Working Group A ECOSTAT October 2006 Summary/Conclusions

Slides:



Advertisements
Similar presentations
Intercalibration of assessment systems for the WFD: Aims, achievements and further challenges Presented by Sandra Poikane Joint Research Centre Institute.
Advertisements

Lake Intercalibration: status of ongoing work Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
DRAFT Intercalibration of methods to evaluate river EQ using fish Niels Jepsen, JRC & Didier Pont, Cemagref.
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
Lakes Intercalibration Results - July 2006 Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group A ECOSTAT Intercalibration Progress Coast GIGs JRC, Ispra, Italy, March 2005 Dave Jowett, Environment Agency (England and Wales), Coast.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
River Intercalibration Phase 2: Milestone 4 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Intercalibration Option 3 results: what is acceptable and what is not ? Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 8-9 October 2007 Comparability of the results of the intercalibration exercise – MS sharing the same method Presented by Wouter van de Bund Joint.
River Intercalibration Phase 2: Milestone 2 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River Intercalibration Phase 2: Milestone 3 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
GIG plan updates GIG leads were requested to update their work plans
Marcel van den Berg / Centre for Water Management The Netherlands
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Task on Harmonisation of Freshwater Biological Methods
ECOSTAT, Bristol Hotel, Brussels,
Intercalibration results 2006/2007
Intercalibration Results 2006
Intercalibration progress: Central - Baltic GIG Rivers
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
Working Group A ECOSTAT River GIG results Wouter van de Bund Vaida Olsauskyte Joint Research Centre Institute for Environment and Sustainability.
CW-TW Intercalibration work progress
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Progress on Intercalibration COAST GIGs
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
ECOSTAT, Stresa, Italy, 3-4 July 2006
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
Central-Baltic Rivers GIG progress
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Intercalibration Timetable
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Common Implementation Strategy for the
Update on progress since last WG meeting (13-14 June 2002)
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
Intercalibration Decision and Technical Report
WFD – CIS Working group A ECOSTAT
ECOSTAT, JRC April 2007 MEDiterranean RIVers GIG Report
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT, Stresa, Italy, October 2005
Water Directors meeting Warsaw, 8-9 December 2011
IC remaining gaps: overview and way forward
Water Directors meeting Spa, 2-3 December 2010
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
Lake Intercalibration – IC Decision Annexes + what to do in future
Presented by Ana Cristina Cardoso
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
WG A Ecological Status Progress report April-October 2010
Common Implementation Strategy for the
First issue: same classification system - different boundaries (1)
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
EU Water Framework Directive
Fish intercalibration – rivers Progress and expected outcome
WG A Ecological Status Intercalibration: Where do we go from here ?
NORTH EAST ATLANTIC GIG
WG A Ecological Status Progress report October 2010 – May 2011
Relationships for Broad & Intercalibration Types Geoff Phillips
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

Working Group A ECOSTAT 13-14 October 2006 Summary/Conclusions

‘green boxes’ timetable Draft COM decision and technical report to WFD Committee October 2006

‘grey boxes’ timetable Results in draft technical report - November 2006 Final technical report - February 2007 Final approval ECOSTAT – April 2007 Draft COM decision and technical report to WFD Committee - Spring 2007

‘yellow boxes’ timetable Milestone report to ECOSTAT March 2007 Results approved by ECOSTAT April 2007 Results in draft technical report May 2007 Final technical report June 2007 Reports approved by ECOSTAT June/July 2007 Draft COM decision and technical report to WFD Committee October 2007

RIVERS

Alpine – benthic macroinvertebrates ECOSTAT accepts Alpine GIG results in draft Decision Annex and Technical report No need for further changes Draft COM decision and technical report to WFD Committee October 2006

