Solution to Problem 2 Developed by: Alex J. Ruiz-Torres, Ph.D.

Slides:



Advertisements
Similar presentations
Chapter 3 Project Management.
Advertisements

Prosjektstyring A 5 WEEKS B 10 WEEKS C 12 WEEKS D 8 WEEKS E 6 WEEKS ACTIVITY (t) ESEF FL LS LF We have a network with.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Fall 2001BA Project Management1 BA 301 – Spring 2003.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Critical Path Method (CPM)
WEEK 15A – PROJECT MANAGEMENT (CHAPTER 3) Characteristics, tools, Pert/CPM, critical path, slack calculation, crashing SJSU Bus David Bentley1.
18-1Project Management Chapter 18 Project Management.
Project Scheduling: Networks, Duration estimation, and Critical Path.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
Chapter 16 – Project Management
Project Management Dr. Everette S. Gardner, Jr.. Project Management2 PERT / CPM advantages 1. Disciplined planning 2. Realistic objectives 3. Unambiguous.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
Project Management Chapter 3 BUSI 2106 – Operations Management.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Project Management CPM, PERT, Crashing – An Illustrative Example
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Project Management Chapter 17.
PROJECT BUDGETING The overall goal in the budgeting process of a project is to determine how much money is to be spent each week or each month. PERT /
Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
2/28: More CPM: Crashing Roll call / return exams / return homework Review: Critical Path Management –Creating the CPM diagram –Calculating the critical.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Chapter 3 Project Management.
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Operations Management Project Management
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
PERT/CPM F G A E H I J K D St T B C
Time-Cost Trade-off Models
PERT CPM assumes duration of activity is known with certainty.
Project Management.
Project Management Critical Path Method Demonstration
Project Time Management.
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management CPM Method Tutorial-p2
Decision making and Organization Management
Project Management Planning Models
Probabilistic Time Estimates
ENM448-Project Planning and Management
Chapter 3 Project Management.
IS Project Management Mini review
Project Management CPM Method Tutorial-p1
תזמון פרויקטים.
Project Scheduling: Lagging, Crashing and Activity Networks
Solution to Problem 1 Developed by: Alex J. Ruiz-Torres, Ph.D.
Project Management Time-Cost Model Tutorial
BEST VIEWED IN SLIDE SHOW MODE
ELC 347 project management
Exercise – A small building.
Planning and Managing Projects
Presentation transcript:

Solution to Problem 2 Developed by: Alex J. Ruiz-Torres, Ph.D.

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T ES EF LS LF ES EF LS LF X ES EF LS LF Z ES EF LS LF U Y W T ES EF LS LF ES EF LS LF

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF ES EF LS LF 7 X ES EF LS LF Z ES EF LS LF U Y W T ES EF LS LF ES EF LS LF

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF ES EF LS LF 7 X ES EF LS LF Z ES EF LS LF U Y W T 0 6 LS LF ES EF LS LF 6

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF 7 13 LS LF 6 7 X ES EF LS LF Z ES EF LS LF U Y W T 0 6 LS LF ES EF LS LF 6

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF 7 13 LS LF 6 7 X ES EF LS LF Z 7 12 LS LF 5 U Y W T 0 6 LS LF ES EF LS LF 6

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF 7 13 LS LF 6 7 X ES EF LS LF Z 7 12 LS LF 5 U Y W T 0 6 LS LF 6 10 LS LF 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T 0 7 LS LF 7 13 LS LF 6 7 X 13 27 LS LF 14 Z 7 12 LS LF 5 U Y W T 0 6 LS LF 6 10 LS LF 6 4

  Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 The duration of the project under normal times is 27 weeks 0 7 LS LF 7 13 LS LF 6 7 X 13 27 LS LF 14 Z 7 12 LS LF 5 U Y The cost of this project under normal times is $125K W T 0 6 LS LF 6 10 LS LF 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 LS LF 7 13 LS LF 6 7 X 13 27 14 Z 7 12 LS LF 5 U Y W T 0 6 LS LF 6 10 LS LF 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 LS LF 7 13 LS LF 6 7 X 13 27 14 Z 7 12 LS LF 5 U Y W T 0 6 LS LF 6 10 9 13 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 LS LF 7 13 LS LF 6 7 X 13 27 14 Z 7 12 8 13 5 U Y W T 0 6 LS LF 6 10 9 13 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 LS LF 7 13 6 7 X 13 27 14 Z 7 12 8 13 5 U Y W T 0 6 LS LF 6 10 9 13 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 7 13 6 7 X 13 27 14 Z 7 12 8 13 5 U Y W T 0 6 LS LF 6 10 9 13 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 7 13 6 7 X 13 27 14 Z 7 12 8 13 5 U Y W T 0 6 1 7 6 10 9 13 6 4

