Research on a new crystal-assisted positron source for the ILC

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Experimental Observation Of Lepton Pairs Of Invariant Mass Around 95 GeV/c² At The CERN SPS Collider 不変質量 95 GeV/c² 近傍のレプトン対の実験的観測 Contents 1. Introduction.
Status of the experiment at KEKB for the hybrid targets Junji Urakawa instead of T.Takahashi KEK Positron Workshop Durham 28 October 2009 First test of.
HKS Analysis Log Jun 2006 part3 D.Kawama. 0 .今回の目次 1.Target での dE/dX 2.HKS sieve slit simulation(Geant4)
時間的に変化する信号. 普通の正弦波 は豊富な情報を含んでいません これだけではラジオのような複雑な情報 を送れない 振幅 a あるいは角速度 ω を時間的に変化 させて情報を送る.
相関.
フーリエ係数の性質. どこまで足す? 理想的には無限大であるが、実際に はそれは出来ない これをフーリエ解析してみる.
本宮市立白岩小学校. 1 はじめに 2 家庭学習プログラム開発の視点 ① 先行学習(予習)を生かした 確かな学力を形成する授業づく り ② 家庭との連携を図った家庭学習の習慣化.
計算のスピードアップ コンピュータでも、sin、cosの計算は大変です 足し算、引き算、掛け算、割り算は早いです
人工知能特論II 第7回 二宮 崇.
信号測定. 正弦波 多くの場合正弦波は 0V の上下で振動する しかし、これでは AD 変換器に入れら れないので、オフ セットを調整して データを取った.
結城諒 司 吉田成 樹 完成予定図 O N! 7セグLE D ランダム表 示 OF F ? 数字が出たら 勝ち!!
Three-Year Course Orientation International Course.
方程式を「算木」で 解いてみよう! 愛媛大学 教育学部 平田 浩一.
移動エージェントプログラムの 動作表示のためのアニメーション言 語 名古屋大学情報工学コース 坂部研究室 高岸 健.
Kitenet の解析 (110118) 九州大学 工学部 電気情報工学科 岡村研究室 久保 貴哉.
音の変化を視覚化する サウンドプレイヤーの作成
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
GRANULAR VS COMPACT POSITRON CONVERTERS:ADVANTAGES & APPLICATIONS TO HYBRID SOURCES X.Artru (IPNL), R.Chehab (IPNL), M.Chevallier (IPNL), O.Dadoun (LAL),
Introduction Simulation Results Conclusion Hybrid Source Studies Olivier Dadoun A. Variola, F. Poirier, I. Chaikovska,
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
ILC e+ 源の現状 2 29-June-2015, ADI-J meeting T. Omori.
Experiments on beam deflection by crystals Masataka IINUMA Department of Quantum Matter Graduate School of Advanced Sciences of Matter Hiroshima University.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University LCWS/ILC10 Beijing Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola,
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
1 Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test.
E + ソースの現状 大森 GDE 活動報告会 2008 年 6 月 23 日 シカゴ GDE meeting に向けて 大森 GDE 活動報告会 2008 年 10 月 6 日 かなりの数のスライドが、栗木さんが先ごろ大邱 "2nd Asia ILC R&D Seminar, Sep 29-30,
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
HLab meeting 5/22/07 K. Shirotori. SP0 Beam decay background veto SP0 :  - from K - →  - +  0 Background  - is vetoed by detecting  rays from the.
Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
S-2S meeting Toshiyuki Gogami 後神 利志 20Aug2014. Contents S-2S 3D CAD WC detector Simulation for (K-,K+) experiment with SKS.
A Simulator for the LWA Masaya Kuniyoshi (UNM). Outline 1.Station Beam Model 2.Asymmetry Station Beam 3.Station Beam Error 4.Summary.
A_RD_6: Study and optimization of the power deposition density in new positron targets Masanori Satoh (Accelerator Laboratory, KEK) On behalf of collaborators:
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
CHANNELING 2014 COMPTE-RENDU R.CHEHAB R.Chehab/Channeling20141.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University 06 Se0temer 2012 POSIPOL2012 DESY Zeutzen Collaborators: V. Strakhovenko O. Dadoun,
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
ROBERT CHEHAB (IPNL/IN2P3/CNRS AND UNIVERSITE LYON 1) ON BEHALF OF ILC_IHEP_IPNL_POSITRON SOURCE GROUP ON BEHALF OF POSITRONS FOR LINEAR COLLIDERS: AN.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
R.Chehab/crystalcollim/Roma1 INTENSE PRODUCTION OF e+e- PAIRS WITH RADIATION FROM CRYSTALS Robert CHEHAB IPNL/IN2P3/CNRS and Université Lyon 1.
POLARIZED AND UNPOLARIZED POSITRON SOURCES FOR LINEAR COLLIDERS Robert CHEHAB IPNL/IN2P3/CNRS R.Chehab/JCL/Grenoble/20141 This talk is associated to the.
心臓および肝臓移植会社. 心臓移植は非常に複雑な 手技であり、 zoukiishoku119 は候補者の 評価から手技後のケアま で、各患者の治療に協力 チームアプローチをとっ ています。私たちの多分 野の移植グループには、 心臓専門医、心臓外科医、 看護師、心臓リハビリ専 門家、ソーシャルワー カーが含まれます。これ.
Research on a new crystal-assisted positron source for the ILC
A GRANULAR CONVERTER FOR A POSITRON SOURCE USING CHANNELING
T.Suwada Accelerator Laboratory, KEK
T.Suwada Accelerator Laboratory, KEK
Test of Hybrid Target at KEKB LINAC
AN HYBRID POSITRON SOURCE USING CHANNELING FOR ILC
POSITRON SOURCES FOR FUTURE COLLIDERS
Status of the CLIC main beam injectors
Investigation of laser energy absorption by ablation plasmas
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
Research on a new crystal-assisted positron source for the ILC
POSITRON SOURCES FOR LINEAR COLLIDERS
Summary for the Sources working group
The Treatment of Merchanting in Balance of Payments Statistics
A POSITRON SOURCE USING CHANNELING IN CRYSTALS FOR LINEAR COLLIDERS
Development of large GEM trackers
T.Fujita, K.Umemori, K.Yoshida V.Ababiy, A.P.Potylitsin, I.E.Vnukov
Presentation transcript:

Research on a new crystal-assisted positron source for the ILC このプレゼンテーションでは、出席者間で討論をし、アクション アイテムを作成する場合があります。PowerPoint を使って、プレゼンテーションの実行中にアクション アイテムを作成するには ... スライド ショーの実行中に control + クリック [会議メモ] をクリック [アクション アイテム] タブをクリック アクション アイテムを入力 [OK] をクリック このようにすると、入力したアクション アイテムを集めたスライドが、プレゼンテーションの最後に自動的に作成されます。 A_R&D_06 proposal T.Suwada (tsuyoshi.suwada@kek.jp) Accelerator Laboratory, KEK Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Collaboration Japanese Group K.Furukawa, T.Kamitani, T.Omori, M.Satoh, T.Suwada, J.Urakawa, Accelerator Laboratory, KEK K.Umemori, IMSS, KEK T.Takahashi, S.Kawada, Y.Uesugi, Hiroshima University French Group A.Variola, O. Dadoun, F. Poirier, I. Chaikovska, LAL-Orsay R.Chehab, X. Artru, M. Chevallier, IPNL-Lyon with collaboration of V. Strakhovenko , BINP-Novosibirsk Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Introduction It is a challenge task to construct a dedicated and also robust positron source towards the next generation of e+e- linear colliders. The present RDR-based ILC e+ (positron) source uses photo-production from a long helical undulator to generate positrons. A crystal-assisted positron source with a hybrid target would be another approach for the ILC, and this new scheme has been adopted as the CLIC positron source. We propose that the feasibility studies based on this new scheme need to be conducted under powerful collaboration between France and Japan. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

An atomic undulator for the generation of unpolarized positrons for CLIC and ILC An hybrid source using an atomic undulator (first proposition for a crystal source, Proceedings of PAC, Chicago, 1989) R.Chehab, A.Artru, F.Couchot, A.R.Nyaiesh, F.Richard Simulations of a hybrid source made of Ge or Si crystals as radiators and amorphous W as converters: For Ge and Si crystals oriented on <110> axis and 1 cm thick, we had e+ accepted yields of 0.5 to 0.6 e+/e- for 0.5 Xo thick converter and 1.2 to 1.3 e+/e- for 1 Xo thick; the incident e- energy is 20 GeV R. Chehab, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

New hybrid target scheme for positron production THE HYBRID SCHEME FOR FUTURE LINEAR COLLIDERS Assuming thin crystal target and, hence, moderate heating in it and in order to lower the amount of energy deposited in the amorphous target and also the PEDD, the following scheme has been proposed by [R.Chehab, V.M.Strakhovenko, A.Variola] This new scheme is the basis of the present common research between France and Japan. Magnet Putting a drift between the 2 targets allows sweeping off the charged particles coming from the crystal; only the ϒ impinge on the amorphous target R. Chehab, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Development of simulation code at LAL-Orsay + X. Artru simulation The present work is consisting in the combination of X. Artru’s program on channeling with GEANT4. The new program will be used for extended simulations and for the KEKB experiment (data analysis). O. Dadoun, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Experimental status at KEK The purpose is the experimental evaluation for the hybrid-target scheme. Particularly, to estimate the positron-production efficiency, and to evaluate the heat load on a hybrid target. The positron-production experiments based on a hybrid target has been continued with 8-GeV e- beam at KEK and the systematic studies were carried out on the positron-production efficiency in 2010. The experiments on the heat load with a hybrid target has been continued from 2011, and however, they have been carried out as only a test experiment with 3-GeV e- beam due to the Tohoku heavy earthquake. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Experimental site at KEKB LINAC Switchyard KEKB Linac 8-GeV e- beam 1nc/bunch upto 25Hz single bunch Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Site Set up at the KEK Linac Looking up from Down stream Max. Ee-=8GeV Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France 9

