The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Anthony Guadagni NSLS-II Procurement Manager March 25, 2009.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
ELENA installation progress F. Butin / ELENA collaboration.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
Schedule for the FAIR Antiproton Target
Status of HESR 18th March Gießen Dieter Prasuhn.
TBL, Status, Plans, Experiments
CesrTA Status Report Mark Palmer July 8, 2009.
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Beam-based alignment measurements
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Injector Performance Requirements Conventional Facilities Update
Status of the VEPP-2000 Collider Project at Novosibirsk
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
SuperB RF and Other Components
A Cold SCU Phase-Shifter
ILC 3.2 km DR design based on FODO lattice (DMC3)
Advanced Research Electron Accelerator Laboratory
ILC 3.2 km DR design based on FODO lattice (DMC3)
J. Seeman Assistant Director for PPA/LCLS
A. Freyberg Aug 2016 ECT’16 =>
Injector / Linac Installation Current Status
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Extraction Michael Bevins May 17, 2007
E-Beams Systems Manager
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
Undulator Assembly and Installation Planning
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
MEIC Shifting Magnet Tim Michalski August 6, 2015.
LCLS e- Beams Systems Manager
Rough designs for The LEB and HEB for pCDR-100
Progress Update on the Electron Polarization Study in the JLEIC
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles) left the Institute of High Energy Physics (IHEP) April 4 and should arrive at SSRL in early May. One shipment per month is scheduled through the end of this year. The design and fabrication of SPEAR3 magnets is a collaborative effort of SLAC and IHEP.

The 1.2 Megawatt Klystron for the RF system was successfully tested at Marconi Applied Technologies factory in England. The tube arrived at SLAC on April 12 where additional tests are underway.

The prototype magnet support raft for the BM2 section of the standard arc cell arrived April 6. This raft supports 1 dipole, 2 quadrupoles, 1 sextupole, and 2 corrector magnets. Except for correctors, this raft will be assembled with magnets and vacuum chamber within two months. The electron beam welding of the machined vacuum chamber components is in progress.