COST EFFECTIVE MASS HOUSING TECHNOLOGY

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Buildings and Structures 1
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advantages… Easy to build…Expandable…Transferable
Emerging Technologies for Housing & Building Construction
Constructions of Large-panel Buildings in Vilnius
Concrete Fooring & Roofing System
Steps Toward Decent, Affordable Housing Habitat for Humanity in Amecameca, Mexico ©, 2006 © Scott Moore, 2006.
Q5- U-Value 2010 HL 5. (a) Calculate the U-value of an uninsulated external solid concrete wall of a dwelling house built in the 1950s given the following.
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Heavy Concrete Construction Formwork
Brief Introduction of 3D Construction System
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Fire Behaviour Elements of Structure and Fire Development.
Reinforced Concrete VS Steel
QuickWalls® strong. fast. simple.
Site Cast Concrete slab and beam
Cellular construction
Concrete Construction
High Rise Structural Systems
Prefabricated Timber Frame Construction
How to build a two storey house
PRECAST CONCRETE CONSTRUCTION
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
UNDER OFFER - An opportunity to purchase some easily accessible grazing land which is well fenced and provides excellent equestrian or amenity potential.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Frames and Walls Lateral Stability
Project: Location Map Laa Capitol is the new residential project offering from Laa Builders & Developers. Located in the fast developing residential.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
3D Panel Construction System
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
Orthographic Drawings
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
B.E Civil Engineering (Sem-3)
FORMWORK BUILDING CONSTRUCTION PREPARE BY:-
Structural Slab Analysis
Prefabricated Timber Frame Construction
Table (3.1)- the averages of the 10 models costs
Building Construction Technology I
BUILDING CONSTRUCTION 1
SEISMIC ANALYSIS AND DESIGN OF AN APARTMENT BUILDING WITH SHEAR WALLS
Cast in Place 2 way Flat slabs Basically joists in both directions
MATERIALS AND CONSTRUCTION I
DO’s and DON’Ts of toilet construction
CONCRETE FORMWORK Formwork.
International Building Materials and components
UNIQUE | GREEN | TECHNOLOGY “BUILDING BETTER HOMES”
What are the Requirements of an Effective Construction System?
Backgrounds and plaster
Arch205 building construction floor & Roof systems
Building Construction I Sofia Sebastian 1
Arch205 building construction wall systems
STRUCTURAL TIMBER FRAMING
Lehigh Valley Heritage Center
1 | P a g e SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T /
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Monolithic Concrete Construction using Aluminum form work system
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
Masonry Bearing Walls.
Presentation transcript:

COST EFFECTIVE MASS HOUSING TECHNOLOGY MONOLITHIC CONCRETE HOUSING FORM WORK

What are the Requirements of an Effective Housing System? Must be cost effective. Must be capable of a fast rate of construction. Must be adaptable to any structural design or architectural layout. Must produce high quality, durable and low maintenance structures. Must produce structures that are resistant to meteorological and/or seismic conditions.

MONOLITHIC CONCRETE HOUSING FORM WORK TECHNOLOGY Hand-held reusable aluminum formwork system for forming cast-in-place concrete housing. The System also controls the scheduling of the other trades involved in the construction; steel reinforcement, mechanical and electrical, concreting.

MONOLITHIC CONCRETE HOUSING FORM WORK TECHNOLOGY Can be used for any type of housing from; low rise single or double storey housing, to walk-up apartments, to high rise towers. Can be used for any income level of housing from low income, to medium income, to luxury condominiums.

Features of the System Versatility Speed Quality Durability Cost

Versatility Architect is not required to change the building layout to suit the Mascon System. Capable of forming any type of structural design for any type of housing. Column & Beam Design Loadbearing Wall Design

Versatility The System is unique in that it forms all of the concrete in a building including; walls columns beams floor slabs staircases balconies window hoods storage lofts No need for bricks, blocks or plastering.

Speed Multi-Storey Housing - structures are completed at the rate of four days per floor - regardless of floor size. Single or Double Storey Housing - structures are completed at the rate of one house per day. To increase the speed of construction, several “sets” of formwork equipment can be provided.

Quality Precision in fabricating the Mascon formwork results in accurate and consistent forming of the concrete. The quality of the concrete finish is the same regardless of whether the System is used for low cost housing or luxury housing.

Durability of Housing Units All concrete (walls, slabs, staircases etc.) are poured monolithically, therefore, there are no construction joints and no problems of leaking joints. The result is a rigid reinforced “box” structure that is structurally very durable and very resistant to meteorological and seismic conditions.

Why is this System So Cost Effective? Highly reusable formwork. Forms all the concrete in a building. Unique construction cycling. Uses locally available materials - i.e. concrete and reinforcing steel. Requires unskilled labour only and no cranes. Loadbearing wall structural design.

Internal View of the Aluminum Formwork

Low Cost Walk-Up Apartments - India

Entire Four Storey Superstructure Completed in 16 Days

Each Double Storey House Completed at the Rate of One House per Day

Rigid & Strong formwork Panels Produce Smooth Off-form Concrete Finish

Square Openings Allow for Easy Fitting of Doors and Windows

Note - Surface Mounting of Electrical to Save on Costs

Electrical, However, is Usually Buried in Concrete with PVC Conduits

PVC Electrical Conduits for Floor Slabs

Unique Method for Propping of Floor Slab Formwork

Soffit of Floor Slab After Removal of Floor Slab Panels Undisturbed Prop Head Soffit of Floor Slab After Removal of Floor Slab Panels

Forming of Soffit of Staircase

For Low Cost Housing - No Internal Plastering Required - Only Paint

For Medium to High Cost Housing - A Thin (3mm) Skim Coat of Plaster is Applied Before Painting

For Low Cost Housing - No External Plastering Required - Only Paint

No External Plastering Required - Only Spray Applied Finish

Mascon Aluminum Forms are Handheld NO Need for Cranes

NO Need for Cranes for Concreting with the Mascon System as Concrete Pumps Can Be Used - Low Rise to High Rise