Arc Standing Committee

Slides:



Advertisements
Similar presentations
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Advertisements

Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Doc.: IEEE /0493r0 AgendaRich Kennedy, MediaTek IEEE /15 Regulatory SC DRAFT Vancouver Meeting Plan and Agenda Date: Authors:
Doc.: IEEE /0333r1 Submission Mar 2009 David Bagby, Calypso Ventures, Inc.Slide ARC Standing Committee Date: Authors:
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0867r0 Submission July 2008 Darwin Engwer, Nortel NetworksSlide 1 MAC Component Breakdown Topics for Discussion Date: Authors:
May 2014 Agenda doc.: IEEE /0488r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
July 2014 Agenda doc.: IEEE /0753r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
Doc.: WCAG-06/0001r0 Submission March 2006 Tom Siep, Cambridge Silicon RadioSlide 1 Wireless Coordination Activity Group Report Notice: This document has.
Doc.: IEEE /0185r0 Submission September 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – September 2006 IEEE P
Vertical Applications TAG
IEEE 802 Wireless Coexistence Study Group November Plenary Meeting
ARC-SC-agenda-Mar-2016 Date: Authors: July 2009
Towards an Improved Proposal Development Process for VHT
ARC-agenda-march-2014 Date: Authors: July 2009
Towards an Improved Proposal Development Process for VHT
Vertical Applications TAG
[VHT SG Approach Proposal]
Submission Title: Closing Report for the TG4n Session in May 2012
nd Vice Chair’s Report – Mar 2012
Vertical Applications TAG
Liaison Report Date: Authors: January 2012
nd Vice Chair’s Report May 2013
nd Vice Chair’s Report – Nov 2012
Task Group ac Process Overview
March Opening Report Date: Authors: March 2010
January Opening Report
ARC SC Closing Report – July 2013
nd Vice Chair’s Report – July 2012
doc.: IEEE <doc#>
February 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for.
Arc Standing Committee
Arc Standing Committee
ARC-agenda-report-minutes-july-2011
nd Vice Chair’s Report – Jan 2013
Attendance for July 2006 Date: Authors: July 2006
February 19 March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for Orlando,
ARC Standing Committee
Arc Standing Committee
Arc Standing Committee
Arc Standing Committee
nd Vice Chair’s Report July 2013
nd Vice Chair’s Report – March 2013
January Opening Report
Task Group Process Overview
nd Vice Chair’s Report – Nov 2012
IMT-Advanced Overview - March 2007
nd Vice Chair’s Report September 2013
Arc Standing Committee
VHT SG November 2008 Closing Report
nd Vice Chair’s Report – Sept 2012
Arc Standing Committee
IMT-Advanced Status Report
November 2018 Opening Report
Policies and Procedures Status and Plans
Arc SC Chairs’ Report Jacksonville, FL, US May ‘08
ARC-agenda-sep-2014 Date: Authors: July 2009
IMT-Advanced Overview - March 2007
ARC-agenda-may-2013 Date: Authors: July 2009
nd Vice Chair’s Report – Jan 2013
ARC-agenda-november-2013
Arc SC Chairs’ Report Denver, CO, US July ‘08
ARC-agenda-july-2013 Date: Authors: July 2009
July, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July.
ARC-agenda-report-minutes-july-2011
ARC-agenda-sep-2015 Date: Authors: July 2009
TGp Closing Report Date: Authors: November 2006 Month Year
Wireless Architectural Thoughts
Presentation transcript:

802.11 Arc Standing Committee May 2008 doc.: IEEE 802.11-08/0575r0 May 2008 802.11 Arc Standing Committee Date: 2008-05-09 Authors: David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

May 2008 doc.: IEEE 802.11-08/0575r0 May 2008 Abstract This presentation contains an introduction and overview of the 802.11 Arc standing committee. David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.

IEEE P802.11 WG Chair’s Architecture Committee May 2008 IEEE P802.11 WG Chair’s Architecture Committee An outline of the motivation and goals for the 802.11 Arc Standing Committee. David Bagby, Calypso Ventures, Inc.

