Lean Apartment Construction Workshop

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Lean Apartment Construction Workshop
Presentation transcript:

Lean Apartment Construction Workshop LEAPCON Lean Apartment Construction Workshop

Apartment Construction 22 פברואר, 2006 בנייה רזה Apartment Construction Drywall Ceilings HVAC Flooring Design Changes (c) 2006 Dr. Rafael Sacks, Technion

Simulation setup 2 3 4 5 6 7 8 Building floors and apartments 22 פברואר, 2006 בנייה רזה Simulation setup Material Store Building floors and apartments Crane Client Rep 1 3 2 4 5 7 6 8 2 9 11 10 12 3 13 15 14 16 4 17 19 18 20 5 21 23 22 24 6 25 27 26 28 7 29 31 30 32 8 HVAC team Drywall team Flooring team Quality Control Ceiling team Project Manager Design Changes Client Changes Rep Client (c) 2006 Dr. Rafael Sacks, Technion

Production Plan (Gantt Chart) 22 פברואר, 2006 בנייה רזה Production Plan (Gantt Chart) (c) 2006 Dr. Rafael Sacks, Technion

Results for 2 groups Round Completed (units) 22 פברואר, 2006 בנייה רזה Results for 2 groups Round Completed (units) Defective apartments (units) Time to first apartment with changes (min.) W.I.P. (units) Throughput (units/min.) Cash flow ($) Cycle time (min.) Conventional (1) (2) (3) Lean (4) (5) (c) 2006 Dr. Rafael Sacks, Technion

Discussion between rounds: Difficulties with the system 22 פברואר, 2006 בנייה רזה Discussion between rounds: Difficulties with the system Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control? Drywall team: Were you busy? HVAC team Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment construction in real projects? How would you improve the process? (c) 2006 Dr. Rafael Sacks, Technion

Discussion after the second round 22 פברואר, 2006 Discussion after the second round בנייה רזה Management Team: What did you feel during the game? Were you busy? Did you manage to implement your plan? Were you in control? Drywall team: Were you busy? Was your productivity improved? HVAC team Bottleneck, Cycle time, WIP, Push What is the meaning of cycle time for apartment construction in real projects? How would you improve the process? (c) 2006 Dr. Rafael Sacks, Technion

LEAPCON – typical results 22 פברואר, 2006 LEAPCON – typical results בנייה רזה (c) 2006 Dr. Rafael Sacks, Technion

LEAPCON - Cash Flows LEAPCON Simulation F: Lean 21:04 LEAPCON - Cash Flows $(20,000) $(15,000) $(10,000) $(5,000) $0 $5,000 $10,000 $15,000 $20,000 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Simulation Time (min.sec) Cash Flow F': Lean, no customization F: Lean A': Conventional, no customization A: Conventional LEAPCON Simulation www.technion.ac.il/~cvsacks/tech-leap.htm

LEAPCON Users around the world 21:04

Background Reading “The Goal” Eli Goldratt www.leanconstruction.org 21:04 Background Reading “The Goal” Eli Goldratt www.leanconstruction.org “Lean Thinking” Womack and Jones www.iglc.net “The Critical Chain” Eli Goldratt “Factory Physics” Hopp and Spearman Sacks, R., Esquenazi, A., and Goldin, M., (2007). ‘LEAPCON: Simulation of Lean Construction of High-rise Apartment Buildings’, Journal of Construction Engineering and Management, Vol. 133 No. 7 pp. 529-539.