Pump House wall before installation
Mikie preps the wall for the utility box
Access from outside building. Fiber run from ML, enters building Cisco Phone will be installed at this location Access from outside building. Fiber run from ML, enters building at this 8x8x4 junction box. 1in emt feeds fiber to NETS new utility box
Power has been installed at this location 3 1in emt conduits enter the utility box at this location
Fiber will be terminated and all equipment will be located in this utility box. Dedicated network for PPS monitoring equipment
Final Product