RBMP Delivery Update Outer Hebrides 2017

Slides:



Advertisements
Similar presentations
Development of restoration policy framework Joyce Carr Scottish Government.
Advertisements

Terence Lam. Information of River Thames Location : southern England Length : 346km (second longest in the United Kingdom) Source :Thames Head Mouth :Thames.
This is the Yorkshire Derwent Every catchment has a story...
Aquaculture in Scotland the potential effects of the Water framework Directive the potential effects of the Water framework Directive Peter Holmes Marine.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Advisory group update – September 2013 Development of the second river basin management plans Sustainable water management for the benefit of Scotland’s.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
EC Bathing Waters and Bathing Water quality management Calum McPhail Environmental Quality Unit manager Caroline Dilks Senior Scientist.
CSC 6 February 2008 The Don Catchment as an Opportunity Facilitating Answers to ICM Dr. Jonathan Hillman.
Global Geography 12 Test 1 Review. Instructions Grab a sheet of paper and something to write with Follow along with the power point (slides are timed.
Water Framework Directive and the SRDP Jannette MacDonald Land Unit, SEPA.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
WFD revision – First contribution from the wastewater sector (EU2) EU2 – Milan meeting.
Clodiagh North Tipperary Water Management Unit Action Plan Name Clodiagh North Tipp Water Management Unit Area258 km 2 River Basin DistrictSouth Eastern.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
WFD Characterisation Report Dr Tom Leatherland Environmental Quality Manager 29 October 2003.
A Practical Approach: The General Physico-Chemical Quality Elements and the Classification of Ecological Status.
The Water Cycle1 How does water move through an environment? FOSS: Weather and Water Investigation 7: The Water Planet.
Slaney Lower Water Management Unit Action Plan Name Slaney Lower Water Management Unit Area417 km 2 River Basin DistrictSouth Eastern RBD Main CountiesWexford,
Colligan Mahon Water Management Unit Action Plan NameColligan Mahon Water Management Unit Area641 km 2 River Basin District South Eastern RBD Main CountiesWaterford.
State of Natural Resources Report Ruth Jenkins. Sustainable management of natural resources State of Natural Resources Report (SoNaRR) State of Natural.
Water Quality What does this mean? Think about these questions as you watch the video. We will answer them at the end. Who depends on healthy water sources?
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Engineering in the Water Environment Roy Richardson.
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator June 2017.
Environmental Services Training Group
Options to address fish barriers
Caroline Riley Partnership Manager Healthy Waterways Trust
Meeting Standards and Expectations in the Water Industry
Strategy Review Sessions September 11 and 12, 2017
The second River Basin Management Plans delivery update - Highland
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017.
Monitoring, assessing and classifying the environment
Environmental Services Training Group
The second River Basin Management Plans delivery update - Argyll
Role of Fisheries Trusts/ Boards in River Basin Management Planning
River Basin Management Planning
Proposal for reporting on Programmes of Measures in 2016
2017 Review.
Water Quality Modelling & Monitoring
FORESTRY AND DIFFUSE POLLUTION
Choose the number of the location nearest the Canadian Shield and name the physical feature identified by this number. Bellringer 9.12.
Agriculture /diffuse pollutions
River Basin Management Plans delivery update – North East May 2018
Name: _________________ Class: ________
Monitoring, assessing and classifying the environment
Philippe QUEVAUVILLER
River Basin Planning & Flood Risk Management in Scotland
Developing the second plans
Finnish Environment Institute (SYKE)
Finance Update October 2018/19.
Preparing a River Basin Management Plan WFD Characterisation Manager
Getting in on the Act for community food!
River Basin Management Plan
Feedback from Article 5 workshop
GROUNDWATER CHARACTERISATION in England & Wales
CIS Working Group 2A ECOSTAT SCG Meeting in Brussels
Objective setting in practice
Preparation of the second RBMP in Romania
Swedish views on the revision of the WFD reporting sheets for the next reporting cycle Niklas Holmgren Assistant Director Competent Authority of South.
Water Framework Directive implementation: RBMP assessment
Water Security Raimund Mair World Bank Water Global Practice
WISE – Freshwater WFD visualization tool
UK experience of Programmes of Measures
Workshop WFD and Hydromorphology Brussels, June 2012
Results of the screening of the draft second RBMPs
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

RBMP Delivery Update Outer Hebrides 2017 FORESTRY AND DIFFUSE POLLUTION RBMP Delivery Update Outer Hebrides 2017 Jackie McColm SEPA

WHAT NEEDS DONE? Focus of cycle 2 is on Barriers and diffuse pollution Also looking at improving our evidence where confidence in downgrades or pressure sources is not as high e.g. water bodies that are failing for an unknown reason. To be completed by 2021; 8 barriers 8 unknown sources 1 hydro 2 discharges.

Progress to date

Progress to date SSE Giosla hydro scheme – 2 measures this cycle and then 3 measures 3rd cycle. Negotiations are underway and on track. LA has removed culvert grates to improve 3 WBs Glen Tolsta water supply – revised to GEP Historic barrier removed by OHFT with WEF £ Other hydro reviews are on track. 4 WBs with water quality issues have had their pressure changed due to a change in infomation.

Asset and historic barriers complete

What still needs done? 12 WBs are thought o be impacted by changes to their physical condition and form, mostly Harris but 1 on North Uist. Diffuse pollution issues around the south end of Harris, classified as moderate. Shellfish Water Protected Areas - SEPA are working with Food Standard Scotland, FSS and other partners to improve understanding of the pressure during cycle 2.