The electronics system of the TOTEM T1 telescope

Slides:



Advertisements
Similar presentations
SDW TAORMINA A NEW GENERATION OF DATA AND CONTROL INTERFACES FOR DIGITAL DETECTORS F. Bortoletto 1, M. D’Alessandro 1, E. Giro 1, R. Cosentino 2,
Advertisements

GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
E. Robutti. TOTEM 1. Measurement of the total pp cross-section. 2. Study of elastic proton scattering over a wide range in momentum transfer up to (–
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
B. Hall 17 Aug 2000BTeV Front End Readout & LinksPage 1 BTeV Front End Readout & Links.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
TPC electronics Status, Plans, Needs Marcus Larwill April
BPM stripline acquisition in CLEX Sébastien Vilalte.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
Trigger & Tracking detector for CMS
FF-LYNX: 2010 & H Luca Fanucci Pisa, 14 Giugno 2011.
LHCb Outer Tracker Electronics 40MHz Upgrade
Work on Muon System TDR - in progress Word -> Latex ?
The timing upgrade project of the TOTEM Roman Pot detectors
Novosibirsk, September, 2017
Banaras Hindu University
The Totem trigger architecture The LONEG firmware archtecture
Production Firmware - status Components TOTFED - status
Possible contribution of Pisa on pixel electronics R&D
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Introduction Status before the 2009 run Results from the 2009 run
Readout System of the CMS Pixel Detector
T1 status (a selection from EDR presentations)
CMS muon detectors and muon system performance
Totem Readout using the SRS
University of California Los Angeles
T1 Electronic status Conclusions Electronics Cards:
CMS EMU TRIGGER ELECTRONICS
Frontier Detectors for Frontier Physics presented by Paolo Musico
University of California Los Angeles
Planar Edgeless Silicon Detectors for the TOTEM Experiment
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
The digital read-out for the CSC system of the TOTEM experiment at LHC
LHCb Muon Detector MWPC & GEM
Overview of T1 detector T1 is composed by 2 arms
The digital read-out for the CSC system of the experiment TOTEM at LHC
TOTEM experiment at the LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
Status of CMS-PPS timing detectors
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

The electronics system of the TOTEM T1 telescope presented by Saverio MINUTOLI I.N.F.N. Genova – via Dodecaneso 33 – 16146 Genova (I) T1 Telescope, Inelastic detector in the region 3.1 < |h| < 4.7 Cathode Strip Chambers, Ar/CO2/CF4 mix Shown half T1 telescope cathode plane Read-out of anode wires and cathode strips at ± 60º Three coordinates. 5 planes, 6 sextants each, inside CMS muon end-cap Digital read-out chosen for both anodes and cathodes Custom Front-End VLSI chip called VFA (CERN-TOTEM design) Trigger implemented with groups of wires Hits and trigger bits optically transmitted LHC clock and fast commands compliant Insertion of one half-arm of T1 (IP5 '–' side).

Cathode Front-End Card F-E VFAT hybrid The VFAT chip has 128 channels input Produces Hits and Trigger information Hits information is in the form of binary patterns Trigger information is provided by programmable fast “ORs” Anode Front-End Card 10 shapes driven by T1 geometry hosts two VFAT hybrids (256 chs) 60 boards installed 11,100 channels acquired VFAT hybrid Basic architecture of the Read-out system AFEC Cathode Front-End Card hosts one VFAT hybrid (128 chs) 160 boards installed ~16,000 channels acquired CFEC Read Out Control board 36 boards installed Manages up to two CSC chambers Collects hits data and trigger bits Hosts 3 optical transmission link, Ethernet 8B/10B Includes the trigger bits synchronization circuitry Embedded slow control link based on CMS-CCU device Implements Redundant Skip Fault Architecture Hosts custom FPGA based spy mezzanine ROC