Running Large distributed projects

Slides:



Advertisements
Similar presentations
1 GEO Implementation Plan Task Team (IPTT) GEOSS 10-Year Implementation Plan Reference Document.
Advertisements

Ensuring Quality Support by Measuring Quality of Responses Mike Myers Director – Help Desk Operations Robin Rea Process Services Project Manager CompuCom.
Roadmap for Sourcing Decision Review Board (DRB)
MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
System Construction and Implementation Objectives:
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
Examine Quality Assurance/Quality Control Documentation
Training management Trainee administration Good care and communication with trainees creates right learning environment Trainees are to be given.
Service Design 118COM By Taran Saroya.
10-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 10 Project Quality Management.
SQA Work Procedures.
CS 4310: Software Engineering
A web based Project Management and Tracking System Zheng Wang, Yuntian Zhao, Yanhong Li Biostatistics & Statistical programming.
Virtual Mechanics Fall Semester 2009
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
ControlDraw, Modularisation, Standards And Re-Use Standardised Specification and Modular Design How ControlDraw Help.
Software Quality Assurance Activities
From Research Prototype to Production
Asset Record Does Not Equal CI: The confusion between Asset and Configuration Management Christine M. Russo Manager, IT Asset Management and Property.
AGENDA Introduction to Virtual Mechanic Demo Architectural diagram and summary QA steps and user acceptance testing Bugs in the software Feedback from.
Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.
1 Data Flow Diagrams. 2 Identifying Data Flows During the analysis stage of a project it is important to find out how data flows through a system:  Where.
Database Design and Management CPTG /23/2015Chapter 12 of 38 Functions of a Database Store data Store data School: student records, class schedules,
An Introduction to Designing and Executing Workflows with Taverna Aleksandra Pawlik materials by: Katy Wolstencroft University of Manchester.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Use of Administrative Data Seminar on Developing a Programme on Integrated Statistics in support of the Implementation of the SNA for CARICOM countries.
Databases and Information Management Chapter 6. Outline Database Relational Database Database Management System (DBMS) Structured Query Language Data.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
Business ByDesign (Case Study) EGN 5621 Enterprise Systems Collaboration Fall, 2011.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
These slides are designed for presentation purpose only © Copyright SAIsej Consultancy Services (P) Ltd Why ??? Project Management.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
SQA project process standards IEEE software engineering standards
Chapter Five Project Planning.
Year 10 Information & Software Technology
Spreadsheet Controls An Automated Approach
Northern College Diploma Philip Bird
Creating a Database Microsoft Access.
So where in ISO is Process?
SQA project process standards IEEE software engineering standards
records Database Vocabulary It can be useful to collect information.
Incident Command System (ICS)
Release Management Release Management.
How do the Process Model, WBS, SPMP, Goal Statement,
Introduction to Office365 Forms and Flow
Overview of System Engineering
EMIS. EDUCATION MANAGEMENT INFORMATION SYSTEM (EMIS)
Tools of Software Development
Product Development Scenario Overview
Software Requirements Specification Document
Health, Safety & Environmental Management System 2018
Chapter 13 Quality Management
CS 8532: Advanced Software Engineering
HSF Contents and Future Links to the ADMM
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
CBGD: Nguyễn Thanh Tùng
PLANNING & SCHEDULING (First Part)
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 8 Slide 1 Tools of Software Development l 2 types of tools used by software engineers:
Built by Schools for Schools
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Contract Management Software from ContraxAware Simplify Your Contract Management Process.
Presentation transcript:

Running Large distributed projects Introduction Small and large projects The Tasks Last century documents Data Ownership The ControlDraw method Copyright ControlDraw Ltd 2002

Small and large projects A single person, a small project. A larger project a small team.. Big projects a team of teams. Small teams can work if they have real control over their tasks. But Plant operators need consistency Standards are required, and these are not available from ISO numbers or supplier catalogues yet Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 Distributed Projects Procurement and construction also distributed in other ways Team of teams must understand their zones of responsibility Need careful technical management ControlDraw can help. Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 The Tasks Area A – Process Supplier A Area B – Process Supplier B Utilities – Process Supplier U Control System – Control System Supplier Each to write a detailed specifications for their part A,B and U to provide FDS’s for the equipment and processes in their scope Control System Supplier to provide an overall FDS and system to achieve the requirements Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 Design Manager Has to Co-ordinate the suppliers, Check that designs meet contract Ensure all the parts fit together. Involves an intense process of reading all the documents Often delegates much to the CS supplier Copyright ControlDraw Ltd 2002

Last century documents. The ‘old’ way: long text documents. disparate spreadsheets and databases. their last project. Very hard to read. Qualitative differences. Hard to review No single search No means of measuring contents A new version arrives – what has changed? It provides plenty of work. Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 Last century Data Data accuracy, version control and time delay problems Who ? owns each aspect produces, reviews, approves each record who supplies the data Some project databases help some parts, IO lists How is it validated It provides plenty of work. You need defined data ownership. Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 This century An integrated collection stored in a database from each supplier Diagrams Easy to read. Ownership clear Fast review Model Review system, Search and reporting built-in Metrics available for all content. A new version arrives – what has changed? Version management and recording built-in Detailed object based compare functions It makes the work much easier Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 A process control database Process control diagrams Configurable test sheet generation. Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 The ControlDraw way Linked models Each supplier owns their part Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 Reference Models Reference Models provide common objects Copyright ControlDraw Ltd 2002

Checklist How does your system compare? Copyright ControlDraw Ltd 2002

Copyright ControlDraw Ltd 2002 Thanks for listening Copyright ControlDraw Ltd 2002