XFEL Beam Collimation and Switchyard Review Beam Switchyard

Slides:



Advertisements
Similar presentations
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Advertisements

W. Decking, B. Faatz, C. Gruen, M. Hϋning, J. Kahl, J. Klute, K. Mϋller, F. Obier, J. Wortmann FEL Beam Dynamics Meeting, Flat Top Pulser for.
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
FLASH 2 Beam Dynamics Issues Winni Decking DESY –MPY-
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Winni Decking XFEL Beam Collimation and Switchyard Review Introduction FEL-Beam-Dynamics Group
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Status of ATF Fast Kicker Experiment
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
3 GeV, 1.2 MW, RCS Booster and 10 GeV, 4.0 MW, NFFAG Proton Driver G H Rees, ASTeC, RAL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Principals of fast injection and extraction R. Apsimon.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Yoshitaka Yamaguchi Rare-RI Ring A/Z=3 Design of Rare-RI Ring - measurable with one particle - 1ms for measurement time.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
Oleksiy Dolinskyy 1st December, 2014
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LINAC4 ADVISORY COMMITTEE
A.Lachaize CNRS/IN2P3 IPN Orsay
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Options and Recommendations for TL and Dumps
NSLS-II Lattice Design Strategies Weiming Guo 07/10/08
Case Study - Group 2 FCC-ee Top-Up Injection
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Lost muons and radial B-field
Junji Urakawa (KEK) for ATF International Collaboration
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Injector Beam Line Optics
2017 CAS Erice case study: Design of a beam dumping system for FCC
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
LHC (SSC) Byung Yunn CASA.
PS2 Injection/Extraction Layout
FEL-Beam-Dynamics Group
Pulsed Sextupole Injection for Beijing Advanced Photon Source
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Y. Nosochkov and M. Woodley (SLAC)
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
Linear beam dynamics simulations for XFEL beam distribution system
Specifications for the XFEL Beam Switchyard Kickers
Proposal for quadrupole families
Transfer Line for EIC.
Status and plans for crab crossing studies at JLEIC
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

XFEL Beam Collimation and Switchyard Review Beam Switchyard FEL-Beam-Dynamics Group 3.12.2007 Winni Decking

pulser prototype measurement pulser prototype measurement Beam Distribution 15o deflection to Dump 2.2o arc to SASE 2 200 ns 300 ms low accuracy (>1 %) 5 MHz burst operation high accuracy (< 0.01 %) 10 Hz operation pulser prototype measurement pulser prototype measurement Winni Decking

Beam Switchyard Optics to T1 to dump to T20 15o deflection to Dump 2.2o arc to SASE 2 Winni Decking

Distribution: Kicker Strength & Stability kicked un-kicked Septum thickness: xseptum=5 mm Tolerable jitter: njitter=0.1 s Collimation depth: mcollimation=85 s Beta at Septum: bseptum=30 m <Beta> at Kicker: bkicker=25 m Septum Winni Decking

Kick Trajectory 0.5 mrad kick required Winni Decking

XFEL BD Kicker amd Septum Specs Fast single bunch kicker (for beam dump) Flat top kicker (for beam distribution) Pulse Form Burst Flat top Repetition Rate Hz 5×106 10 Max. Pulse Width s 200×10-9 300×10-6 Rise/Fall Time < 100×10-9 ≈20×10-6 Rel. Amplitude Stability 0.01 3×10-4 Relative Residual Ripple Kick angle mrad 0.5 Max. int. Field Strength mT×m 42 Min. full aperture mm 30 Max. system length m 18 Winni Decking

Beam Switchyard - Collisions Winni Decking

Collision – TD1 Kickers & Beam Dump Line Severe Collisions, requires re-design of dump line stronger septum planned give up achromat vertical dogleg and horizontal bend Winni Decking

Collision – TD2 straight & TD1 arc collision of 2 quadrupoles remove straight line quad – easy remove bend quad – maybe not possible => mirror plate quad Winni Decking

Passage of Dump Line - Okay Winni Decking

TD1 Arc Winni Decking

Off-Momentum Beam Transport d = 0%, ±1.5% 1 s ellipses 2 sextupoles horizontal vertical d = 0%, ±1.5% 1 s ellipses Winni Decking

Off-Momentum Beam Transport d = 0%, ±2.5% 100 s ellipses Missing: Influence of kicker Influence of septum stray fields has been calculated by Bagrat Grigoryan Winni Decking