a unique skill set that will allow them to stand out in the job market. 1. Introduction In 1925, the Holt Manufacturing Company and C. L. Best Tractor Co. merged together to form the Caterpillar Tractor Co [1]. Since then, Caterpillar has gone on to innovate the heavy machinery industry and helped to create some modern marvels such as the Hoover Dam and the Golden Gate Bridge [1]. Caterpillar machinery were also used in the construction of over 70,000 miles of highways throughout the United States [1]. Caterpillar has since been recognized as a Fortune 500 Company, ranking #74 on the list [3]. In addition, Caterpillar ranks #264 on the Fortune Global 500 [2] and #47 on Fortune’s World’s Most Admired Companies [4]. 2. Opportunities The opportunity for improvement that was investigated by Caterpillar Operations Waco was the time and effort it takes to change out fixtures that are used in the production of excavator buckets. The changeover process was creating an unnecessary time constraint on the overall daily production. MCC students were assigned to design and develop a new process that would help improve the changeover time, and, consequently, excavator bucket production. MCC engineering students were also tasked with researching financial data to help justify the cost of implementation and materials needed. Well-defined in-scope and out-of-scope parameters helped guide students’ thought processes and decision making throughout the project. 3. Safety and Finances Two major portions of the research involved with the engineering co-op were investigating the financial feasibility of the proposal and identifying key safety and ergonomic risks, while improving the speed and productivity of the change over process. The financial analysis was created by using a combination of data gathered through time studies, in-house financial data such as cost per man-hour and profit from increased production, and quoting material and labor costs from third-party sources. Key safety issues observed during the existing change over process were pinch and trip hazards as well as a risk for head injuries. The major ergonomic issues present were bending down multiple times to fasten the fixture and twisting, pushing, and turning to transport the 1500-2800lb fixtures with an overhead crane. 4. PQVC PQVC is an analysis tool that was learned in-house from senior management at Caterpillar Operations Waco. It helps in understanding and visualizing a single proposal’s merits and weaknesses [5]. It is shown in Figure 1. 5. Pugh Matrix Another analysis tool that was learned during the co-op was the Pugh matrix, as seen in Figure 2. This tool is a criteria-based matrix that is part of Six Sigma, a methodology used to improve business processes by utilizing statistical analysis [6][7]. This tool helps engineers determine weighted values for certain criteria and generates a clear picture of a solution’s strengths and weaknesses against other possible solutions and the baseline, or existing, solution [6]. 6. Conclusions In conclusion, the cooperative between McLennan Community College and Caterpillar Operations Waco has been an excellent opportunity for engineering students to gain valuable experience from research, process analysis, design reviews, and communicating with production and management employees. Caterpillar has also gained insight on a process by allowing new eyes and backgrounds to investigate solutions to an existing problem. Works Cited 1. "History." Caterpillar | History. Accessed November 13, 2017. http://www.caterpillar.com/en/company/history.html. 2. "Caterpillar." Fortune. Accessed November 13, 2017. http://fortune.com/global500/caterpillar/. 3. "Caterpillar." Fortune. Accessed November 13, 2017. http://fortune.com/fortune500/caterpillar/. 4. "Caterpillar." Fortune. Accessed November 13, 2017. http://fortune.com/worlds-most-admired-companies/caterpillar/. 5. "Supply Chain." Caterpillar. Accessed November 13, 2017. http://www.caterpillar.com/de/careers/career-areas/college-university/development-programs/uk-graduates/disciplines/supply-chain.html. 6. "Pugh Matrix." ISixSigma. Accessed November 13, 2017. https://www.isixsigma.com/dictionary/pugh-matrix/. 7. "About Us - Six Sigma | Training and Certification | 6 Sigma." SixSigma.us. Accessed November 13, 2017. https://www.6sigma.us/six-sigma.php. 8. “Caterpillar Logo.” Caterpillar | Caterpillar, Caterpillar, s7d2.scene7.com/is/image/Caterpillar/C10000554?$cc-s$. People How does the proposal affect those who are working directly with the process? (In terms of safety) Quality Does the new process affect the quality of the product that it is creating positively or negatively? Velocity Does the new process increase or decrease the amount of time taken during certain portions of the process? Cost What is the associated cost of implementing the new process? Does it cost more or less to produce units? Criteria Weighted Value Baseline Solution Solution #1 Score Solution #2 Criteria #1 9 2 18 1 Criteria #2 5 -1 -5 Criteria #4 4 3 6 Criteria #5 7 -.5 -3.5 14 Criteria #6 -6 19.5 23 Fig. 1 - PQVC Fig. 2 – Pugh Matrix Proceedings of the 2018 ASEE Gulf-Southwest Section Annual Conference The University of Texas at Austin April 4-6, 2018