TileCal ROD Commissioning Counting Room Installation

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
RoD set-up for the TileCal testbeam, 2003 period. 9th Workshop on Electronics for LHC Experiments Amsterdam, 30 september 2003 Jose Catelo, Cristóbal Cuenca,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
E.Fullana, J. Torres, J. Castelo Speaker: Jose Castelo IFIC - Universidad de Valencia Tile Calorimeter – ROD Colmar, 11 Sept ROD General Requirements.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic.
June 2006Juan A. Valls - FPA Project1 Producción y validación de los RODs Read-Out Driver (ROD)
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Walls crates cables gas chambers electronics CERN adb.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Setup, Tests and Results for the ATLAS TileCal Read Out Driver Production J. Alberto Valero Biot IFIC - University of Valencia 12th LECC - September.2006.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Cabling for LHCb Upgrade
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
Institute of Nuclear Physics Polish Academy of Sciences
COOLING LHC RACKS PROCUREMENT
VME Pixel ROD Setup in UW Pixel Lab B050
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
CMS Area Working Group Meeting
DAQ for ATLAS SCT macro-assembly
T1 Electronic status Conclusions Electronics Cards:
ALICE Trigger Upgrade CTP and LTU PRR
The Software Framework available at the ATLAS ROD Crate
EMU Slice Test Run Plan a working document.
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TPC Detector Control System
RoD set-up for the TileCal testbeam, 2003 period.
Carlos Solans TileCal Valencia meeting 27/07/2007
Prepared for CSC by Fred Borcherding FNAL
Rack and Interconnect Design in E-plan
Needed for Team A on -End
Presentation transcript:

TileCal ROD Commissioning Counting Room Installation Introduction and System Description ROD TileCal Production Schedule Reception and Preparation for Installation Installation and Test Procedures in UX15-USA15 Juan Valls, Jose Castelo IFIC - Valencia ASSO (LiArg+Tile) Meeting (July 2004)

TileCal DAQ Partitions 12/1/2018 Juan A. Valls - ASSO Meeting

Juan A. Valls - ASSO Meeting ROD Crates ROD Crate (9U400mm) CERN PH-ESS Group LHC Wiener VME 64x Fan Tray, 9 blowers, CANbus Remote water-cooled PS, CANbus 1 P3 backplane 1 SBC (VP110) 8 RODs + with 8 TM boards each (2 HOLA LSC) 1 TBM 8 miniRODs TTC Crate (6U) LHC Wiener VME 64x Fan Tray, 3 blowers, CANbus PS, air cooled, CANbus 1 SBC (VP110) 1 TTCvi 1 TTCex 1 Busy Module LTP 12/1/2018 Juan A. Valls - ASSO Meeting

Juan A. Valls - ASSO Meeting ROD Racks 14 racks assigned to TileCal in 2 rows 2 racks for RODs (RA1604 and RA1603) Each ROD rack will allocate 2 ROD crates 1 TTC crate 1 TTC FO Monitoring space for computer Questions Opened Water Cooling System for ROD Boards (1U drawers on top of each ROD crate + cooling system on Rack) FE Links to ROD Crates (Patch boxes) 12/1/2018 Juan A. Valls - ASSO Meeting

ROD TileCal Project Schedule ROD Motherboard TileCal Production ROD Motherboard LiArg Production LiArg BEC Tests PU-DSP Production TileCal Production Testbench at Valencia PreROD Prototyping and Production ROD Crate Production, TM Boards and TBM Boards Production ROD TileCal Installation and Commissioning USA15 Installation of Racks Reception and Preparation for Installation Installation and Tests USA15 12/1/2018 Juan A. Valls - ASSO Meeting

ROD Motherboard TileCal Production 12/1/2018 Juan A. Valls - ASSO Meeting

PreROD Prototyping and Production 12/1/2018 Juan A. Valls - ASSO Meeting

ROD Crate Production, TM Boards Production and TBM Production 12/1/2018 Juan A. Valls - ASSO Meeting

ROD TileCal Installation and Commissioning in USA15 TileCal: 14 Racks (2 Rows) ROD: 2 Racks (52U) Level 1 104 Racks UX15 Cavern 12/1/2018 Juan A. Valls - ASSO Meeting

Reception and Preparation for Installation (before USA15) ROD + TM Boards Scheduled: 16/05/05 Place: Bat 5 -02 (Valencia Lab at CERN) (or ?) Actions: Unpacking and Visual Inspection ATLAS Standard Labeling, Accepted Boards Into DB Pre-installation Tests PreRODs Scheduled: 16/05/05 Place: Bat 5 -02 (Valencia Lab at CERN) (or ?) Actions: Unpacking and Visual Inspection, ATLAS Standard Labeling, Accepted Boards Into DB Pre-installation Tests ROD Crates and Power Units Scheduled: 09/05/05 Place: Bat 5 -02 (Valencia Lab at CERN) (or ?) Actions: P3 Backplane mounting Basic Tests of Crates Water Leakage. Powe Up-Down Sequence Booting and Configuration, Temperature and Power Consumption Test Full Crate Functionality 12/1/2018 Juan A. Valls - ASSO Meeting

Installation and Tests Procedures in UX15 and USA15 Electrical and Network Cable Installation, PC installation Scheduled: 16/05/05 ROD Crate Installation and Test SBC Configuration and VME Tests ROD TTC Connection and Tests Installation of TBM Boards Installation and Connection to DCS FEB and Optical Link Connections Readout Optical Links Connections Scheduled: 06/06/05 12/1/2018 Juan A. Valls - ASSO Meeting