12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.

Slides:



Advertisements
Similar presentations
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Advertisements

Steel Valley Intergovernmental Initiative: The Boroughs of Homestead, West Homestead and Munhall.
MADISON MARKET 2013 LANDRETTI & COMPANY, LLC DOMINIC LANDRETTI, MAI December 2013.
Mississippi Chapter – American Society of Landscape Architects 2006 Awards Program Walnut Square and Walnut Circle Public Design Project Name: Project.
Proposed Redevelopment Presentation Constitution Ave 11 December 2012.
PROJECT EMERALD SKYLINE
Linden Hills Small Area Plan WorkshopWorkshop April 24 & 25, 2013.
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
Case Study- Mizner Park, Boca Raton City purchased the 28.7-acre site for $58 million Issued a long-term lease for a mixed-use development on 12 acres.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
What’s Happening? What’s happening in Tysons? A lot!
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
SAVE OUR CITY: COMMUNITY DEVELOPMENT Commercial Revitalization.
Kirby & Richmond. D C A B KIRBY 3 Lanes each way Center continuous turning lane Utilities Run along the West side Green space on the side between street.
The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge.
TRADITIONAL NEIGHBORHOOD DEVELOPMENT (TND) ARTICLE City of Columbus
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
City of Waynesboro Entrance Corridor Design Guidelines.
Central Business District Study Area 1500 acres along Peachtree Pkwy.
City Council and P&Z Commission Joint Workshop Discussion of TOD Code April 2, 2009.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Blue Prints.
Historic Rehabilitation Projects Buildings designated on a national / state / or local historic register are eligible for rehabilitation using federal.
New Urbanism Theory and Practice
How it changed perspective for one City and its residents.
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
R ECENT T RANSIT O RIENTED D EVELOPMENT IN S AINT P AUL F INANCED BY THE P RIVATE M ARKET.
Springfield Zoning Ordinance Revision Project Naismith Basketball Hall of Fame April 25, 2006 Planning and Economic Development Office Sponsored by a grant.
An Integrated Perspective on the Southeast 17 Corridor Presenters: Lothar Wiwjorra, Senior Urban Designer Xia Zhang, Planner/Urban Designer Naveed Butt,
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Replace with appropriate image in View > Master. Blatchford Redevelopment.
Public Meeting: Tuesday, February 25,  Relationship to Comprehensive Plan  Existing Conditions  Transportation Overview  Market Overview  Concept.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
Board of County Commissioners Second Public Hearing August 10, /10/
SITE. ZOM CPA ZOM R-1B R-1A PD A A.
CTC Planned Development and Development Agreement Modification January 26, 2016 Planning Commission Hearing Greg Turner, Land Use Manager.
CTC Planned Development and Development Agreement Modification January 12, 2016 Planning Commission Workshop Greg Turner, Land Use Manager.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Potential Neighborhood Development Strategies 158 acres Close.
CITY OF TEHACHAPI DOWNTOWN MASTER PLAN IMPLEMENTATION October 2, 2008.
The City of Edgewood, Florida Economic & Market Analysis.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Raheja’s Upcoming Commercial Development in Gurgaon  Raheja Trinity, a novel innovation by Raheja Developers, introduces the new concept of bringing.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
HOW GOVERNMENT REGULATION CREATES SPRAWL: JACKSONVILLE AS A CASE STUDY.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
Downtown Action Team Progress Report October 5, 2004 Steve Pinkerton Director of Housing & Redevelopment.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
GRAPHIC ANALYSIS of EXISTING DOWNTOWN DENSITY
Council for Quality Growth North Fulton Advisory Meeting
253 South Los Robles Avenue Predevelopment Plan Review
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
CFT Gateway Center ( E. Foothill Blvd
Jefferson County Planning Commission Hearing April 10, 2013
City Council September 18, 2017
SPRING 2017 COMMUNITY ENGAGEMENT
83 North Lake Avenue Predevelopment Plan Review
Board of Trustees Meeting
Sandy Point Phase One of development is the “New Urban Waterfront” area Encompasses existing Sandy Point Road, extending south from Soundside Road to.
City Council Meeting April 23, 2018
254 East Union Street Pre Development Plan Review
Creating Streetscapes With Conventional Zoning
Real Estate with a Servant’s Heart ®
Mixed-Income Development
Presentation transcript:

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved buildings. These buildings may house professional offices or very small scale retail operations…like a coffee shop. Rowhouse buildings transitioning from commercial along 52 nd Street and Kalamazoo to the south. Maintain existing medical offices along Kalamazoo Aggressively buffer the existing residences from new development with walls and landscaping. Maintain residentially scaled buildings in new construction.

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 REVISION 1 Continue arc onto other corner and create park. Reduce density and make a quicker transition to existing residential to the east and south. Exit only drives on 52 nd west of Kalamazoo Professional offices or very small scale commercial like coffee shop or deli. Buffer the existing residential that is behind this redevelopment with decorative wall and landscaping. Pocket park in existing neighborhood

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #2 One plaza or park at intersection of 52 nd and Kalamazoo fronted with buildings that contain commercial uses – retail (yellow) and office Rowhouse buildings north of the intersection along Kalamazoo. Offices south along Kalamazoo and East along 52 nd Street. Maintain existing medical offices along Kalamazoo Rain gardens…indicated in blue Buffer existing residences from new construction

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #1 Retail and Mixed Use buildings along Eastern Avenue with storefronts and street facing facades. (80,000 square feet of ground floor commercial) Rowhouse buildings transitioning from commercial. (97 residences) Single family homes at neighborhood edge. (33 residences) Street grid and compact block structure. Central green: 330 feet x 180 (1.4 acres) Typical football field is 360 feet x 160 feet

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #1 COMMENTS Make the park go all the way to 52 nd Street. Incorporate the ice cream store into park. Turn the park east to west. No apartments…all owner occupied. Too many rowhouses…lower density housing

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #1 REVISION 1

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #1 REVISION 2

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #2 Retail and Mixed Use buildings along a crescent shaped slip street which will allow on street parking in front of the retail. (100,000 square feet of ground floor commercial) …..including reuse of existing 40,000 square foot grocery. Rowhouse buildings transitioning from commercial. Senior housing – similar to existing neighborhood context. Street grid and compact block structure. Central green: 200 feet x 150 (.7 acres) Less formal green space - naturalistic

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern Concept #2 REVISION 1

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern: TRANSFORMATION STUDY PHASE 1: EXISTING CONDITIONS

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern: TRANSFORMATION STUDY PHASE 2

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern: TRANSFORMATION STUDY PHASE 3

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Eastern: TRANSFORMATION STUDY PHASE 4