TVA RC 2017 Summer Outlook TVA RC July 27, 2017.

Slides:



Advertisements
Similar presentations
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Advertisements

1 April 27, 2011 Southeast Tornado Event System Operator Conference September and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
2014 Summer Weather Outlook Temperatures, Precipitation, Drought, and Hurricanes.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Temperature-Sensitive Loads and Class Cost Allocation Presentation to Utah Cost-of-Service Working Group Kevin Higgins, Energy Strategies July 13, 2005.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Peak RCCo Performance Metrics Draft –November 2013.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
2008 Summer Operating Expected Conditions Bulk Power Operations Power Coordination Center Bulk Power Operations Power Coordination Center.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
How Markets Fared this Summer and What to Expect in 2007 IEP 25 th Annual Meeting October 9, 2006 Steve McClary MRW & Associates, Inc. Oakland, California.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Summer 2006 In Review David Hood September 21, 2006.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 TVA Reliability Coordinator LG&E/KU ITO Spring Stakeholder Meeting Terry Williams and Jonathan Prater Tennessee Valley Authority 07/21/16.
Customer Presentation June 22, 2010 Allen Leverett – Executive Vice President and Chief Financial Officer.
System Status Update February Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What.
Transmission Planning in ERCOT- Overview
Wind Management at MISO
Hurricane Rita.
Status Update for Reliability/Market Power Mitigation Assessment
Review of Abnormal MCPEs
2018 VELCO IRP Forecast Preliminary results
MRES Resource Operations in SPP
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Local Area Planning Update to TRANSAC – March 15, 2017
Solar Eclipse Overview August 2017
Key Findings and Resource Strategy
Mgr. Interconnection Reliability Initiatives
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Cold Snap Task Force Update
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Southern Company Summer 2018 Outlook & Winter Review
Enhanced Curtailment Calculator (ECC)
2017 Flow, Debris, spill and TDG
RE Grid Integration Study with India
PacifiCorp-CAISO-NVE EIM Initiative Overview
Transmission System Update
Solar Energy Commercialization
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

TVA RC 2017 Summer Outlook TVA RC July 27, 2017

2017 Summer Outlook: Executive Summary Position, Weather & Load TVA summer peak forecast for August is 30,101 MW @ 96°, a temperature change of 1° above normal adds 200 – 300 MW LGE/KU 7193 MW projected peak, August AECI projected peak 4635 MW, July Hydro Near normal rainfall but below normal runoff throughout the summer Nuclear WBN 02 FO RTS July Coal none Gas JOT 01–10 PO (532 MW) New Facilities Paradise Combined Cycle (PCC) 3x1 CC plant Replaces PAF Units 1 and 2 (PAF U3 not affected) Beginning testing September 2017 Scheduled for commercial operation June 2018

Summer 2017 Temperatures Expecting a slightly warmer than normal summer Degrees above normal: June +3, July +2, Aug +1 Precipitation above normal Hurricane season forecast to be below normal Forecasted Peak in August 2017 is 30,101 MW at 96°F. Actual peak for 2016 was 29,754 MW at 96°F. Not expecting prolonged extreme heat this summer Key analogs: 2013,2015

Operational Planning Summer Studies Study Scenarios Peak Case – Forecasted load in SDX Extreme Peak –Forecasted load scaled up 15% Low Hydro—Tributary hydro units off, Main river reduced Shoulder Period—Scaled down 20%, pump Raccoon, Rocky Mtn., Carter’s Dam Transfer Case—N-S, S-N, W-E transfers applied

Transmission Constrained Areas for Summer 2017 Johnsonville Switch-house and Transformer replacement Constraint: Various 161 kV lines terminating at Johnsonville FP Contingency: Various elements Shawnee Fossil - Bypass DOE yards Constraint: various 161 kV lines Contingency: Various elements Northeast Area Constraint: Volunteer-Phipps Bend 500-kV line Phipps Bend 500-kV yard bypassed. Contingency: Various elements West Point Switch-house and Transformer replacement Constraints: Lowndes and Clay transformers, various 161 kV lines Contingency: Various elements Raccoon Mountain Pumping: Constraint: WCF 500/161 kV bank Contingency: Various elements Raccoon Mountain Generating Constraint: WCF-SQN 500-kV line

LGE/KU Outages Clark Co - Fawkes KU 138kV 7/24/17-10/19/17 Currently info only

Solar Eclipse August 21, 2017

Solar Eclipse - August 21, 2017 90% or greater over coverage all of TVA Service territory Major load center will be in the dark for 2 mins and 45 sec (Nashville, Clarksville) Lessons learned from European Eclipse in 2015

Solar Eclipse Effects - August 21, 2017 Expect to lose 90% or more of solar capacity (~400 MW) Exterior lighting will be a significant load contributor to TVA in Nashville metro area Even in the 90% area, interior lighting usage will increase Temporary decrease in temperature should slow demand growth if briefly during afternoon climb. Expect a significant rebound from lights shutting off and solar capacity return

Solar Eclipse Mitigation - August 21, 2017 Ensure adequate, responsive generating reserves will be available to adjust for any needed system changes TVA BA is planning to make generation adjustments to offset potential load/generation impacts. As a Reliability Coordinator, TVA will be working with other Reliability Coordinators (SOCO, PJM, MISO) to ensure adequate generation reserves are available to respond to power system changes during the eclipse.

Additional RC Updates Completed seven week cycle of RC restoration Drill to meet EOP-006 for member systems within TVA RC footprint in July TVA RC member company face to face meeting to be held in September in Chattanooga TVA RC expanded model work progressing to add MISO and SPP full models to state estimator Expanding the Voltage Stability Monitoring Tool to include RC member companies Working with Congestion Management entities to update existing freeze date model for NNL allocation