Central/Baltic – benthic macroinvertebrates Central/Baltic results are accepted by ECOSTAT CB GIG should include in the technical report the reasons for not accepting MS datasets in the harmonisation MS outside agreed ranges will adjust their boundaries or provide an explanation MS whose boundaries are above the agreed range are not obliged to adjust GIG Results apply to all MS in the GIG even to those MS not contributing appropriate data CB GIG steering group will carry out a final check of the calculations

Northern – benthic macroinvertebrates Northern results for organic pollution pressure are accepted by ECOSTAT GIG is asked to clarify the different approaches to harmonise the boundaries: Explain the technical reason Consider to simplify Clarifications need to be sent to JRC 17 November to be included in technical report

Mediterranean – benthic macroinvertebrates Current milestone report is not complete: No national boundary values are included Role of the common metrics should be clarified … MED GIG is asked to revise the report and present to next ECOSTAT

E. Continental – benthic macroinvertebrates Results are in principle accepted Some clarification needed in the presentation of the method in the milestone report EC GIG uses fundamentally different method for setting reference conditions for lowland types  needs further explanation Clarifications need to be sent to JRC 17 November to be included in technical report

Sep 06 Mar 07 Jun 07 (pilot) May 07 Jun 06 Mar 07? likely ? May NO CB Macro-invertebr. Phytobenthos Macrophytes Fish NO Sep 06 Mar 07 Jun 07 (pilot) CB May 07 ALP Jun 06 Mar 07? Not relevant MED likely ? EC May

River GIGs: expected results by Feb 2007 Macro-invertebr. Phytobenthos Macrophytes Fish NO X Jun 07 (pilot) CB May 07 ALP ? Not relevant MED EC

COASTA/TRANSITIONAL

Baltic - Summary Some results now in all quality elements Not all countries completed in any type/QE matrix More results expected by June 2007 Will be some gaps - e.g. Latvia?

Summary of outputs 2006/7 Baltic

Summary of outputs 2006/7 Black Sea

Black Sea - Next Steps National boundaries are being developed for phytoplankton and benthic invertebrates These are not that far apart Agreement needed on standard sampling and analytical methodologies Results ARE possible for June 2007 A workplan is in place - post GIG meeting Varna 20-21 September 2006

Mediterranean - Summary No FINAL results now Some results in all quality elements by June 2007 Major gap will be benthic inverts where only CY/GR expect to complete Phytoplankton (chlorophyll) and angiosperms (Posidonia) most promising Further work definitely needed after June 2007 and resources still be big issue

Summary of outputs 2006/7 Mediterranean

NE Atlantic - Summary Only results agreed now are for benthic invertebrates Many more results expected by June 2007 e.g. phytoplankton There will still be some gaps - particular problem is Transitional Waters More work needed after June 2007 on these gaps plus other metrics and habitats

Summary of outputs 2006/7 North East Atlantic

Summary of outputs 2006/7 North East Atlantic

Summary of outputs 2006/7 North East Atlantic

Lakes

Conclusions – final outcome Agreement on final outcome Med GIG – results to be presented to the Committee with the clear explanations of limitations

Conclusions – final outcome 3. Technical Report needs to include Ranges (if necessary) EQRs (derived by dividing ref value/boundary) guidelines for transposing the ranges to the national assessment systems

Conclusions – IC Decision what – include IC Decision, what – to include TR 4. IC steering group provide to the Committee : the options with pros and cons (interesting discussion, we are not to decide) 5. Paper EQR approaches, pluses + minuses

Conclusions – types 6. New IC types – agreement 7. IC types – national types TR to include compliance table MS types – GIG types

Conclusions 7. TR to include compliance table MS types – GIG types MS – provide national typology GIGs – compliance tables Include in TR Not about values, only how types comply ! Should not be complicated task

Conclusion – participation 8. Participation tables No blank spaces: Participation Non applicable – if there is no lake type Countries and GIGs decide asap

Conclusion - future 9. Yellow boxes with ? Work should be continued also if there is no hopes to finish until March

Thank you !