X Z U Y W T The critical path is Z-X-U Weeks $K CT NT NC CC Rate Pred   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 7 13 6 7 X 13 27 14 Z 7 12 8 13 The critical path is Z-X-U 5 U Y W T 0 6 1 7 6 10 9 13 6 4

X Z U Y W T The critical path is Z-X-U Weeks $K CT NT NC CC Rate Pred   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 0 7 7 13 6 7 X 13 27 14 Z 7 12 8 13 The critical path is Z-X-U 5 U Y W T 0 6 1 7 6 10 9 13 6 4

Activity Z We will crash the lowest cost in the CP   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 We will crash the lowest cost in the CP Activity Z Crashing Z by one week will result in a project duration of 26 weeks total cost of $125 + $3 = $128

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 7 6 X 14 Z 5 U Y W T 0 6 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 5 U Y W T 0 6 6 10 8 12 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 7 12 5 U Y W T 0 6 6 10 8 12 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 7 12 5 U Y W T 0 6 6 10 8 12 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 7 12 5 U Y W T 0 6 6 10 8 12 6 4

X Z U Y W T The critical paths are Z-X-U W-X-U Weeks $K CT NT NC CC   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 7 12 The critical paths are Z-X-U W-X-U 5 U Y W T 0 6 6 10 8 12 6 4

X Z U Y W T The critical paths are Z-X-U W-X-U Options   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 6 The critical paths are Z-X-U W-X-U Options Crash Z and W: 6.67 Crash X: 3.5 Crash U: 5 0 6 6 12 6 7 6 X 12 26 12 26 14 Z 6 11 7 12 5 U Y W T 0 6 6 10 8 12 6 4

Activity X We will crash the lowest cost in the CP   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 We will crash the lowest cost in the CP Activity X Crashing X by one week will result in a project duration of 25 weeks total cost of $128+ $3 .5= $131.5

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 6 5 0 6 7 6 X 14 Z 5 U Y W T 0 6 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 5 0 6 7 6 X 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 7 11 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 7 11 6 4

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 7 11 6 4

X Z U Y W T The critical paths are Z-X-U Z-Y-U W-X-U W-Y-U Weeks $K CT   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 The critical paths are Z-X-U Z-Y-U W-X-U W-Y-U 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 7 11 6 4

X Z U Y W T The critical paths are Z-X-U Z-Y-U W-X-U W-Y-U Options   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 6 5 The critical paths are Z-X-U Z-Y-U W-X-U W-Y-U Options Crash Z and W: 6.67 Crash X and Y: 9.5 Crash U: 5 11 6 11 6 5 0 6 7 6 X 11 25 14 Z 6 11 6 11 5 U Y W T 0 6 6 10 7 11 6 4

Activity U We will crash the lowest cost in the CP   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 6 5 We will crash the lowest cost in the CP Activity U Crashing U by one week will result in a project duration of 24 weeks total cost of $131.5+ $5= $136.5

Done with 3 iterations All crash plan

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 2 0 5 5 X 12 Z 4 U Y W T 0 3 3 3

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 5 7 2 0 5 5 X 12 Z 5 9 4 U Y W T 0 3 3 6 3 3

X Z U Y W T Weeks $K CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23   Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 5 7 2 0 5 5 X 9 21 12 Z 5 9 4 U Y W T 0 3 3 6 3 3

  Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 … 21 5 7 2 0 5 5 X 9 21 12 Z The duration of this project under “all crash” times is 21 Weeks 5 9 4 U Y W T 0 3 3 6 3 3

  Weeks $K  CT NT NC CC Rate Pred Z 5 7 12 18 3.00 W 3 6 23 34 3.67 X 2 32 46 3.50 Z, W Y 4 16 22 6.00 T 24 10.00 U 14 28 5.00 Y, X, T Time Cost 27 $125 26 $128 25 $131.5 24 $136.5 … 21 $182 5 7 2 0 5 5 X 9 21 12 Z The cost of this project under “all crash” times is $182K 5 9 4 U Y W T 0 3 3 6 3 3

Tradeoff plot