Pump House wall before installation.

Slides:



Advertisements
Similar presentations
VIBRATION AND LUBE OIL PRESSURE SWITCH INSTALLATION AND MONITORING Higgins Station.
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
UNIT 31 HOME ELECTRICAL SYSTEM
Welcome to the Fiber to the Home (FTTH) Informational Meeting 1.
Welcome to the Town of Troy Fiber to the Home (FTTH) Informational Meeting 1.
ADT490 TroubleShooting Locating Grounds A. 2 How are the Circuits Installed ‣ Before looking for the actual location of a fault on a circuit, look at.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
BODY AREA SENSOR NETWORKS (BANs). HISTORY BANs used primarily for health monitoring BANs used primarily for health monitoring Hospital monitoring equipment.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Algebra Foundations Box Factoring or acb Method x 2 - 4x + 4 x2x2 4.
Domestic Installation: Switch Circuits
HDTV “High Definition TV” High Def. (left) vs. Standard Def. (right)
FTTP Last Update Copyright Kenneth M. Chipps Ph.D. 1.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
DE03XC W 13 Mile Road, Birmingham, MI , Access: Gate Code /11/12 Walked by; C&S Engineers – Alan MacPherson,
. Customer Outreach and Education Options Available To Customers Who Are Disabled R Phase 3 Workshop Dave Pojtinger AT&T California March 9,
Jones/NCTI ™ in the Palm of Your Hand Installer Online Coming October 2009.
Ferndale Electric Company Project overview from September 2007 to present.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
INTRUSION ALARM TECHNOLOGY
0 If you have set-up the equipment and are unable to access your service, call 1(888)ONE-ATT0/1(888) or for
Cisco Threaded Case Study
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Fiber Optic Data Network Project Tuscaloosa County School System 2006.
1 Structured media enclosure (distribution device) Structured media enclosure (distribution device) BASIC TELECOMMUNICATIONS.
Underground Networks. Current System Wichita ~180 Network Transformers Not including spot network transformers Topeka 26 Network Transformers Rest of.
Session 2 Equipment Requirements for Adaptive Traffic Control SCOOT Axel Reissnecker, EAGLE Traffic Control Systems, Austin, TX TRB Workshop on Adaptive.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Инвестиционный паспорт Муниципального образования «Целинский район»
FSILG Data Networks Stuart Peloquin, MIT ResNet Coordinator Oliver Thomas, Manager, MIT Help Desk FSILG House Manager Course, IAP 2006 Wednesday, 18 January.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
CENIC/NLR Optical Networks Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC
INTRUSION ALARM TECHNOLOGY
0 If you have set-up the equipment and are unable to access your service, call 1(888)ONE-ATT0/1(888) or for
1Convergence_Internal © 2001, Cisco Systems, Inc. IP Telephony ROI Case Studies.
HOMEWORK REVIEW. SOLVE ABSOLUTE VALUE INEQUALITIES 5.6.
Free Space Optics Equipment Last Update Copyright 2011 Kenneth M. Chipps Ph.D. 1.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Inspection Team Topic: Electrical Safety 9/15/2015.
Wi-Fi® Remote Access NOW AVAILABLE!
M M M M 5. Not Listed
By Mrs. Bushman With pictures from Microsoft Clip Art & Apple.com.
21 st Century Network Project Status Approximately 18 months ago work began on the 21st Century Network Project. This project encompasses many facets of.
Computer Science I More 3D examples. Classwork/Homework: experiment and design, plan, complete your 3D project.
1 Figure 2-6: Building Security Building Security Basics  Single point of (normal) entry to building  Fire doors, etc.: use closed-circuit television.

September 30, 2008 Jim Van Dyke, Web:
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Configuring Cluster Communications
IT Set-up Plan Corporate Process Innovation Dept. Date: June 2014
Phone: + 40 (728) | +40 (733)
Horizontal and Back Bone Cabling
Multimedia Training Kit
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
مديريت موثر جلسات Running a Meeting that Works
Computer Systems Department.  Introduction  Course Objectives  Grading Policy  Lab Policy  Structured Cabling.
Smitty’s Two Minute Drill Grounding and Bonding
Remote Access Design Draft.
WP2 – Operational Context & Scenario
Microtechnology Approaches for FTTP
Presentation transcript:

Pump House wall before installation

Mikie preps the wall for the utility box

Access from outside building. Fiber run from ML, enters building Cisco Phone will be installed at this location Access from outside building. Fiber run from ML, enters building at this 8x8x4 junction box. 1in emt feeds fiber to NETS new utility box

Power has been installed at this location 3 1in emt conduits enter the utility box at this location

Fiber will be terminated and all equipment will be located in this utility box. Dedicated network for PPS monitoring equipment

Final Product