This is the beginning of the earthquake (11 Mar.2011). Long (~3 minutes) and strong (6 lower in Japanese scale) earthquake we never experienced! KEK Tohoku area hypocenter ~0.2 s (~5 Hz) K-Netによる加速度の観測 (防災科学技術研究所提供) 342.9 gal 328.8 gal Tsukuba Tsukidate Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Drop-down of a quadrupole triplet and the recovery work is in progress! Beamline Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Experimental Setup based on the hybrid target scheme amorphous W 8 mm 18 mm 8GeV e- Sweeping Magnet 0.96T 0.75m Analyzing magnet 5 ~ 30MeV 1mm thick W crystal Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

pictures e- 8GeV Sweeping magnet W Crystal on the goniometer Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

pictures thermocoupoles attached back end amorphous targets Amorphous Ws mounted on a linear stage movable stage Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Experimental scheme Hybrid scheme Conventional scheme e- 8GeV γ positrons from the target momentum analyzed Amorphous W sweep mag 1mm-thick W Crystal on axis (aligned to the beam) off axis (not aligned to the beam) temperature at the end of the targets by thermocouples and infrared camera Amorphous W e- 8GeV amorphous Ws 1.75, 3.5, 5.25, 8, 18mm Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Rocking curve measurement Amorphous W 8-GV e- sweep magnet Crystal W on a goniometer 8 mm rotaion in vertical plain Fitting function for the rocking curve Preliminary factor 3 enhancement positron yield (arb. unit) [mrad] angle of crystal axis<111> w.r.t. beam (mrad) Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Positron yield measurement Ee- = 8GeV, Pe+ = 20MeV e+ detected [a.u] amorphous W thickness [mm] Need more simulations for analyzing the magnet collimator , detector to evaluate e+ yields Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Temperature Measurement with 8-GeV e- beam Temperature of the 8mm amorphous W target for the hybrid case Beam charge ~1nC/bunch, 25Hz Preliminary Temperature (degree Celsius) ΔT~32 degree Base temp. 23.3deg. Time from Beam On (Minutes) Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Temp. rise vs. total energy deposit Temperature at equilibrium has information for total energy deposit except for 18mm hybrid (measured) conventional 18mm hybrid on axis target thickness is larger than shower maximum hybrid off axis T at equilibrium (deg.) 8mm (simulation)

Development of a thermocouple array to measure temperature rise of the target Thermocouple array fixed at the back plane of amorphous target Thermocouple 1mm x 1mm to fast data logger read temperature each 10ms temperature at equilibrium 9 thermocouples are fixed on the target with use of silver paste total energy deposit bunch by bunch temperature variation PEDD information by thermocouple Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Test results on pulse-by-pulse Temp. rise measurement (3-GeV e- beam) 3-GeV e- single-bunch beam is directly hitting at the center of target. 温度 The pulse-by-pulse temp. measurement has been successfully performed at the rep. rate of 1Hz. A clear signal was obtained from each thermocouple. 2mm 1秒 1mm 1℃ 1s Clear temp. signal trace with a data logger has been obtained in a test measurement. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Funding requests in 2012 From French group Euro/unit Nb of units Total (Euro) PhD Student stay in France 1000/month 3 months 3000 Visit to Japan (2 visits) 150/day 10 days Travels (2) 1000 2 travels 2000 Total 8000 From Japan group kYen/unit Nb of units Total (kYen) Travel (3persons) 750 1 travels Visit to France(3persons) 60/day 10 days 600 Total 1350 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France

Summary The systematic study on positron-production efficiency has been successfully carried out with 8-GeV e- beam at KEK. Test measurements for the thermocouple array detector have been preliminary conducted to evaluate the pulse-by-pulse temperature rise with 3-GeV e- beam. The systematic simulations to estimate the detector acceptance are in progress with a new simulation code taking into account crystal effect. Due to unfortunate heavy earthquake, the recovery work of the KEKB linac is in progress, and after the suitable recovery in this September, we will restart our experiments as soon as possible. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, 28-29 May 2012, Le L.P.C., Clermond-Ferrand, France