May 2008 What: An architecture group (“the Arc”) has been formed as a WG Chair’s committee. Mission: The Arc group is tasked to discover, analyze, codify, and promote a common understanding of 802.11 architecture. Discover: To notice or learn, especially by making an effort; Archaic To reveal or expose; Analyze: To separate (a material or abstract entity) into constituent parts or elements; determine the elements or essential features of; Codify: To arrange or systematize; Promote: To help or encourage to exist or flourish; The Arc team utilizes 802.11 members with significant expertise, experience, and history within 802.11. David Bagby, Calypso Ventures, Inc.

What: (not) The Arc Committee is Not a project approval body. May 2008 What: (not) The Arc Committee is Not a project approval body. Not a gatekeeper. Not a procedures committee. David Bagby, Calypso Ventures, Inc.

Why: May 2008 802.11 is a large document It’s growth has been a bit more chaotic than carefully coordinated. It’s nearly impossible for an individual to abstract from a 1000+ page document the underlying basic framework. 802.11 is a large organization There are individuals that are experts is various aspects, but almost no one (if anyone) groks (to understand profoundly through intuition or empathy) the entire thing. Numerous examples of members not fully grasping architectural concepts and this leading them into extra work (“Better houses with good foundations”). Low Modularity Organization size has pushed 802.11 TG activity toward becoming multiple semi-isolated silos; TG activities need a common framework to assist in understanding activity interactions and scope. Increased modularity would assist shared understanding of context for activities. This would be of particular benefit to newer members. David Bagby, Calypso Ventures, Inc.

Why: May 2008 With apologies to Dr. Suess. What’s needed IT’S A WIRE David Bagby, Calypso Ventures, Inc.

How The Architecture Committee was created as a WG Chair’s committee. May 2008 How The Architecture Committee was created as a WG Chair’s committee. It is a Standing Committee (not a TG). Attendance counts toward 802.11 attendance credit during session weeks. David Bagby, Calypso Ventures, Inc.

Who Management Contributors May 2008 The SC management team is the driving/coordinating aspect of the activity. Arc Chair: David Bagby Key contributor for 1997 std architecture sections. Founding member of 802.11, Former MAC & TGF Chair, Member Emeritus #1 Arc VChair: Darwin Engwer Key contributor for 2007 std architecture sections. Long time participant, key contributor for architectural topics since 1994, former TGma Vice-Chair, initiator of Very High Throughput (VHT) SG. Contributors The SC management team expects to pull in multiple WG members who have specific subject expertise. This is crucial as the Arc activities are unlikely to be accomplished by just the core members. David Bagby, Calypso Ventures, Inc.

What (Arc activities) 1) What is the Architecture as of 802.11 2007? May 2008 What (Arc activities) 1) What is the Architecture as of 802.11 2007? Discover, analyze, codify… into white paper/presentation output Stick strictly to “what it is”, not “what do we wish it was”. This first activity back fills basics to correspond to the 2007 revision. David Bagby, Calypso Ventures, Inc.

May 2008 What (Arc activities) 2) What are the pending Arc impacts of current 802.11 TG activities? Most TG activities are already quite far along in their development. Mostly “what is it”, some “why is it” Updates to output from activity 1. Discover, analyze, codify and promote. Update ordering In order of TG completion schedules? Or some other order that would be more beneficial? David Bagby, Calypso Ventures, Inc.

May 2008 What (Arc activities) 3) Encourage SGs to consider which portions of the 802.11 Architecture they are proposing to modify. 4) Contact point for 802.1 architecture liaison topics. David Bagby, Calypso Ventures, Inc.

When The Arc appointees wish this already existed… May 2008 When The Arc appointees wish this already existed… Some framework components already exist, significant others do not. With the help of additional volunteer subject matter experts, we’ll do the best we can to progress these activities. David Bagby, Calypso Ventures, Inc.

Where .11 WG updates during session weeks. May 2008 Where .11 WG updates during session weeks. We expect most activity to be offline, between 802.11 sessions. Once the work plan firms up, we’ll be soliciting key members to assist. Fame can be yours! Let us know where your interests are… David Bagby, Calypso Ventures, Inc.