Brief Status Report on Fabrication of ATF2 Quads

Slides:



Advertisements
Similar presentations
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer SLAC National Accelerator Laboratory.
Advertisements

Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Conventional Magnets Technology Discussion Summary At the LCFOA meeting, 1May at SLAC Cherrill Spencer, ILC at SLAC 2nd May 2006.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d STEEL FABRICATTION TO DUCTILE IRON CASTING CONVERSION PROJECT NAME: CHARGE AIR PIPE.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
Measurement of Modular Coil Keystone Effect Peer Review 4/1/03.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
AGENDA: 1) SDO Procurement ACTIONS has noted at last meeting (10 June): ALEXANDER: magnetic forces during assembly to be computed. In case, we could assemble.
A Presentation On Construction Of Turbo Generator
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
SBS Magnet and Support Status Robin Wines June 2013.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Design of wide aperture/thin septa of extraction system for J-PARC-50GeV ring 1. The outline of septa system for 50GeVring 2. Designing of thin septa and.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Neutral Particle Sweeper Magnet Paul Brindza Nov 17, 2014.
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Full-scale trial results to qualify optimized manufacturing plan for ITER Toroidal Field coil winding pack in Japan Dummy double-pancake (DP) winding was.
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Status of the manufacturing process of a Nb3Sn wiggler prototype
Procurement, Measurement and Installation of 2 Octupoles for ATF
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Development of the Canted Cosine Theta Superconducting Magnet
Halbach Magnets: Design, Prototypes & Results
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
MICE Coupling Coil Update
MQXF updates P. Ferracin October 9th, 2014.
Ramesh Gupta Brookhaven National Laboratory
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
LARP Phase II Secondary Collimator RC-0 and RC-1
ESS MEBT Quadrupole magnets
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
MQXF quench heaters: tests and investigation (CERN)¶
Presentation transcript:

Brief Status Report on Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for ILC-BDS weekly meeting on 10th January 2006 ATF2Quad Fabrication Status Cherrill Spencer 01/10/06

ATF2Quad Fabrication Status Cherrill Spencer 01/10/06 4. General Assembly 1). Overview of general assembly: QEA-D32T180. NOT FINAL DRAWING. DO NOT USE 32mm bore 180mm core length 48 turns per water cooled coil Max gradient 55 T/m ATF2Quad Fabrication Status Cherrill Spencer 01/10/06

What’s happened: late Dec ’05- Jan ‘06 First core was measured on a CMM- results were sent out, hyperbola shapes not satisfactory-some bumps and dips outside the tolerance band. They modified the EDM program to have many more control points, thin test piece had much better shape, and 2nd core is being machined, will be measured by CMM, Spencer will inspect data Hollow conductor arrived ~20th Dec, insulation arrived ~27th Dec First two main coils were wound and potted First coil was cut in half and a thin cross section made. Video conference held on 9th/10th January amongst IHEP, KEK and SLAC to inspect the cut coil via TV and discuss measurement plan We inspected the turn’s pattern and quality of impregnation of the epoxy– looked fine, so they will continue to wind and pot coils By ~ 16th January - first magnet will be assembled Between now and ~20th Jan new, custom rotating coil system will be tested By ~ 27th January first magnet will be measured at IHEP by the new system. KEK people will be there. Standardization procedure will be developed. If first quad looks OK production assembly will be given go-ahead. ATF2Quad Fabrication Status Cherrill Spencer 01/10/06

First main coil, before trim added, before potting ATF2Quad Fabrication Status Cherrill Spencer 01/10/06

First main coil after trim added and both potted together. G10 fillers where # turns decrease Epoxy has no Al2O3 filler and so is transparent. Trim coil Ground wrap has become transparent through the potting process Dimensions of first coil meet tolerances. Resistance as expected. A 2.5mm ball was pushed through the conductor, indicating the water passage is clear. Two 1st coils been placed over 2 core quadrants- everything fits OK. ATF2Quad Fabrication Status Cherrill Spencer 01/10/06